- Information Notice 2012-20, Potential Chloride-Induced Stress Corrosion Cracking of Austenitic Stainless Steel and Maintenance of Dry Cask Storage System Canisters +
- Information Notice 2012-21, Reactor Vessel Closure Head Studs Remain Detensioned During Plant Startup +
- Information Notice 2012-19, License Renewal Post-Approval Site Inspection Issues +
- Information Notice 2012-17, Certified Material Test Reports and Age Hardened Concrete Compressive Strength +
- Information Notice 2012-15, Use of Enclosures to Mitigate Leakage From Joints That Use A-286 Bolts +
- Information Notice 2012-13, Boraflex Degradation Surveillance Programs And Corrective Actions In The Spent Fuel Pool +
- Information Notice 2012-25, Performance Issues with Seismic Instrumentation and Associated Systems for Operating Reactors +
- Information Notice 2012-10, Recent Issues Associated With Submittal Of NRC Form 396, Certification Of Medical Examination By Facility Licensee, For Applicants And Licensed Operators At Non-Power Reactors +
- Information Notice 2012-14, Motor-Operated Valve Inoperable Due To Stem-Disc Separation +
- Information Notice 2012-12, HVAC Design Control Issues Challenge Safety System Function +
- Information Notice 2012-07, Tube-to-Tube Contact Resulting in Wear in Once-Through Steam Generators +
- Information Notice 2012-03, Design Vulnerability In Electric Power System +
- Information Notice 2012-05, Abnormal Releases of Radioactive Water Potentially Resulting in Groundwater Contamination +
- Information Notice 2012-04, Impacts on Normal Plant Operations Due to Leaks or Spills of Chemicals +
- Information Notice 2012-11, Age Related Capacitor Degradation +
- Information Notice 2012-16, Preconditioning of Pressure Switches Before Surveillance Testing +
- Information Notice 2012-08, High Dose-Rate Remote Afterloader (HDR) Physical Presence Requirements +
- Information Notice 2012-01, Seismic Considerations--Principally Issues Involving Tanks +
- Information Notice 2012-06, Ineffective Use of Vendor Technical Recommendations +
- Information Notice 2012-02, Potentially Nonconservative Screening Value For Dam Failure Frequency In Probabilistic Risk Assessments +
- RIS 2012-12, Withdrawn NRC Regulatory Issue Summary 2012-12, Licensing Submittal Information and Design Development Activities for Small Modular Reactor Designs +
- RIS 2012-04, Notice of Revision to the Criteria for Identifying Materials Licensees for Discussion at the Agency Action Review Meeting +
- RIS 2012-03, Reintegration of Security Into The Reactor Oversight Process Assessment Program +
- RIS 2012-02, Insights Into Recent License Renewal Application Consistency With The Generic Aging Lessons Learned Report +
- RIS 2012-11, NRC Staff Position on Applying Boiling Water Reactor Technical Specification Requirements During Operations With a Potential For Draining the Reactor Vessel +
- RIS 2012-09, Endorsement of Nuclear Energy Institute Guidance Using An Alternative Method to Manage Cumulative Fatigue At Nuclear Power Reactor Sites +
- Information Notice 2012-15, Use of Enclosures to Mitigate Leakage from Joints That Use A-286 Bolts +
- Information Notice 2012-13, Boraflex Degradation Surveillance Programs and Corrective Actions in the Spent Fuel Pool +
- Information Notice 2012-10, Recent Issues Associated with Submittal of NRC Form 396, Certification of Medical Examination by Facility Licensee, for Applicants and Licensed Operators at Non-Power Reactors +
- Information Notice 2012-14, Motor-Operated Valve Inoperable Due to Stem-Disc Separation +
- RIS 2012-10, NRC Staff Position on Applying Surveillance Requirements (SR) SR 3.0.2 and 3.0.3 to Administrative Controls Program Tests +
- Information Notice 2012-03, Design Vulnerability in Electric Power System +
- RIS 2012-03, Reintegration of Security Into the Reactor Oversight Process Assessment Program +
- RIS 2012-02, Insights Into Recent License Renewal Application Consistency with the Generic Aging Lessons Learned Report +
- RIS 2012-11, NRC Staff Position on Applying Boiling Water Reactor Technical Specification Requirements During Operations with a Potential for Draining the Reactor Vessel +
- RIS 2012-09, Endorsement of Nuclear Energy Institute Guidance Using an Alternative Method to Manage Cumulative Fatigue at Nuclear Power Reactor Sites +
- Information Notice 2012-02, Potentially Nonconservative Screening Value for Dam Failure Frequency in Probabilistic Risk Assessments +
- Information Notice 2012-18, Failure to Properly Augment Emergency Response Organizations +
- Information Notice 2012-22, Counterfeit, Fraudulent, Suspect Item Training Offerings +
- RIS 2012-08, Nuclear Regulatory Commission Regulatory Issue Summary 2012-08: Developing Inservice Testing and Inservice Inspection Programs Under 10 CFR Part 52 +
- RIS 2012-07, Withdrawn NRC Regulatory Issue Summary 2012-07 Preparation and Scheduling of Operator Licensing Examinations +
- Information Notice 2012-09, Irradiation Effects on Fuel Assembly Spacer Grid Crush Strength +
- RIS 2012-01, Availability of Safety Culture Policy Statement +
- RIS 2012-06, NRC Policy Regarding Submittal of Amendments for Processing of Equivalent Feed at Licensed Uranium Recovery Facilities +