Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17332A964 +
- ML17332A963 +
- ML17332A957 +
- ML18065A146 +
- ML20093K747 +
- ML20093F806 +
- ML20093F544 +
- ML20093F474 +
- ML20093E995 +
- ML20093E975 +
- ML20093E854 +
- ML20093E829 +
- ML20093E343 +
- ML20137K821 +
- ML20137L046 +
- NRC-95-4574, Forwards Justification for Use of ASME Code,Section Viii for Const of Air Storage Tanks in Emergency Habitability Sys,Per Request +
- GO2-95-210, Forwards Response to NRC 950907 Re Violations Noted in Insp Rept 50-397/95-16.Corrective Actions:Implemented Extensive Performance Enhancement Strategy Program +
- ST-HL-AE-5157, Forwards Physical Security Plan Temporary Addenda That Reflects Addl Security Measures During Const Activities Associated W/Vehicle Barrier Upgrade Project.Plan Withheld +
- L-95-273, Forwards Rev 47 to Physical Security Plan for Plant & Has Determined That Rev Does Not Decrease Effectiveness of Plan. Encl Withheld +
- ST-HL-AE-5197, Clarifies Statement by Noting That Unit 1 Inconel Stem Replaced During Fifth Refueling Outage Ended on 950414 & Unit 2 Stem Replaced After Apr 25th Overspeed Occurrence +
- ST-HL-AE-5203, Forwards Addl Info Re Proposed Amend to TS Surveillance 4.8.1.1.2.e.7 to Allow Performance of Surveillance W/Plant at Power +
- HL-5044, Forwards Monthly Operating Repts for Sept 1995 & Revised Page E1-4 for Aug 1995 Repts +
- BSEP-95-0459, Advises of Util Revised Plans for Insp of Feedwater Nozzle Blend Radii.Rev 1 to NEDC-30633, Brunswick Steam Electric Plant Unit 2 Feedwater Nozzle Fracture Mechanics Analysis, Encl +
- ML20265E744 +
- ML20265C529 +
- 05000289/LER-1995-003-01, :on 950909,reactor Coolant Leak Occurred Due to Crack Weld in Cold Leg Drain Line.Failed Line Replaced.W/ +
- 05000280/LER-1995-007, :on 950912,boron Crystals & Corrosion Products Discovered Outside Diameter of Vessel.Caused by through-wall Leakage.Work Request Initiated,Engineering & Shift Supervisor Notified +
- 05000316/LER-1995-006-01, :on 950908,Unit 2 Reactor Thermal Power Trip Occurred.Caused by Cognitive Error by Operations Personnel. Surveillance Procedure Revised to Add Caution on Operation of Reactor Trip Breaker Control Switch +
- IR 05000315/1995010 +
- ML17332A960 +