ML17332A957
| ML17332A957 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 10/09/1995 |
| From: | Fitzpatrick E INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| AEP:NRC:1239, NUDOCS 9510130176 | |
| Download: ML17332A957 (5) | |
Text
PRIORITY 1 (ACCELERATED RIDS PROCESSING) 8(
<~
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9510130176 DOC.DATE: 95/10/09 NOTARIZED: NO DOCKET FACIL:50-315 Donald C.
Cook Nuclear Power Plant, Unit 1, Indiana M
05000315 P
AUTH.NAME AUTHOR AFFILIATION FITPATRICK,E.E.
(formerly Indiana 6 Michigan Ele RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Provides commitments re. barrel former bolt issue for DC Cook Nuclear Plant Unit 1.
DISTRIBUTION CODE:
A001D COPIES RECEIVED LTR ENCL SIZE TITLE: OR Submittal:
General Distribution'OTES 0
RECIPIENT ID CODE/NAME PD3-1 LA HICKMAN,J INTERNA.
FIRE CEN.
Ol RR/DRCH/HICB NRR/DSSA/SRXB OGC/HDS2 EXTERNAL: NOAC COPIES LTTR ENCL 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD3-,1 PD NRR/DE/EMCB NRR/DSSA/SPLB NUDOCS-ABSTRACT NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 D
0 N
NOTE,TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE!
CONTACT THE DOCUMENT CONTROL
- DESK, ROOM OWFN 5DS (415-2083)
TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDl TOTAL NUMBER OF COPIES REQUIRED:
LTTR 12 ENCL 11
'I-t
Indiana Michigan Power Company PO Box 16631 Columbus, OH 43216 IRON NA NICHIGAN PQNLR October 9, 1995 AEP:NRC:1239 Docket Nos.:
50-315 U.
S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D. C.
20555 Gentlemen:
Donald C.
Cook Nuclear Plant Unit 1 COMMITMENTS REGARDING BARREL FORMER BOLT ISSUE On September 26,
- 1995, a meeting was held at the NRC offices in White Flint, Md, to provide a status of the issues associated with barrel former bolts for the Donald C.
Cook Nuclear Plant unit l.
As requested by the NRC staff at the meeting, the attachment to this letter describes our intended future actions regarding these issues.
Sincerely, E.
E. Fitzpatrick Vice President pit Attachment CC:
A. A. Blind G. Charnoff H. J. Miller NFEM Section Chief NRC Resident Inspector
- Bridgman J.
R. Padgett Q 0 f'ig 7 951013017b 951009 l
PDR ADOCK 05000315 P...,..
PDR 4
"&DU': A1" ~~
~
ATTACHMENT TO AEP:NRC:1239 INTENDED FUTURE ACTIONS REGARDING BARREL
- FORMER BOLT ISSUES FOR DONALD C.
COOK NUCLEAR PLANT UNIT 1
4 ATTACHMENT TO AEP:NRC:1239 Page 1
The following are our intended future actions regarding the barrel former bolt issues for the Donald C.
Cook Nuclear Plant Unit 1.
Inspections will be performed of, the unit 1 barrel former bolts next refueling outage.
The scope and technology will be determined and communicated to the NRC prior to the inspection.
3.
We will continue to refine the root cause analysis.
An appropriate repair approach and repair techniques and procedures will be developed as necessary.
4.
Neutron noise monitoring willbe performed periodically during Unit 1 Cycle 15.
The data willbe analyzed and compared to criteria established per Westinghouse recommendation.
5.
The Digital Metal Impact Monitoring System (DMIMS) will be used during Unit 1 Cycle 15 to monitor for loose parts.
Westinghouse and AEP will jointly monitor startup operations.
The data obtained in conjunction with a loose parts alarm on the DMIMS reactor vessel channels will be analyzed by Westinghouse.
If it is determined that the alarm was triggered by a loose barrel former bolt, the NRC will be notified by a
special report.