Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19253B937 +
- ML19253B936 +
- ML19031B652 +
- ML18227D346 +
- ML20125B278 +
- ML20260B477 +
- ML20234E798 +
- ML20238F418 +
- ML20236N085 +
- IR 05000155/1976013 +
- 05000029/LER-1976-006, Forwards LER 76-006/01T-0 +
- 05000029/LER-1976-007, Forwards LER 76-007/01T-0 +
- 05000029/LER-1976-006-01, /01T-0:on 760624,during Normal Operation,Routine Safety Injection Tank Makeup Was Performed Per Plant Procedure.Acceptance Criteria Not Met.Caused by Change 117, Suppl 3,requiring Limits on Boron Concentration +
- 05000029/LER-1976-007-01, /01T-0:on 760624,investigation of RO 76-06 Revealed That Assumed Boron Concentration of LOCA Analysis Was Exceeded During Hydrostatic Leak Test of Reactor Vessel. Caused by Personnel Error.Personnel Reinstructed +
- ML19340A753 +
- ML20024C720 +
- ML19326A613 +
- ML19326A618 +
- L-76-248, Referring to FPLs Letter of 6/23/1976, Letter Furnishing Supplemental Information Concerning Transfer of Spent Fuel Between Unit Nos. 3 & 4 +
- 05000335/LER-2076-029, Contrary to Tech Spec 4.3.3.3.1, Required Channel Check of 2 Triaxial Accelerographs Was Not Performed within Required Time Frame +
- ML19224C069 +
- ML19317G959 +
- ML19206B211 +
- ML19345A370 +