ML18227D346
| ML18227D346 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 07/08/1976 |
| From: | Robert E. Uhrig Florida Power & Light Co |
| To: | Stello V Office of Nuclear Reactor Regulation |
| References | |
| Download: ML18227D346 (7) | |
Text
I NAG FDRM 195 I I7 76)
TO:
r1'
~
'4
~
~
FRoM:Flordia Power
&. Light Co4 Miami, Flordia R.E, Uhrig U.si NUGLEAflREGULATDRv coMMIssIDN v'
NRC DISTRIBUTION PART 50 DOCKET MATERIAL DOCKET NUMOER FILE NUMOER DATE OF DOCUMFNT 7-8-76 DATE RECEIVEb 7-12-76 I gLETTER I
R3ORIQINAL I
OCOPV QNOTOR)ZED
. i PROP 8 UNDLA'SSI FIED INPUT FORM I
NUMOER OF COPIES RECEIVED I pESCRIPTION Ltr; re. their 6'-.23-76 ltr.....'upplemental Information concernin'g the transfer of spent fuel between Unit 8 3
&c 4.......
~,
1 Signed Cy. REceiveD)
( 3 Pages)-
ENCLOSURE j'4 c
'X)ONPZ gEMOVN Cgypg 4ti'4
~ /p
~ PLANT NaM:
Turkey Pt.
0 3
& 4
~ =
~ k,d
,t)Q4.'/t ~~~',.SAFFTY A-'SSYG44'ED AD:
NCH CIIXEF:
~XIROJZCT r IAN4%GER:
4'~A'SST.:
~
~ <<'c i
ci ASSXG"iED AD'RO C- "~.NA, i".'t..'B.'i-,-",".-"-'- -- FOR ACT(ON/INFORMATION'LAB~i7-15-76i A <<CiT4
~
c<<
~
4c 4
i' cc.
,c.gcE t
~
SSH'K & STAFF 1IIPC
-EBS
" 'RR99EGT r IAV4AGENENT
-""': SOY-D P
COLLINS
-HOUSTON PETF.RSON IIELTZ HELTE)IES SKOVliOLT INTERNALD
>,SYS+Fy~IS
.,SAFETY
'HKXCFkIAN SGHR'Oi DER ENGINBERING HACGAit!<Y KMjPHl.'.I}MZL~.
, -MMJ-ICKI--
., REAQZtlR SAFE IIY
'.ROSS.4-'=--..-
NOVAK ROS2+OCZY CHECK AT& I sALTzr'uiN RUT.B) I(Ci ISTRI BUTION
'QT
~4, P~
~ '
i BEMA'ROYA'-4'P POL'I70""."4 KIRK)POOD OPEIUiTING.REACTORS OPERATOR ~CH E
XSEi%i'IIAO BUTI,FR-xr)ES
~
SXTE SA F~
ENVXRO..A><AL STS DT:
V ENV A4t v
j<<4ct S X~~A'4Ii IJ2 Ui'OL DR:
XC:
SIC ASLB ~
.RS 16CYS nKIXmrNg.':.N EX TLI)MALDISTR I OU 1'ION NAT LA)I:
REG-VIE LA PDR CONSVLTnNrS Bl)0()kl)AVFN NA1'ILRXKS~ON 0)NL CONl'IIOLNUMBEI)
" 6942
~.I ~ <>
n
,~)()'~'~.-'"
estate~
4M+
Ql
)DgV
~ g '0 goO
~opia FLORIDA POWER 8E LIGHT COMPANY July 8, 1976 L-76-248 Office of Nuclear Reactor Regulation Attn:
Mr. Victor Stello, Jr., Director Division of Operating Reactors U. S. Nuclear Regulatory Commission Washington, D.
C.
20555
Dear Mr. Stello:
Re:
Turkey Point Plant Unit Nos.
3 and 4
Docket Nos.
50-250 and 50-251 Su lemental Information
~~~//y+
/gp
~ CI,Q>>
~ gX Our letter to you dated June 23, 1976 (L-76-234) forwarded information concerning the transfer of spent fuel between Turkey Point Units 3 and 4.
This letter provides supplemental information,. and documents the results of recent discussions with members of your staff.
In order to preclude vertical movement of the cask during the transfer between Units 3 and 4, control power to the hoist will be de-energized whii.e the cask is in the alley between the units.
This requirement has been incorporated into our Turkey Point operating procedures.
Xn our June 23, 1976 letter, we estimated that it would be necessary to transfer some fuel assemblies after about 90 days of decay.
Due to the delays in initiating the transfer operation, all of the fuel assemblies will have decayed at least 120 days prior to being transferred.
Our calculations show that 120 days of decay ensures that all assemblies have a decay heat of less than 10.6 KW.
The Turkey Point. Unit No.
'4 (cycle 2) calculated maximum assembly decay heat load is
.'.95 KW after 120 days decay.
The calculation is based on the ANS decay heat curves (Draft of Proposed Standard Decay Energy Rel'ease Rates'ollowing Shutdown of Uranium Fueled Thermal Reactors, October 1971) with the adjustment applied for a finite operating time.
The-calculation also includes a
calculated factor of 1.05 to account for the relative power distribution among assemblies while they were in the reactor.
An 18% margin exists between the calculated decay heat load and 10.6 KW which is the design thermal rating for t;he spent fuel cask.
The calculation contains some added conservatism in that the cycle 1 effect does not consider that the reactor was shut down for slightly more than two months for the re-fueling between cycle 1 and cycle 2.
The above notwithstanding 6MC HELPING 8UILD FLORIDA
0 a,
'1
To:
Victor Stello, Jr.
Re:
Turkey Point Plant Unit Nos.
3 6
4 Docket Nos.
50-250 and 50-251 Su lemental Information July 8, 1976 Page the heatup rate of the cask with one. of the 40 least decayed spent fuel assemblies will still be determined prior to trans-ferring any of these assemblies as indicated in our June 23, 1976, letter.
In addition to reducing the decay heat of the fuel assemblies, the additional decay time (minimum of 2880 hours0.0333 days <br />0.8 hours <br />0.00476 weeks <br />0.0011 months <br />) will sig-nificantly reduce the radiological inventory of the spent fuel, thereby further reducing the already acceptable consequences of a'postulated fuel handling accident.
With the assumptions provided in Table 5 of our June 23, 1976, letter and deleting the pool DF of 100 and with 2000 hours0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br /> of decay, the potential offsite radiological consequences of a rupture of one fuel assembly outside of the spent fuel pool is 1.6 rem thyroid and 0.0003 rem whole body.
The cask is designed for dry trans-fer.
Thus, loss of water from the cask is not expected to result in unacceptable damage to the fuel element.
- However, even if a TID-14844 release were assumed, the resulting site boundary dose would be less than the 17 rem thyroid and the 2 rem whole body found acceptable by the Staff in its Safety Evaluation Report.
Since the spent fuel will have a minimum of 2880 hours0.0333 days <br />0.8 hours <br />0.00476 weeks <br />0.0011 months <br /> decay orior to transfer, the potential site boundary dose associated with mishaps in transfer., is signifi-cantly less: than the values found acceptable by the Staff.
An uncontrolled descent of the cask of approximately 41 feet can be postulated.
The probability of such an event is small since the cask is at the height of 41 feet only briefly after crossing the lip of the fuel pool prior to being lowered to the transfer height of less than 12 inches above grade.
Assuming
.-that such an event did occur, we expect that the cask would re-
, main structurally intact, i.e., unacceptable damage is not anticipated.
We also expect the cask shielding to remain essentially intact.
The cask is designed to meet the rigorous requirements of 10 CFR 71, including an uncontrolled descent of 30 feet onto an unyielding surface.
In our judgment, the actual conditions surrounding our intended use of the cask, including the postulated uncontrolled descent of 41 feet, are not significantly more severe than the requirements of 10 CFR 71.
Even if:the loss of cask integrity did occur, the radiological consequences associated with this postulated event are less than previously found acceptable by the Staff,
h h
~
ll To:
Re:'ictor Stello, Jr.
Turkey Point, Plant Unit Nos.
3 and 4
Docket Nos.
50-250 and 50-251 Su lemental Information July 8, 1976 Page and, therefore, further analysis of this event is not re-quired.
Very truly yours, Robert E. Uhrig Vice President REU/GDW/hlc cc:
Norman C. Moseley, Region II Jack R.
- Newman, Esq.
0