Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000272/2014007 +
- IR 05000285/2014003 +
- IR 05000456/2014007 +
- ML14239A676 +
- ML14216A362 +
- ML14211A403 +
- TAC:MF3835 +
- ML14252A142 +
- ML14252A171 +
- ML14252A170 +
- ML14252A143 +
- ML14253A185 +
- ML14239A679 +
- CAC:MF4699 +
- LR-N14-0197, Denial of NCV 05000354/2014003-01, Inadequate Procedural Guidance for Responding to an Internal Flooding Event in the HPCI and RCIC Rooms +
- ML14246A190 +
- TAC:MF4707 +
- ML15041A752 +
- TAC:MF4752 +
- ML14251A231 +
- ML14209A005 +
- ML14254A401 +
- ML14330A550 +
- ML14290A199 +
- ML14289A527 +
- ML14255A017 +
- CP-201401027, 10CFR50.59 Evaluation Summary Report 018, 10CFR72.48 Evaluation Summary Report 003 and Commitment Material Change Evaluation Report 012 +
- L-2014-270, Response to Request for Additional Information Re License Amendment Request for Transition to 10CFR50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for LWR Generating Plants +
- CP-201401035, Relief Requests Nos. B-7, B-12 and B-13 for the Second 10-Year ISI Interval (Second ISI Interval Start Date: August 3, 2004; Second ISI Interval End Date: August 2, 2014) +
- MNS-14-066, Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) +
- MNS-14-067, Third Six-Month Status Reports in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) +
- L-2014-274, Third Overall Integrated Plan Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order EA-12-049) +
- L-2014-243, Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events +
- ML14252A309 +
- NL-14-110, Third Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events +
- NL-14-109, Third Six-Month Status Report for the Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for to Reliable Spent Fuel Pool Instrumentation +
- NOC-AE-14003162, Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order EA-12-049) +
- NOC-AE-14003164, Third Six-Month Status Update of Overall Integrated Plan in Response to Order EA-12-051, Reliable Spent Fuel Pool Instrumentation +
- RNP-RA/14-0092, Relief Request (RR)-11 for Relief from Volumetric/Surface Examination Frequency Requirements of ASME Code Case N-729-1 +
- ML14239A521 +
- ML14239A283 +
- ML14188C453 +
- L-14-290, Discharge Monitoring Report (NPDES) Permit No. PA0025615 +
- RC-14-0112, License Amendment Request - LAR-12-04269 License Basis Changes in Steam Generator Tube Rupture Analysis +
- ML14245A053 +
- ONS-2014-117, Third Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051) +
- ONS-2014-118, Third Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-04) +
- 1CAN081403, License Amendment Request Update the Reactor Coolant System Pressure and Temperature and the Low Temperature Overpressure Protection System Limits +
- ML14241A238 +
- AEP-NRC-2014-67, Third Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) +