IR 050002752014404 and 050003232014404, Diablo Canyon Power Plant, Units 1 and 2, NRC Inspection Report
ML14239A676
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 08/27/2014
From: Mark Haire
Plant Support Branch-1
To: Halpin E
Pacific Gas & Electric Co
References
IR-2014-404
Download: ML14239A676 (4)


See also: IR 05000275/2014404

Text

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E LAMAR BLVD

ARLINGTON, TX 76011-4511

August 27, 2014

Mr. Edward D. Halpin, Senior Vice President

and Chief Nuclear Officer

Pacific Gas and Electric Company

Diablo Canyon Power Plant

P.O. Box 56, Mail Code 104/6

Avila Beach, CA 93424

SUBJECT: DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC

INSPECTION REPORT 05000275/2014404 AND 05000323/2014404

Dear Mr. Halpin:

On June 5, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed a security

inspection at the Diablo Canyon Power Plant, Units 1 and 2. On July 17, 2014, the NRC

inspectors discussed the results of this inspection with Mr. J. Welsch, Station Director,

and other members of your staff. Inspectors documented the results of this inspection in

the enclosed inspection report.

NRC inspectors documented four findings of very low safety significance (Green) in this report.

Four of these findings involved violations of NRC requirements.

If you contest the violations or significance of the NCVs, you should provide a response within

30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear

Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001;

with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement,

U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident

Inspector at the Diablo Canyon Power Plant, Units 1 and 2.

If you disagree with a cross-cutting aspect assignment in this report, you should provide a

response within 30 days of the date of this inspection report, with a basis for your disagreement,

to the Regional Administrator, Region IV; and the NRC Resident Inspector at the Diablo Canyon

Power Plant, Units 1 and 2.

"Enclosure transmitted herewith contains SUNSI. When separated from enclosure, this

transmittal document is decontrolled."

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

E. Halpin -2-

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be

available electronically for public inspection in the NRC Public Document Room or from the

Publicly Available Records (PARS) component of NRC's Agencywide Document Access and

Management System (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, the material enclosed herewith contains Security-Related Information in accordance

with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security

vulnerability. Therefore, the material in the enclosure will not be made available electronically

for public inspection in the NRC Public Document Room or from the PARS component of NRC's

ADAMS. If you choose to provide a response and Security-Related Information is necessary to

provide an acceptable response, please mark your entire response "Security-Related

Information - Withhold from Public Disclosure under 10 CFR 2.390" in accordance

with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In

accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your

response.

Sincerely,

/RA/ David A. Holman for

Mark S. Haire

Branch Chief, Plant Support Branch 1

Division of Reactor Safety

Docket Nos.: 50-275; 50-323

License Nos.: DPR-80; DPR-82

Nonpublic Enclosure:

NRC Inspection Report 05000275/2014404

and 05000323/2014404 w/Attachment:

Supplemental Information

cc w/o enclosure:

Electronic Distribution for Diablo Canyon Power Plant,

Units 1 and 2

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

ML14239A676

Entire Report: Non-Sensitive Publicly Available Keyword:

SUNSI Review Complete Sensitive Non-Publicly Available MD 3.47 Non-Public A.3

By: DHolman

Cover Letter Only: Non-Sensitive Publicly Available Keyword:

SUNSI Review Complete Sensitive Non-Publicly Available SUNSI Review Complete

By: DHolman NRC-002

OFFICE PSI:PSB1 PSI:PSB1 PSI:PSB1 C:PSB1 C:PBA C:PSB1

NAME DHolman/dch JBuchanan MBrooks MHaire WWalker MHaire

SIGNATURE /RA/ /RA/ E-mail /RA/ E-mail /RA/ /RA/ /RA/

DATE 8/24/14 8/21/14 8/25/14 8/21/14 8/25/14 8/27/14

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

Letter and Inspection Report to Mr. Edward Halpin from Mr. Mark Haire, dated August 27, 2014

SUBJECT: DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC

INSPECTION REPORT 05000275/2014404 AND 05000323/2014404

Distribution w/enclosure:

Security Specialist/NSIR (Eric.Wharton@nrc.gov)

Security Specialist/NSIR (Niry.Simonian@nrc.gov)

Chief, Security Performance Evaluation Branch/NSIR (Clay.Johnson@nrc.gov)

Security Specialist/NSIR (Douglas.Garner@nrc.gov)

Branch Chief, RI DRS/PSB1 (Anthony.Dimitriadis@nrc.gov)

Branch Chief, RII DRS/PSB1 (Binoy.Desai@nrc.gov)

Branch Chief, RIII DRS/PSB (Richard.Skokowski@nrc.gov)

Senior Resident Inspector (Thomas.Hipschman@nrc.gov)

Administrative Assistant (Madeleine.Arel-Davis@nrc.gov)

Distribution w/o enclosure:

Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)

Acting DRP Director (Troy.Pruett@nrc.gov)

Acting DRP Deputy Director (Michael.Hay@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Resident Inspector (John.Reynoso@nrc.gov)

Branch Chief, DRP/A (Wayne.Walker@nrc.gov)

Senior Project Engineer, DRP/A (Ryan.Alexander@nrc.gov)

Acting Senior Project Engineer, DRP/A (Theresa.Buchanan@nrc.gov)

Project Engineer, DRP/A (Brian.Cummings@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Peter.Bamford@nrc.gov)

Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV/ETA: OEDO (Anthony.Bowers@nrc.gov)

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION