OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
"Enclosure transmitted herewith contains SUNSI. When separated from enclosure, this
transmittal document is decontrolled."
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
August 27, 2014
Mr. Edward D. Halpin, Senior Vice President
and Chief Nuclear Officer
Pacific Gas and Electric Company
Diablo Canyon Power Plant
P.O. Box 56, Mail Code 104/6
Avila Beach, CA 93424
SUBJECT:
DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC
INSPECTION REPORT 05000275/2014404 AND 05000323/2014404
Dear Mr. Halpin:
On June 5, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed a security
inspection at the Diablo Canyon Power Plant, Units 1 and 2. On July 17, 2014, the NRC
inspectors discussed the results of this inspection with Mr. J. Welsch, Station Director,
and other members of your staff. Inspectors documented the results of this inspection in
the enclosed inspection report.
NRC inspectors documented four findings of very low safety significance (Green) in this report.
Four of these findings involved violations of NRC requirements.
If you contest the violations or significance of the NCVs, you should provide a response within
30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear
Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001;
with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement,
U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident
Inspector at the Diablo Canyon Power Plant, Units 1 and 2.
If you disagree with a cross-cutting aspect assignment in this report, you should provide a
response within 30 days of the date of this inspection report, with a basis for your disagreement,
to the Regional Administrator, Region IV; and the NRC Resident Inspector at the Diablo Canyon
Power Plant, Units 1 and 2.
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
1600 E LAMAR BLVD
ARLINGTON, TX 76011-4511
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
E. Halpin
- 2 -
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
available electronically for public inspection in the NRC Public Document Room or from the
Publicly Available Records (PARS) component of NRC's Agencywide Document Access and
Management System (ADAMS). ADAMS is accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
However, the material enclosed herewith contains Security-Related Information in accordance
with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security
vulnerability. Therefore, the material in the enclosure will not be made available electronically
for public inspection in the NRC Public Document Room or from the PARS component of NRC's
ADAMS. If you choose to provide a response and Security-Related Information is necessary to
provide an acceptable response, please mark your entire response "Security-Related
Information - Withhold from Public Disclosure under 10 CFR 2.390" in accordance
with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In
accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your
response.
Sincerely,
/RA/ David A. Holman for
Mark S. Haire
Branch Chief, Plant Support Branch 1
Division of Reactor Safety
Docket Nos.: 50-275; 50-323
Nonpublic Enclosure:
NRC Inspection Report 05000275/2014404
and 05000323/2014404 w/Attachment:
Supplemental Information
cc w/o enclosure:
Electronic Distribution for Diablo Canyon Power Plant,
Units 1 and 2
Entire Report:
Non-Sensitive
Sensitive
Publicly Available
Non-Publicly Available
Keyword:
MD 3.47 Non-Public A.3
SUNSI Review Complete
By: DHolman
Cover Letter Only:
Non-Sensitive
Sensitive
Publicly Available
Non-Publicly Available
Keyword:
SUNSI Review Complete
SUNSI Review Complete
By: DHolman
OFFICE
PSI:PSB1
PSI:PSB1
PSI:PSB1
C:PSB1
C:PBA
C:PSB1
NAME
DHolman/dch
JBuchanan
MBrooks
MHaire
WWalker
MHaire
SIGNATURE
/RA/
/RA/ E-mail
/RA/ E-mail
/RA/
/RA/
/RA/
DATE
8/24/14
8/21/14
8/25/14
8/21/14
8/25/14
8/27/14
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
Letter and Inspection Report to Mr. Edward Halpin from Mr. Mark Haire, dated August 27, 2014
SUBJECT:
DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC
INSPECTION REPORT 05000275/2014404 AND 05000323/2014404
Distribution w/enclosure:
Security Specialist/NSIR (Eric.Wharton@nrc.gov)
Security Specialist/NSIR (Niry.Simonian@nrc.gov)
Chief, Security Performance Evaluation Branch/NSIR (Clay.Johnson@nrc.gov)
Security Specialist/NSIR (Douglas.Garner@nrc.gov)
Branch Chief, RI DRS/PSB1 (Anthony.Dimitriadis@nrc.gov)
Branch Chief, RII DRS/PSB1 (Binoy.Desai@nrc.gov)
Branch Chief, RIII DRS/PSB (Richard.Skokowski@nrc.gov)
Senior Resident Inspector (Thomas.Hipschman@nrc.gov)
Administrative Assistant (Madeleine.Arel-Davis@nrc.gov)
Distribution w/o enclosure:
Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
Acting DRP Director (Troy.Pruett@nrc.gov)
Acting DRP Deputy Director (Michael.Hay@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Resident Inspector (John.Reynoso@nrc.gov)
Branch Chief, DRP/A (Wayne.Walker@nrc.gov)
Senior Project Engineer, DRP/A (Ryan.Alexander@nrc.gov)
Acting Senior Project Engineer, DRP/A (Theresa.Buchanan@nrc.gov)
Project Engineer, DRP/A (Brian.Cummings@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Peter.Bamford@nrc.gov)
Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV/ETA: OEDO (Anthony.Bowers@nrc.gov)