Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20262F313 + (February 25, 1994)
- ML20199H839 + (February 25, 1994)
- 05000361/LER-1994-012, :on 940126,inadequacies in Electrical Distribution Sys Design Calculations.Caused by Incorrect Engineering Judgement.C/A:Upgraded MCC Control Circuit for 2HV9303 by Replacing Transformer + (February 25, 1994)
- 05000313/LER-1994-001-03, :on 940201,inoperable Emergency Feedwater Sys Flowpath Occurred.Caused by Operators Inattention to Detail While Taking & Reviewing Logs.Operations Shift Mgt & Crew Meeting to Discuss Lessons Learned from Event + (February 25, 1994)
- 05000395/LER-1994-002-01, :on 940128,pressure & Flow Data for Charging/ Safety Injection Pumps Identified Condition Outside of Design Basis.Caused by Personnel Error.Controls Established & Test Procedures Revised + (February 25, 1994)
- ML20029D456 + (February 25, 1994)
- ML20067D309 + (February 25, 1994)
- ML20149J515 + (February 25, 1994)
- ML20064G590 + (February 25, 1994)
- 05000272/LER-1994-003, :on 940127,reactor Trip Occurred on SG 14 Low Low Level.Caused by Equipment Failure of Circuit Cards in 14BF19/40 Controller.Circuit Cards Replaced & Controller Returned to Svc + (February 25, 1994)
- ML18037A781 + (February 25, 1994)
- ML17352A473 + (February 25, 1994)
- ML17310B094 + (February 25, 1994)
- GO2-94-049, Provides Update & Addl Detail Re Plans to Perform Stress Improvement of Nozzle to safe-end Welds During Refueling Outage R-9 in Spring of 1994,as Described in 921016 Response to GL 88-01 & 930326 Submittal Re IGSCC Insps + (February 25, 1994)
- IR 05000397/1994008 + (February 25, 1994)
- ML17310B081 + (February 25, 1994)
- ML17310B076 + (February 25, 1994)
- ML18011A384 + (February 25, 1994)
- ML17331B272 + (February 25, 1994)
- ML15117A207 + (February 25, 1994)
- ML20029C567 + (February 25, 1994)
- ML17331B271 + (February 25, 1994)
- ML20067D328 + (February 25, 1994)
- ML16154A570 + (February 25, 1994)
- TAC:M85971 + (February 25, 1994)
- ML17291B334 + (February 25, 1994)
- ML17331B288 + (February 26, 1994)
- ML17331B287 + (February 26, 1994)
- ML17228A463 + (January 14, 1994)
- ML20095B210 + (February 27, 1994)
- ML20149J002 + (February 27, 1994)
- L-94-044, Forwards Rev 4 to Second Ten-Yr ISI Interval IST Program, Utilizing Testing Approach of Asme/Ansi OM-1987,Part 10 + (February 27, 1994)
- ML17228A478 + (February 28, 1994)
- ML17228A469 + (February 28, 1994)
- ML17228A468 + (February 28, 1994)
- ML17263A550 + (February 28, 1994)
- ML17263A549 + (February 28, 1994)
- ML17263A545 + (February 28, 1994)
- ML17331B307 + (February 28, 1994)
- ML17331B305 + (February 28, 1994)
- ML17331B285 + (February 28, 1994)
- ML17331B242 + (February 28, 1994)
- ML17331B239 + (February 7, 1994)
- ML17290A993 + (December 31, 1993)
- Press Release-94-038, NRC Advisory Committee on Reactor Safeguards to Meet in Bethesda, MD, March 10-12 + (February 28, 1994)
- Press Release-94-037, NRC to Clarify Requirements Governing License Renewal for Nuclear Power Plants + (February 28, 1994)
- ML17352A474 + (February 28, 1994)
- ML17310B247 + (February 28, 1994)
- ML17310B245 + (February 28, 1994)
- ML17310B100 + (February 28, 1994)
- ML18100A988 + (February 28, 1994)
- ML18100A945 + (February 28, 1994)