ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM s.-
REGULATORY INFORMATXON DISTRIBUTXON SYSTEM (RXDS)
ACCESSION NBR:9403180133 DOC.DATE:
NOTARIZED: NO DOCKET g FACXL:50-315 Donald C.
Cook Nuclear Power Plant, Unit 1, Indiana M
05000315 AUTH.NAME AUTHOR AFFILXATXON JANISSE,J.D.
(formerly Indiana
& Michigan Ele BLXND,A.A.
(formerly Indiana
& Michigan Ele RECXP.NAME RECXPIENT AFFXLIATXON
SUBJECT:
Monthl operating rept for Feb 1994 for DCP Unit l.
W 940307 ltr.
DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR
(
ENCL g SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES D
RECIPIENT ID CODE/NAME PD3-1 PD INTERNAL: AEOD/DOA D6RSy'OEAB REG 01 EXTERNAL EG&G BRYCE g J ~ H NSIC COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME HICKMAN,J AEOD/DSP/TPAB NRR/DRIL/RPEB RGN3 NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 D
D D
NOTE TO ALL"RIDS" RECIPIENTS:
D D
PLEASE HELP US TO REDUCE WARM CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 11 ENCL 11
0'I
Indiana Michigan~
Power Company ~
Cook Nuclear Plant One Cook Place Bridgman, MI 49106 616 465 5901 IHWANdh SNCHSGQM PWM March 7, 1994 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C.
20555 Gentlemen:
Pursuant to the requirements of Donald C.
Cook Nuclear Plant Unit 1 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of February 1994 is submitted.
Respectfully, A.A. Blind Plant Manager Attachment c'RC Region III D.R. Hahn R.C. Callen S.
Hamming J.G. Keppler INPO Records Center ANI Nuclear Engineering Department E.E. Fitzpatrick R.L.
Simms W.G. Smith, Jr.
S.J.
Brewer D.W. Paul S.H. Steinhart J.L. Leichner J.A. Isom D.G. Turner E.A. Smarrella J.C. Krieger D.F. Krause M.E. Russo
- -F40,,,
G<K 0~000815
~~801gg qg0228
~ R.
/pe
0 j
a 1
N.R.C.
OPERATING DATA REPORT DOCKET NO.
50-315 DATE 02/Mar/94 COMPLETED BY JD Janisse TELEPHONE 616-465-5901 OPERATING STATUS
- 1. Unit Name D.
C.
Cook Unit 1
- 2. Reporting Period FEB 94
- 3. Licensed Thermal Power (MWt) 3250 4.
Name Plate Rating (Gross MWe) 1152 5.
Design Electrical Rating (Net MWe) 1020 6.
Maximum Dependable Capacity (GROSS MWe) 1056 7.
Maximum Dependable Capacity (Net MWe) 1000 notes
- 8. If Changes Occur in Capacity Ratings (Items no.
3 through
- 7) Since Last Report Give Reasons 9.
Power Level To Which Restricted. If Any (Net MWe) 10.
Reasons For Restrictions. If Any:
ll. Hours in Reporting Period 12.
No. of Hrs. Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator on Line
- 15. Unit Reserve Shutdown Hours
- 16. Gross Therm.
Energy Gen.
(MWH) 17.
Gross Elect.
Energy Gen.
(MWH)
- 18. Net Elect.
Energy Gen.
(MWH)
- 19. Unit Service Factor
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (MDC Net)
- 22. Unit Capacity Factor (DER Net)
- 23. Unit Forced Outage Rate 24.
Shutdowns Scheduled over Next Six None This Mo.
Yr.
672. 0 269. 1 0 '
269.0 0.0 515939 160930 151919 40.0 40.0 22.6 22.2 0.0 Months (Type, to Date 1416 '
1013.1 0.0 1013.0 0.0 2226409 700060 666378 71.5
- 71. 5
- 47. 1
- 46. 1 0.0 Date,and Cumm.
167976.0 126667.5 463 '
124621 '
321.0 365752184 118722720 114188176 75.1 75.1
- 67. 7 65.9
6.0 Duration)
- 25. If Shut Down At End of Report Period, Estimated Date of Startup:
A ril 18 1994
- 26. Units in Test Status (Prior to Commercial Operation):
Forcast INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Achieved
I
AVERAGE DAILY POWER LEVEL (MWe-Net)
DOCKET NO.
UNIT 02/Mar/94 JD Janisse TELEPHONE 50-315 ONE 02/Mar/94 JD Janisse 616-465-5901 DAY 02/01/94 02/01/94 02/03/94 02/04/94 02/05/94 02/06/94 02/07/94 02/08/94 02/09/94 02/10/94 02/11/94 02/12/94 02/13/9 4 02/14/94 02/15/94 02/16/94 FEB 94 AVERAGE DAILY POWER LEVEL 635 625 615 608 592 537 532 532 532 532 531 59 0
0 0
0 FEB 94 DAY 02/17/94 02/18/94 02/19/94 02/20/94 02/21/94 02/22/94 02/23/94 02/24/94 02/25/94 02/26/94 02/27/94 02/28/94 AVERAGE DAILY POWER LEVEL
DOCKE O.:
UNIT NAME:
COMPLETED BY:
TELEPHONE:
DATE:
PAGE:
50-315 D.C.
Cook Unit 1 R.
D. Reynnells (616) 465-5901 March 7, 1994 Page 1 of 1
MONTHLY OPERATING ACTIVITIES FEBRUARY 1994 HIGHLIGHTS The unit entered the reporting period in Mode 1 at 664 RTP.
The unit exited this reporting period in Mode 6 at 0% RTP.
The unit was removed from service February 12, 1994, followed by the reactor coolant system being cooled down to Mode 5 for 'the unit maintenance/refueling outage.
The unit ended the reporting period in Mode 6 with the fuel off loaded.
There were no challenges to the pressurizer safety valves or power operated relief valves.
1 Gross Electrical generation for the month of February was, 160930 MWH.
DETAILS 02-12-94 0000 Commenced unit shutdown for maintenance/refueling outage.
0457 Tripped the Main Turbine-Generator.
02-13-94 02-18-94 02-23-94 02-26-94 0505 0517 1050 1754 2200 1212 1651 0458 Entered Mode 2.
The RCS is in Mode 3.
Commenced RCS cooldown.
The RCS is in Mode 4.
The RCS is in Mode 5.
The RCS is in Mode 6.
E Commenced fuel off load from the core to the spent fuel pool.
Fuel off load is complete, all fuel assemblies are stored in the spent fuel pool.
J
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: FEBRUARY 1994 UNIT NAME:
DATE!
COMPLETED BY:
TELEPHONE:
Page 1 of 1 D
C.
COOK UNIT 1:
March 7, 1994 R. D. Reynnells (616) 465-5901 DURATION NO DATE TYPES'OURS METHOD OF SHUTTING DOWN REASON~
REACTORs LICENSEE EVENT REPORT NO.
SYSTEM CODE4 COMPONENT CAUSE AND CORRECTIVE ACTION CODEs TO PREVENT RECURRENCE 308 940212 S
403.0 N/A N/A N/A The end of core power coastdown~
was terminated on 940212 at 000~
hours when the power reduction was started to remove the unit from service for the maintenance/refueling outage.
1 F
S Forced Scheduled 2
Reason:
A:
Ecpxipment Failure (Explain)
B:
Maintenance or Test C:
Refueling D:
Regulatory Restriction E:
Operator Training and License Examination F:
Administrative G!
Operational Error (Explain)
H:
Other (Explain) 3 Method:
1:
Manual 2:
Manual Scram 3:
Other (Explain) 4Exhibit G Instructions for preparation of data entry sheets for Licensee Event Report (LER).File (NUREG 1061) 5Exhibit I:
Same Source
P 4