Monthly Operating Rept for Feb 1994 for Re Ginna Nuclear Power Plant.W/940310 Ltr
ML17263A550
Person / Time
Site: Ginna Constellation icon.png
Issue date: 02/28/1994
From: Ploof R, Widay J
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9403150169
Download: ML17263A550 (8)


Text

t ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM

/

t REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9403150169 DOC.DATE: 94/02/28 NOTARIZED: NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH. NAME AUTHOR AFFILIATION PLOOF,R. Rochester Gas 6 Electric Corp.

WIDAY,J.A. Rochester Gas 6 Electric Corp. R RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Feb 1994 for R.E.Ginna Nuclear Power Plant.W/940310 ltr. D DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72). 05000244

/

A RECIPIENT COPIES RECIPIENT COPIES D ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD1-3 PD 1 1 JOHNSON,A 1 1 D

INTERNAL: AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 NRRJ)ORS OEAB 1 1 NRR/DRIL/RPEB 1 1 EG 01 1 1 RGN1 1 1 EXTERNAL EGGG BRYCE i J ~ H 1 1 NRC PDR 1 1 NSIC 1 1 D

D D

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL 11

Itr' zuvz //w t&tOeft

'/////" // I roRK uzi T 5tATE

//I// /////////////

ROCHESTER GASANDELECTRICCORPORATION a 89EASTAVENUEr ROCHESTER~ N.Y. 14649<001 JOSEPH A. WIDAY TELEPHONE Pront Monogor AREA CODE 7t6 546-2700 Grrtno Nucr0or Prortt GINNA STATION March 10, 1994 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

Monthly Report for February, 1994 Operating Status Information R. E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of February, 1994.

Very truly yours, s h A. Wid ant Manager JAW:tjn Attachments c: Mr. Thomas T. Martin NRC (1)

'rtr0315016Ir .9trp22rr PDR R ~ '.~

'ADDCK-z'05000244

'DR, ',".,) lgg

S 4

v- j ))nor< )(

OPERATING DATA REPORT DOCKET NO. 50-244 DA March 10 994 COMPLETED BY Ronald Ploof TELEPHONE 315 524-4446 Ext. 673 lPERATING STATUS Unit Name: R.E. GINNA WCLEAR RRKR PLANT Notes: The unit operated at approximately 20 Reporting Period: Februar 1994 98% power level for the month of

3. Licensed Thermal Power (MWt): 1520 February except for approximately 4~ Nameplate Rating (Gross MWe): 490 a 5% reduction on February 17.

5~ Design Electrical Rating (Net We): 470

6. Maximrn Dependable Capacity (Gross MWe): 490
7. Maximan Dependable Capacity (Net MWe): 470
8. If Changes Occur in Capacity Ratings (Items Nwber 3 Through 7) Since Last Report, Give Reasons:
9. Power Level to Which Restricted, If Any (Het MWe):
10. Reasons For Restrictions, If Any:

This Month Yr.-to-Date Cmjiative

11. Hours In Report Period 1416 213 066.45
12. Nmher of Hours Reactor Was Critical 1416 169 942.46
13. Reactor Reserve Shutdown Hours 1 687.55 14 ~ Hours Generator On-Line 1416 167 168.38 15 ~ Unit Reserve Shutdown Hours 8.5
16. Gross Thermal Energy Generated (MWH) 998 757 2 086 791 237 042 804
17. Gross Electrical Energy Generated (MWH) 339 557 710 368 78 393 727
18. Het Electrical Energy Generated (MWH) 322 634 674 958 74 410 331
19. Unit Service Factor 100/ 100% 78.60/,
20. Unit Availability Factor 100% 100% 78.61%
21. Unit Capacity Factor (Using MDC Net) 102.15% 101.42% 75.59%
22. Unit Capacity Factor (Using DER Net) 102.15% 101.42%
23. Unit Forced Outage Rate 0% 0
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

Refuelin and Maintenance March 4 1994 - duration: 38 da s.

25 26.

'f Shut Down At End of Report Period, Estimated Date of Startup Units In Test Status (Prior to Cotmercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

  • CUMULATIVE TOTAL COMMENCING JANUARY 1, 1975
    • CUMULATIVE TOTAL COMMENCING NOVEMBER 8, 1969

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE: March 10 1994 COMPLETED BY:

Ronald Ploof TELEPHONE: 315 524-4446 EKt. 673 MONTH Februar 1994 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 479 17. 471

2. 480 18. 481
3. 480 19. 480
4. 480 20. 480
5. 480 21. 481
6. 481 22. 481
7. 480 23. 480
8. 481 480
9. 481 25. 479
10. 481 26. 480 480 27. 480
12. 481 28. 480
13. 481 29.
14. 480 30.
15. 480 31.
16. 480 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in reporting month. Compute to the nearest whole megawatt.

DO( KI.T NO SO 244 UNIT NAMI. R.E. (sINNA NUCLEAR PPWER PLANT UNIT SHUTDOWN AND POWER REDUCTIONS>>A1

(:OhlPLI:.1'I D I3Y I I'I'.LI:.PII()NI:. 315 524-4446 X673 h 4 cv 0 DI o- C 0 4 C c 0 l.icensee Em 4Ml C

Cause gI Corrective 4 0III 0 0 Action to

.Ho. Date 0 0 DC 4 Event ~

VI 4 0 0 0 E 0 4 Prevent Recurrence 0~ IL 4 EIl C Report ft i/l lJ 0

CI Ft Forced Reason: Method: Fxhibit G instructions S: Scheduled A-Equipment Failure (Explain) I-hlanua I for Preparation of Data I3-htaintenancc or Test 2-hlanual Scram. Entry Shccts for Liccnscc C-Refueling 3-Automatic Scram. Event Rcport (LER) File (NIJRFG-D-Regulatory Restriction 4-Other (Explain) Ol (II )

E-Operator Training 8c License Examination F-Administrative G-Operational Error (Explain) iitv. 4ISS 4$ 4$ H-Other (Explain) Fxhibit I - Same Source

~<

C A. ~ ~

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE: M rch 10 1994 COMPLETED BY:

Ronald P oof TELEPHONE: 315 524-4446 Ext. 673 MONTH Februar 1994 During the month of February the average power level was 98%

On February 17, power was reduced to as low as 90'. due to a momentary undervoltage condition caused by switch yard manipulations.