Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17332A953 +
- ML17332A952 +
- Press Release-95-122, NRC Issues Final Regulations on Procuring SAFETY-RELATED Items for Nuclear Power Plants +
- ML20098D027 +
- NRC-95-0103, Comment on Draft Reg Guide & NRC Bulletin, Potential Plugging of ECCS Strainers for Debris in Bwr. Supports Points That Bulletin Should Include Option of Justifying Operability of Currently Installed Passive Strainers +
- ML20098C955 +
- ML20098C904 +
- ML20098C518 +
- ML20098C513 +
- ML20098C499 +
- ML20098C207 +
- ML20098C147 +
- ML20098C141 +
- ML20098C074 +
- ML20098C066 +
- NRC-95-0105, Revises 950929 Request for Discretionary Enforcement W/ Respect to Requirements of TS Action Statement 3.8.1.1.d & TS 4.0.3,documenting That Addl auto-connected Loads Affected by Incomplete Surveillance Requirements +
- 05000352/LER-1995-007, Forwards LER 95-007,discussing Condition Prohibited by TS Due to Personnel Error +
- ML20098B469 +
- ML20098B467 +
- ML20094B313 +
- ML20093L653 +
- ML20093G558 +
- ML20093E736 +
- ML20093D442 +
- ML20093D425 +
- ML20093B207 +
- ML20093B193 +
- NRC-95-0104, Application for Amend to License NPF-43,incorporating one- Time Deferral of Limited Aspects of SR 4.3.3.2,4.8.1.1.2.e. 4.b & 4.8.1.1.2.e.6.b Into Plant TS +
- ML20093B083 +
- ML20093B045 +
- ML20093A818 +
- ML20092N008 +
- ML20134K135 +
- ML20134K549 +
- ML20134B972 +
- ML20266B048 +
- LIC-95-0191, Forwards Rev 0 of Analysis EA-FC-95-027, DG Offnormal Loading Due to Full Speed Start ETP-6.5-DGT Re Operability of DG One (DG-1).Analysis Concluded That DG-1 Operable Under Conditions Discovered on 950824 +
- ST-HL-AE-5190, Forwards Addl Info Re NRC GL 95-03, Circumferential Cracking of SG Tubes +
- BSEP-95-0511, Responds to NRC Re Violation & Deviation Noted in Insp Repts 50-324/95-15 & 50-325/95-15 on 950619-23 & 0701- 0804.Corrective Actions:Involved Individual Counseled & Periodic Tp OPT-34.2.2.1,swinging Fire Door Revised +
- TAC:M92321 +
- 0CAN109502, Forwards Rev 18 to ANO QA Manual Operations +
- BECO-LTR-95-104, Informs of Organizational Changes.Contact Name Changes from a Shiever to J Keene +
- PY-CEI-NRR-1986, Forwards LERs 95-005,95-006 & 95-007 Re Inverter Failure Results in Reactor Scram,Esf Actuation During Inverter Restoration & Improper Feedwater Pump Transfer Results in Reactor Scram +
- 05000338/LER-1995-004-02, :on 950907,missed Surveillance of N-16 Monitors Occurred.Caused by Result of Being Unaware N-16s Inoperable. Selector Switch Operated to Both Ni Selector Positions & Proper Power Levels Obtained/Restored +
- 05000352/LER-1995-007-01, :on 950902,TS Condition in Unit 1 a & B & Unit 2 B H Recombiners Inoperable Due to Inadequate post-mod Test Caused by Personnel Error.Conducted All Hands Meeting & Maint Training Analysis +
- 05000440/LER-1995-006, :on 950901,ESF Actuation During Inverter Restoration Occurred.Caused by Personnel Error.Engineers Involved in Technical Review of Work Order Coached & Counseled by Mgt/Supervision +
- 05000446/LER-1995-002-01, :on 950902,invalid TS Surveillance Occurred Due to Reading Incorrect Instrument.Performed Surveillance +
- 05000440/LER-1995-007, :on 950902,reactor Automatically Scramed.Caused by Operator Error.Operators Involved in Event Removed from Licensed Duties & Counseled W/Respect to Improper Actions +
- 05000366/LER-1995-003-03, :on 950902,reduction in Main Condenser Vacuum Prompted Manual Reactor Shutdown.Vented Waterbox,Returned Cooling Tower to Svc & Briefed Operations Shift Personnel on Event +
- 05000440/LER-1995-005, :on 950831,reactor Automatically Scramed.Caused by Equipment Failure.Inverter Unit Replaced & Instrument Power Supply Restored +