Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000255/LER-2013-003, Regarding Both Control Room Ventilation Filtration Trains Declared Inoperable + (October 11, 2013)
- ML13294A028 + (October 14, 2013)
- ML13323A552 + (October 14, 2013)
- TAC:MF2903 + (October 14, 2013)
- NLS2013091, Response to Request for Additional Information Regarding Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation (Order EA-12-051) + (October 14, 2013)
- RC-13-0142, License Amendment Request to Adopt NFPA 805, Response to Request for Additional Information + (October 14, 2013)
- PNP 2013-072, Report of Changes, Tests and Experiments and Summary of Commitment Changes + (October 14, 2013)
- GNRO-2013/00074, Response to Electronic Request for Additional Information Regarding 18 to 24 Month License Amendment Request, Dated September 16, 2013 + (October 14, 2013)
- RA-13-099, Request for Exemption from the Biennial Emergency Preparedness Exercise Requirements in 10 CFR 50, Appendix E, Sections IV.F.2.b and IV.F.2.c + (October 14, 2013)
- NRC 2013-0097, Response to Request for Additional Information Fall 2012 Unit 2 (U2R32) Steam Generator Tube Inspection Report + (October 14, 2013)
- NRC 2013-0101, 10 CFR 71.95 Report on the 8-120B Cask + (October 14, 2013)
- 05000275/LER-2013-006, Regarding Emergency Diesel Generators Valid Start Signal Due to Loss of Startup Power + (October 14, 2013)
- 05000373/LER-2013-006, Regarding Inadvertent Automatic Start of the 1A Diesel Generator Cooling Water Pump Due to Improper Adjustment of Mechanically Operated Contact Switch + (October 14, 2013)
- LR-N13-0198, Stations - Report for Packaging and Transporting a Shipping Cask Model 8-1208) Without Meeting a Required Condition in Certificate of Compliance 71-9168 + (October 14, 2013)
- ML13288A150 + (October 14, 2013)
- TAC:MF2900 + (October 15, 2013)
- ML13294A091 + (October 15, 2013)
- TAC:MF2902 + (October 15, 2013)
- ML13289A300 + (October 15, 2013)
- CP-201301238, Sixteenth Refueling Outage (1RF16) Steam Generator 180 Day Report + (October 15, 2013)
- ML13304A510 + (October 15, 2013)
- ML13301A082 + (October 15, 2013)
- ML13301A081 + (October 15, 2013)
- ML13290A092 + (October 15, 2013)
- LIC-13-0148, Response to Request for Additional Information (RAI) for Fort Calhoun Station (FCS) Exigent License Amendment Request (LAR) to Revise Current Licensing Basis of Pipe Break Criteria for High Energy Piping Outside of Containment + (October 15, 2013)
- CNL-13-108, Requests for Alternatives 13-ISI-1 and 13-ISI-2 to Extend the Reactor Vessel Weld Inservice Inspection Interval + (October 15, 2013)
- ML13290A071 + (October 15, 2013)
- NRC 2013-0098, NextEra Energy Point Beach, LLC Response Regarding Implementation of Multi-Unit Dose Assessment Capability + (October 15, 2013)
- ML13281A536 + (October 15, 2013)
- ML13281A530 + (October 15, 2013)
- CNL-13-101, 10 CFR 71.95 Report of Non-Compliance with Certificate of Compliance 9168 - Cask 8-120B + (October 15, 2013)
- ML18010A277 + (October 15, 2013)
- ML14344B003 + (October 16, 2013)
- ML14344B001 + (October 16, 2013)
- ML14344B002 + (October 16, 2013)
- ML13294A400 + (October 16, 2013)
- ML13294A021 + (October 16, 2013)
- TAC:MF2944 + (October 16, 2013)
- L-2013-277, Updated Final Safety Analysis Report - Unit 4 Cycle 26 Update and License Renewal 10 CFR 54.37(b) Report + (October 16, 2013)
- L-2013-302, Response Regarding Implementation of Multi-Unit Dose Assessment Capability + (October 16, 2013)
- L-2013-279, License Amendment Request - Supplemental Information Standardization of Administration Controls - Responsibility and Organization + (October 16, 2013)
- L-13-332, Radioactive Effluent Release Report Corrections + (October 16, 2013)
- ML13294A023 + (October 16, 2013)
- NRC-14-0073, Response to LRA Environmental RAIs - Final Threatened and Endangered Species Survey and Assessment Report Part 3 of 3 + (October 16, 2013)
- NRC-14-0073, Response to LRA Environmental RAIs - Final Threatened and Endangered Species Survey and Assessment Report - Part 2 of 3 + (October 16, 2013)
- NRC-14-0073, Response to LRA Environmental RAIs - Final Threatened and Endangered Species Survey and Assessment Report - Part 1 of 3 + (October 16, 2013)
- ML20206L025 + (October 16, 2013)
- RNP-RA/13-0106, Reply to Notice of Violation; EA-13-129, Inspection Report 05000261/2013009 + (October 17, 2013)
- ML13270A414 + (October 17, 2013)
- RIS 2013-17, Resuming Normal Interactions Between the NRC and NRC Stakeholders Following an Agency Shutdown + (October 17, 2013)
- ML13295A408 + (October 17, 2013)
- ML13295A416 + (October 17, 2013)
- ML13290A466 + (October 17, 2013)
- TAC:MF2921 + (October 17, 2013)
- ML13302B680 + (October 17, 2013)
- TAC:MF3094 + (October 17, 2013)
- ML14087A099 + (October 17, 2013)
- U-604144, COLR Clinton, Unit 1, Rev. 8, Core Operating Limits Report for Clinton Power Station Unit 1 Cycle 15 + (October 17, 2013)
- ML13303B907 + (October 17, 2013)
- L-2013-307, Cycle 25 Core Operating Limits Report + (October 17, 2013)
- ML13297A261 + (October 17, 2013)
- ML13296A506 + (October 17, 2013)
- ML13296A505 + (October 17, 2013)
- ML13296A501 + (October 17, 2013)
- ML13296A500 + (October 17, 2013)