Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17311A950 +
- ML17311A951 +
- ML18101A785 +
- ML20086A861 +
- ML20085N758 +
- ML20085M017 +
- ML20085J312 +
- ML20085H493 +
- ML20085G593 +
- ML20085G532 +
- ML20085G530 +
- ML20085G516 +
- ML20085G364 +
- ML20085G242 +
- ML20085G002 +
- ML20085F897 +
- ML20085F864 +
- ML20085E654 +
- ML20085E513 +
- ML20084U738 +
- ML20094E008 +
- ML20092K987 +
- ML20141J251 +
- ML20141J214 +
- ML20266F824 +
- ML20266F821 +
- ML20266F816 +
- ML20266F811 +
- ML20266F808 +
- PNO-V-95-025B, on 950203,misadminstration Involving Manual Brachytherapy Treatement Using iradium-192 Occurred. State of Washington Will Be Informed +
- RC-95-0157, Advises That SA Byrne Now General Manager,Nuclear Plant Operations,Effective 950605.NRC Distribution Re Orignial Documents Should Be Updated Accordingly +
- B15260, Notifies of Administrative Error Contained in Plant Unit 3 TS 3.6.1.3, Containment Air Locks, & Requests That Correction Be Made +
- B15274, Forwards ERDS Data Point Ref File for Change to ERDS Data Point for Total Reactor Flow,Reflecting Bounding Expected Max Instrument Range & Providing Detailed Description of Calculated Parameter +
- NRC-95-4487, Forwards Rev 0 to AP600 Emergency Response Guidelines +
- ML24005A319 +
- ML23248A202 +
- ML20265A557 +
- ML20087G002 +
- ML20087G010 +
- 05000219/LER-1995-002, :on 941106,core Alteration Was Unsupervised Due to Personnel Error in Decision Making.Reviewed & Revised error-free Refueling Plan & Related Refueling Procedures +
- 05000313/LER-1995-008, :on 950514,cooling Fan Associated W/Green Train of RB Emergency Cooling Sys Tripped Due to Failure of Drive End Thrust Bearing of Fan Motor.New Motor Ordered for Subj Fan & Will Be Installed Upon Receipt +
- 05000413/LER-1995-002-05, :on 950517,discovered That TS Surveillance Interval Had Been Exceeded.Caused by Unclear Mgt Directions/ Policy Guidance.Work Order Issued & Channel Calibration Performed +
- 05000423/LER-1995-011-01, :on 950515,mussel Shells Found in Recirculation Spray Sys Heat Exchanger.Caused by High Density of Mussel Plantigrades in Spring 1994.Hypochlorite Metering Pumps Installed +
- 05000461/LER-1995-005, :on 950515,RRPs Tripped from Fast to Slow Speed Due to Fault in Reactor Recirculation Control Panel +/- 15 Volt Dc Field Bus Bars.Nest Assembly Which Contained Faulty Field Bus Bars Replaced W/Spare Nest Assembly +
- NRC-95-4469, Forwards Proprietary Vols I-IV of WCAP-14252, AP600 Low- Pressure Integral Sys Test at Oregon State Univ Final Data Rept. Rept Withheld from Public Disclosure Per 10CFR2.790 +
- ML20086C787 +
- ML20085H030 +
- ML20085K284 +
- ML20086B359 +
- ML20198L869 +