GNTENf0R ENERGY 300 Madison Avende John P. Stotr Toledo, OH 43652 0001 Vice President Nuclear 419-249-2300 Davis-Besse Docket Number 50-346 License Number NPF-3 Serial Number 2298 June 13, 1995 United States Nuclear Regulatory Commission Document Control Desk Vashington, D. C.
20555 Subj ec t :
Status of Progress in Resolving Issues Identified in Generic Let ter 92-08, "Thermo-Lag 330-1 Fire Barriers," and Related NRC Requests for Additional Information (TAC No. 85542)
Ladies and Gentlemen:
The Nuclear Regulatory Commission (NRC) issued Generic Letter 92-08 on December 17, 1992 (Toledo Edison Log Number 3916). Toledo Edison (TE) responded, as applicable for the Davis-Besse Nuclear Power.. Station (DBNPS),
on April 16, 1993 (TE Serial Number 2132).. The NRC issued subsequent requests for additional information regarding Generic. Letter 92-08 on December 21, 1993 (TE Log Number 4125), September 15,.1994 (TE Log Number 4398), and December 23, 1994 (TE Log Number 4464). Toledo Edison responded on February 11, 1994 (TE Serial Number 2201), December 8, 1994 (TE Serial Number 2258), and March 22, 1995 (TE Serial Number 2282), respectively.
The December 8, 1994 and March 22, 1995 letters described TE's various plans and schedule to resolve the Thermo-Lag issue for the DBNPS, and stated that the NRC will be provided with an update in June, 1995. Accord-ingly, a comprehensive update of TE's current progress and plans regarding Thermo-Lag 330-1 fire barrier issues is provided in the enclosure.
Toledo Edison's April 16, 1993 letter discussed that, as an interim mea-sure, TE has established hourly fire watch patrols as compensatory measures in the rooms.where the Thermo-Lag 330-1 fire barrier system is used as a 1-hour or 3-hour fire barrier for the protection and separation of safe shutdown capability. These compensatory measures are in addition to the existing fire detection and suppression systems installed at the DBNPS, the onsite fire brigade, and the combustible material controls program, which together ensure the public's health and safety is being safeguarded.
~
9506200292 950613 PDR ADDCK 05000346 P
PDR Operating Componses:.
Clweland Elecmc illuminating
(
Toledo Edison g
i i
l l
-Dock 9t Nu;ber 50-346 Lictnsa Nurber NPF-3 Serial Number'2298 i
~ Prge - 2.
i l
l iToledo Edison vill continue to maintain these compensatory measures-in.
place while it continues its progress on the resolution of the Thermo-Lag i
-330-1. issue.
Toledo Edison will provide another update of its progress and plans.to address the Thermo-Lag 330-1 issue by December 15, 1995.
If you have any 1
questions, please contact Mr. V. T. O'Connor, Manager - Regulatory Affairs, at (419) 249-2366.
4 i
Very truly yours,
/b l
l MKL/laj-i Enclosure i
ec:L L.
L~. Gundrum, NRC'NRR DB-1 Project Manager I
J. B. Martin, ReF',c.aal Administrator, NRC Region III j
S. Stasek, NRC RegiSn III, DB-1 Senior. Resident Inspector l
Utility Radiologica:'. Safety Board i
l l
u I
1 I
I l
j
Dock t Nurber 50-346 LicInsa Nu;ber NPF-3 S:ricl Nurb2r 2298 l
Enclosure 4
Page 1 STATUS OF PROGRESS IN RESOLVING ISSUES IDENTIFIED IN GENERIC LETTER 92-08 AND RELATED REQUESTS FOR ADDITIONAL INFORMATION FOR l
DAVIS-BESSE NUCLEAR POVER STATION UNIT NUMBG 1 I.
10 CFR 50 Appendix R Raceway Applications A. Installed Quantities As described in previous Toledo Edison (TE) correspondence, one hour fire barrier raceway configurations at the Davis-Besse Nuclear Power Station (DBNPS) include approximately 740 linear feet of conduits and approxi-mately 1000 square feet of boxes (around condulets, flow transmitters, i
l multiple conduits, etc.).
Three hour fire barrier raceway configurations l
include approximately 170 linear feet of conduits and approximately 860 square feet of boxes. Thermo-Lag 330-1 is not utilized in cable tray fire barrier applications. There are 10 rooms in the plant which.contain one hour or three hour fire barrier raceway configurations constructed of Thermo-Lag 330-1.
l B. Installed Configuration i
Plant valkdowns have been completed to verify Thermo-Lag 330-1 raceway j
installation details. Detailed drawings have been completed showing Thermo-Lag 330-1 layout and dimensions.
l C. Industry Test Program Toledo Edison is participating in the ongoing industry fire endurance test program coordinated by the Nuclear Energy Institute (NEI). The purpose of this test program is to address generic industry issues associated with.
the fire endurance capability. As part of the program, extensive fire eadurance testing was conducted to establish performance of various
'oaseline and upgraded fire barrier configurations.
An Industry Applica-tion Guide (IAG) was developed to assist utilities in evaluating plent-l specific installed terrier configurations versus the tested configura-i tions. The IAG, issued by NEI in July, 1994, includes test data for I
testing performed by NEI, Texas Utilities Electric Company, and the i
Tennessee Valley Authority. The evaluation conducted for the DBNPS fire barriers using the IAG is described in Section I.D below.
Dockst Nurb:r 50-346 Lictnsa Nu2bar NPF-3 S; riel Nurb:r 2298 Enclosure 1
Page 2 NEI is considering additional fire endurance testing this summer and has-solicited input from utilities for specific test configuration needs..
Teldo Edison has requested that the testing include several DBNPS config-trations for which the testing conducted to-date.is not bounding a large box configuration, a ganged conduit configuration using pre-shaped sec-tions, various concrete vall interfaces, and box configurations construc-ted with panels with flattened v-ribs.
D. Industry Application Guide Evaluation Toledo Edison completed.its. baseline IAG Evaluation in March, 1995.
For evaluation purposes, the. fire barrier systems. vere' separated into seg-ments.
Seyment boundaries were chosen considering the following charac-teristics: e change in barrier construction technique; a significant change in protected commodity or contents; a variation from applicable barrier' installation requirements; a change in the. type of barrier mater-ial; or a chane in the orientation of the protected commodity or barrier which necessitated a change in barrier construction technique.' Each segment was designated a unique identification number. The segments are listed in the Attachment.
Each segment was evaluated to determine whether it is bounded by an existing test, and if so, the corresponding level of fire resistance capability. It was determined that all barriers _ vill require additional action in order to achieve compliance with the existing Appendix R.
The various options to achieve compliance are described in Section I.E below.
The IAG Evaluation vill be updated as necessary to reflect the results of ongoing vork.
E. Approaches to Achieve Appendix R Compliance Toledo Edison is pursuing multiple approaches to achieve Appendix R compliance. ' Toledo Edison has completed an evaluation of eliminating the need for fire barriers via either safe shutdown re-analysis or via the addition of operator actions, hence allowing either the removal of certain fire barriers or abandonment in-place. These approaches have been deter-mined not to be feasible.
The selection of a particular approach or combination of approaches vill likely vary room-by-room and barrier-by-barrier, depending primarily on technical feasibility, cost, schedule, and consideration of various peripheral issues described in Section IV below.
Some of the approaches vould require additional testing, either individu-ally or in concert with other utilities. The need for additional testing is an important consideration due to its high cost with no guarantee of successful results.
[
~ Dockot Nurber 50-346:
L Lic:nsa Nuiber'NPF-3
, Sirial Nurber 2298 Enclosure Page.3 4
4:
j '
- l. Removal and Replacement with-Alternate Material Toledo Edison is currently evaluating a preliminary proposal obtained from a vendor to remove existing Thermo-Lag 330-1 fire barriers and replace them with an alternate material shown by testing to meet
[
' Appendix R requirements.; This' approach is being. implemented by several j
other plants.
Limited additional testing may be required in order to j
implement this~ approach.
v 2.' Upgrade Toledo Edison is evaluating a preliminary proposal' obtained from a:
j vendor to overlay existing Thermo-Lag 330-1 fire barriers with an' additional thickness of Thermo-Lag 330-1 and/or Thermo-Lag 770 mater.
ial, and to make appropriate structural' upgrades such as joint" rein-forcements and additional stress skin.. Testing has.been conducted'for certain configurations by other utilities land.by NEI, however addi-tional testing would likely be required to implement this approach.,
{
Toledo Edison is avaiting a similar; preliminary proposal from:another vendor to overlay existing Thermo-Lag 330-1 fire-barriers with a j.
'different material.
j'
- 3. Exemptions 1
Toledo Edison is contemplating submitting exemption 1 requests for j
certain barriers or rooms ~ based on an evaluation of the existing protection (detection,' suppression, and barriers) against'the specific i
hazards in the room.
Such exemption requests vould provide the in-l formation suggested in'the NRC's September 15, 1994 letter. The
' exemption requests vould ' provide. a sound technical justification that clearly demonstrates that the fire. protection defense-in-depth-is.
[
appropriately maintained.
If
]
An example of a candidate for'an exemption request is a 3 hour3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> ~ fire barrier which'can be shown by existing testing-to be qualified for at 3
least'one hour, installed in a room which lacks' automatic suppression, but where automatic' suppression is highly undesirable due to the 4
presence of high voltage switchgear.
E j
4.'Other-Approaches Other approaches'being contemplated on a barrier-by-barrier basis includes addition of a fire vall made of a material such'as gypsum-panels to completely enclose a raceway; rerouting or modifying cir-cuits; and addition of automatic suppression systems.
Dockat Nurbar 50-346
.Liccnto Nurber NPF-3 Strici'Nurbsr 2298 Enclosure i
Page 4 1
i II. ' 10 CPR 50 Appendix R Radiant Energy' Shield' Applications.
i j
A. Installed Quantities-lAs" described in previous.TE correspondence,to?the NRC, there are about.170-linear: feet offradiant energy shields located'in the containment and the' containment-annulus..
[
B. Installed Configuration
-Plant'walkdowns have been completed to verify Thermo-Lag 330-1 radiant _
energy shield installation' details. Detailed drawings have been completed' i
showing layout and dimensions.
C. Containment Annulus Exemption' i
A 10 CFR Part 50 Appendix R exemption request'was previously submitted on' May 18, 1990 (TE Serial Number 1809) which is based, in part, on the.
existence of radiant energy shields.which' separate redundant trains of
'l safe shutdown circuits'within the containment annulus. - These shields are made in part of Thermo-Lag 330-l' fire barrier material..By. letter dated February'24, 1993 (TE Serial Number.2118), TE notified-the NRC of plans to submit additional information in support of.the exemption request, based on the ongoing industry.and NRC~ efforts regarding Thermo-Lag. By;1etter-
~
dated May 23,:1993'(TE Log Number 3965), the NRC notified TE that=the.
a
-review of the exemption request was being suspended pending submittal'of the additional information.
4 4
s
}
D. Approaches to Acbieve Appendix R Compliance Section III.G.2'ol' Appendix R allows:the option of' installing a noncom-
~
bustible radiant energy shield to separate redundant. trains in contain-ment. Based on Section 3.7.1 of. Generic Letter'86-10, " Implementation of Fire Protection Requirements," dated April:24, 1986, Toledo Edison inter-preted that any material with a 1/2-hour fire rating is-capable of.
~
s.
performing the required function of the radiant energy shield. However, as stated in NRC Information Notice 95-27, "NRC Review of Nuclear Energy Institute 'Thermo-Lag 330-1 Combustib3.lity Evaluation Methodology Plant' Screening Guide'", dated May 31,'1995, the NRC has taken a position that Thermo-Lag 330-1 has combustible chareteristics similar to those of other nuclear power plant combustible materiala,, and.that the NRC Staff will-therefore not accept the use'of.Thermo-Lag materials where noncombustible materials are specified by NRC fire protection requirements.
Prior to the receipt of Information Notice 95-27, Toledo Edison'slsteategy i
of demonstrating' compliance with respect to radiant energy shields, as described in its December 8, 1994 letter, was/to show that the radiant energy' shields'are adequate based on extrapolation of the testing' sum-marized in the Industry Application Guide. Accordingly, the radiant energy shields were separated into segments and. included in the Industry Application Guide Evaluation describad in Section I.D above. The radiant energy shield segments are included in the Attachment. The goal was to r
4
) -. -
(DockatNubar 50-3461 Lictnsa Nu;ber NPF-3 Serial Nu2bar 2298 Enclosure-Pagef5 demonstrate stileast a 1/2-hour fire rating..' Based'on the baseline IAG Evaluation, further evaluation and analysis is required'to demonstrate the.
H required fire rating. -Additional testing would likely be required.--
I:
In' light.of.the NRC: position described in-Information Notice 95-27, the' most likely. options are_to.either replace the Thermo-Lag;with an alternate material, or to complete the IAG Evaluation and submit'an exemption l
request:for both the containment and containment. annulus applications.
L Both of these options are being evaluated'by TE.
l Toledo Edisonfis evaluating a preliminary proposal obtained'from a vendor' to remove l existing Thermo-Lag 330-1 material'from all radiant energy 1
shields and replace them with a noncombustible alternate material shown by testing to meet" Appendix R requirements.
1 For the?conta Mment annulus applications, information (on either thel j
e existing installr ion or on a replacement' installation with an alternate-material),will be~semitted in support of the previously submitted exemp :
~ tion request described in Section II.C,Sto allow the NRC to resume pro- ~
i cessing of the request. A schedule is included in'Section V below.
l III.
10 CFR 50 Appendix R Structural Steel Applications l'
A.-Installed Quantitles l-As described.in previous' correspondence, there are about 2200. square feet of Thermo-Lag 330-1 installed as fireproofing'on structural steel located Lin.16 different rooms in the' plant..
B. Installed' Configurations t
1
-Plant walkdowns have.been completed to verify. installation details.
Detailed drawings.have been completed showing Thermo-Lag 330-1 fireproofed.
structural steel-layout and dimensions.
C. Approaches to Achieve Appendix R Compliance Toledo Edison's initial strategy.of. demonstrating compliance with respect to structural steel fireproofing, as described in its-December 8,L1994.
letter, was to show that structural steel'~fireproofing applications are adequate based on extrapolation of the testing summarized in the' Industry l:
' Application Guide. Accordingly,~ the structural steel applications were-
. separated into segments and included in the. Industry' Application Guide
- l Evaluation ~ described in'Section I.D above.- The structural steel segments are included in the Attachment. The goal was to demonstrate a 3 hour3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />. fire-rating, taking into account the high failure temperature.'of the steel' (over.1000*F). Based 'on the baseline IAG Evaluation, ' further ' evaluation and' analysis-is required to demonstrate.the requir?d fire' rating;
.'If the above approach is not feasibb, the most likely option would be.
either to conduct' additional testing, replace the Thermo-Lag with'an
,r
+,w s
p-w r
I' Dockst Nu ber 50-346 l6
. :Liccnsa Nurbsr NPF-3
( <'
Serial Nu-ber<2298 l
Er, closure
.Page 6 i
. alternate material, or submit an' exemption request to the'NRC.
Each of' these options are being evaluated.
L Toledo Edison is evaluating a preliminary proposal obtained from a-vendor to remove the' existing Thermo-Lag 330-1' installed in structural steel.
. applications and replace.it'vith an al:?rnate material shown by testing to meet Appendix R requirements.
-IV.
Peripheral Issues
~
Thermo-Lag 330-1'and fire protection continues to be an evolving issue.
. Listed below are discussions of several peripheral issues that'may have a
-bearing on the specific approaches to be utilized.:
A. Thermo-Lag 330-1 Materials The' December 23,'1994 NRC letter requested a description of the specific tests and analysis that vill.be performed to verify that1the Thermo-Lag fire barrier materials that are currently-installed.at the DBNPS are.
representative of the materials that were used to. address theitechnical-l
. issues associated with Thermo-Lag-barriers and'to construct fire endurance and ampacity derating-test specimens. The letter:further stated.that the following material properties and attributes should be addressedo chemi-cal composition; material thickness;l material weight 'and = density;. the presence of voids, cracks,'and delaminations; fire endurance c'apabilities;
. combustibility; flame spread rating; ampacity derating; and mechanical properties such as tensile strength, compressive' strength ~, sheer strength, and flexural strength.
As stated in'the March 22, 1995 TE response to-the December 23, 1994 NRC letter, the issues raised will be' factored!into'the decision-making process for resolving the Thermo-Lag issue.
If the' decision-is made to retain Thermo-Lag for at least some applications, then a detailed plan and l
schedule'for addressing the issues raised regarding material properties and attributes will be provided to the NRC..
The March 22, 1995 TE letter further stated that under the assumption that l
retention of Thermo-Lag in certain applications may be a viable option, TE is participating in a joint utility effort to confirm via' creation of a generic data pool'that there are no significant Thermo-Lag chemical L
composition variations.. This joint utility effort, which is being coordi-i.
nated by NEI, involves the comparison of samples submitted by individual L
utilities. A single laboratory vill compare the samples using pyrolysis L
gas chromatography testing conducted under a. standard test protocol, and-the results compared to results of previous NEI and utility tests.
l In March, 1995, TE submitted four Thermo-Lag 330-1 samples obtained from L
its warehouse stock to the laboratory selected by NEI, NUCON Incorporated L
of Columbus, Ohio; one sample each from a 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.and 3 hour3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> panel section j'
and a 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and 3 hour3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> pre-shaped conduit section.- Toledo Edison is avaiting the results of the laboratory analyses.
l l
' Dockst Nu2ber 50-346-Lic2nsa Nu1btr NPF-3 Sarial Nu:iber 2298 I
Enclosure Page'7 B.'Important Barrier Parameters The December 23, 1994 NRC. letter requested a description of the examina-tions and inspections that will be performed to obtain the important barrier parameters given in Section II of the December 21, 1993 NRC.
Request for Additional Information.
As stated in the March 22,:1995 TE response to the December 23,.1994'NRC-
~
't letter, the issues raised will be factored into the' decision-making.
process for resolving the Thermo-Lag issue. The number of examinations and inspections ~that would be performed would depend on the' number of fire
' barrier applications for which Thermo-Lag 330-1 vill be retained.' If the-decision ~is made to retain Thermo-Lag for at least some applications, then-a detailed plan:and schedule for addressing the issues raised vill be provided to the NRC.
C. Ampacity Derating As stated in the September 15, 1994 NRC letter (TE Log Number'4398), there are unresolved technical-issues regarding empacity derating, ar,d it~is the NRC's view that-these issues can'be resolved independently of the fire endurance issues.. Toledo Edison vill continue to follow the developments, in resolution of this. issue. However, based on plant-specifle. calcula-tions which used ampacity derating factors provided by the Thermo-Lag
'330-1 manufacturer, ampacity derating is not expected to be a concern for power cable circuits protected by Thermo-Lag 330-l'at DBNPS, evenlif
,significant adjustments to the ampacity derating factors previously provided by the vendor need to be applied.
Toledo Edison recognizes that ampacity derating is a' consideration for
.whatever choice of approach is utilized 1to achieve Appendix R compliance, and that the plant-specific calculations.will need'to'be revised.
D. Increased Hanger' Loads The ability of hangers to handle' increased load duelto' installation of l
additional fire barrier material or replacement with.a heavier fire 4
barrier material, is an important consideration that will be factored into the. decision-making process for resolving the Thermo-Lag issue.
E. Fire Modeling Toledo Edison has closely followed the Electric Power Research Institute (EPRI) and: joint utility efforts:regarding the development and use of j
.special fire modeling tools. Toledo. Edison has also had discussions with a consultant regarding alternate fire modeling tools, and has attended NRC/ utility meetings'vhere the use of fire modeling has been discussed.
1 Based on the'available information to date,' Toledo Edison vould'not anticipate submitting an exemption request that' relies' solely on fire.
modeling.:
4
..A.'.
e m
-m
' 1
Dockst-Nu;bsr 50-346 Licznsa Nn:bar NPF-31 S2 rial Nurbsr 2298 Enclosure-Page 8 I
V.
Schedule Toledo Edison's current schedule for resolution.of the Thermo-Lag 330 ;
' Appendix R fire' barrier concerns, including raceway, radiant energy shield, and. structural steel applications,-is as follows:
- Establish by June, 1996,~the approach to achieve' Appendix R compliance.
In order to support this schedule date, specifications would be prepared, a formal bid process would be' conducted, and conceptual designs prepared, as applicable for the. specific option to be recommended.- In addition, fire modeling'vould be. completed,'as.
applicable, to support submittal of exemption' requests.- Evalua-tions and analyses for radiant energy shield.and structural steel applications would be completed. Recommendations for any addi-tional testing or field inspections / examinations to be performed would also be developed-1
- Submit by September,1996, additional information to cis NRC 'inL l
support of the previously submitted exemption' request for: radiant.
energy shield applications in the containmentLannulus (described.in Section II above),.and submit any. additional Appendix R exemption-requests, as applicable, for NRC approval.
]
- Complete by December, 1996, plant modification design packages, as applicable.
i
- Field complete plant modifications, as applicable, by June, 1997, except for fire barriers (radiant: energy shields)' located in the containment or annulus, which would be field ~ completed during the Eleventh Refueling Outage (11RFO), which;is scheduled to end in March, 1998.
a
1%
Dock 2t.Nuxbsr 50-346-License Number NPF-3 Serial Number 2298 Attachment Thermo-Lag 330-1-Fire Barrier Segments (19 pages follow)
- _____ ------------ LEGEND --------=--
"ID"
= Unique Segment Identification Number.
(VVV-X-YY.ZZ) where. VVV = room number location X = design fire rating in hours YY = barrier sequential number ZZ =' segment sequential-number "SEG_ TYPE" = Segment Type where B = Box.
BN'- Box (Proximity Conduit)
BS = Boxed Support FB = Flexi-Blanket PS = Pre-Shaped PSE - Pre-Shaped Elbow
)
PSEN = Pre-Shaped Elbow (Proximity. Conduit)-
PSN = Pre-Shape (Proximity Conduit)
PSS = Pre-Shaped Support i
J TG = Trovel Grade Fill 1
" BOX _ SIZE" = Box Dimension (inches)
"RACEVAY" --Identification of raceway being protected
" SIZE"
= Size of raceway being protected (inches)
_____---====_________________________________
v
Page Not l'
05/23/95
- Thermo-Lag 330-1 Fire Barrier Segmente
- v BARRIER ID ROOM '
SEO TYPE BOX,8IZE RACENAY
'SIEE
.053-3-01.01 053 B_
10X24129'
'36058E 4:
053 3-01.02 053 BS
'5.5X6.75X10.5-
.36058E' 4..
(
053-3-01.03 053-PSN 36058E
'4.
053-3-01.04 053 BS
-9.25X10X17-360588
'4, 053-3-01.05 053 PS 36058E 4
0' 3 B
13.5X24X39.5 360585 4'
f 053-3-01.06 5
053-3 01.07'
'053 PS 36058E '
' 4 053-3-01.08 053 -
B 14X30.5X30-360585-4 053-3-01.09 053 PS 36058E 4
J 053-3 01.10
-053 8
6X8X11 -
'36058E "
4 053-3-01.11 053 PS 36058E 4
053-3-01.12 053 B
15.5X23.5138.5-360588 4
053-3-01.13
.053 BS 36058E
'4 053-3-01.14 053 PS
'360585:
4 l
053 3 01.15 053 B
'13X15.5X21
.360585 L4 053-3-01.16 053
. PSE 360585
- 4
?
f053 3 01.17
-053 BS
-360585 4..
053-1-01.18
'053
. PS -
36058E 4
053-3-01.19 053 BS 360585
.4 053-3-01.20 053 PSS '
4 DIAM.-
36058E 4
s 053-3-01.21 053 PSS 4.25 DIAM.
360505-
- 4' r
053-3-01.22 053 PSS 4.25 DIAM.'
360508-
'4 053-3-01.23 051 PSS 4 DIAM.
36058E' 4 --
053-3-01.24 053 BS 36058E 4
053-3-01.25 053 BS
'36058E
. 4 I
053-3-01.26 053 PS 36058E 4
053 3-01.27 053
- PSS 23.75 LENGTH 1360585 4-
.053-3-01.28 053 BS 4.25X13.5X14.75 360588-4
'053-3-01.29 053 PSS 23.75 LENGTH 360545 s 4' 053-3-01.30 053 PSN 36058E 4
053-3-01.31 053 BS 2.5X13X13 360585 4
053-3-01.32 053 BS 4X4X18 36058E 4
053 3 01.33 053 BS
-2.5X13X13 36058E 4
053 3-01.34 053 BS 4X4X10 360585 4
053 3-01.35 053 BS 4.5X4.5X18.5 360585 4
053-3-01.36 053 BS 4X14X36.5 360588 4
053 3-01.37 053 PSN 360585 4
053-3-01.38 053 PSN 36058B 4
j 053 3-01.39 053 B
5.5X7.75X8 36058B 4
053-3-01.40 053 PS 36058E 4
053 3-01.41 053 PS/TG 36 LENGTH 36058E_
4 053 3-02.01 053 B
12X12X13 36004E '
3 053-3-02.02 053 BS 4X5X41.5 360045 3
053-3-02.03 053 PSS 6 LENGTH 36004E -
3 053 3-02.04 053 B
4X8X8 36004E 3
053-3-02.05 053 BS 8X8X10 36004E 3-053-3-02.06 053 PSS.
9.25 LENGTH 360048 3
053 3-02.07 053 PS 36004E 3
053 3 02.08 053 BS 4.5X6.EX7 36004E 3
a 2
Pa'e'No.
' 2-g 05/23/95~
- Thermo-Lag 330-1 Fire Barrier Segments m
s
. BARRIER ID ROOM SEG_ TYPE BOX, SIZE RACENAY '
SIZE 053-3-02.09 053 BS 3.75X14X14
' 36dO4E 3
053-3-02.10 053' PS 36004E 3-053-3-02.11 053 PS 36004E 3
053 3-02.12 053-B 10X18.25X30.5 360045 3
053-3-02.13 053-PS 23 LENGTH 36004E 3
053-3 02.14 053 PS
'23 LENGTH
- 36004E 3
]
053-3-02.15
-053.
BS 8X13.5X24.5
. 360045
.3 i
053-3-03.16 053 BS 13.5X22X35.5 36004E
'31 2
053-3-02.17 053-PS 360045 -
'3 053-3 02.18 053 PS 36004E 3
053 3-02.19-053 BS 5X8X27 360045 3-053-3-02.20 053-PS 9 LENGTH 360045-3' 053-3-03.01 053 B
12X12X13 36005D 4
053-3-03.02 053 PSS 6 LENGTH 36005D 4
053-3-03.03 053 BS 5X13.EX41.5 36005Dc 4'
]
053 3 03.04 053 PS
.-36005D.
'4-053 3-03.05 053 BS 4.5X6X14.5 36005D 4
053-3-03.06 053 BS 4.5X6,5X7 36005D '
4' 053 3 03.07' 053 BS 3.75X14114
- 36005D
^4.
043-3-03.08 053 BS 9X15.25X58 36005D
.4 I
053-3-03.09 053 PS 36005D'
-4, 053-3-03.10 053 PS
' 36005D 4'
j -.
053 3-03.11 053 8
9X10.5X13.5 36005D 4
-053 3-03.12 053 PS 36005D.
4-053-3-03.13 053 PSS
. 11.25 LENGTH 36005D 4
053-3-03.14 053 PSS
'11.25 LENGTH
. 36005D 4
053-3-03.15 053 PS
-36005D 4
053-3-04.01 053
- PS 36201D 4
053-3-04.02 053 PSS 9.25 LENGTH 36201D:
4 I
053 3-04.03 053 PSS 9.25 LENGTH 36201D-4 053 3-04.04 053 BS 6.75X12.5X15 36201D 4
053 3-04.05 053 B
9.5X9.5X60 36201D 4
053-3-04.06 053 PS 36201D 4
053-3-04.07 053 B
11.25X12.5X14
. 36201D 4
053-3-04.08 053 BS 4X13X13 36201D 4
053-3-04.09 053 BS SX5X17.5
- 36201D 4
053 3 04.10 053 PS 36201D
.4 a
053-3-04.11 053 B
?.75X8X8 36201D 4
053-3 04.12 053 B
8X12.5X14 36201D '
4 053-3-04.13 053 BS 9X10.5X10.5 36201D 4
053-3-04.14 053 PSS 9 LENGHTH 36201D 4
053-3-04.15 053' PSS 11 LENGTH 36201D 4
053-3-04.16 053 PSS 11 L8NGTH 36201D 4
-i 4
053-3-04.17 053 BS 6.$X12X62 36201D 4
053-3 04.18 053 3
11X12.5X14 36201D 4
053-3-04.19
'053 PSN 36201D 4
053-3-04.20 053 PSN 36201D 4
- 105-3-01.01 105 PS.
18277A 3
105-3-01.02 105 PS 18277A' 3
r-e
I Page No.
3 05/23/95
- Thermo-Lag 330-1 Fire Barrier Segments ***
BARRIER ID ROOM SEG_ TYPE BOX _ SIZE RACEWAY SIZE l
105-3-01.03 105 PSE 18277A 3
105-3-01.04 105 PS 18277A 3
105-3-01.05 105 PS 18277A 3
105-3-01.06 105 PSE 18277A 3
jd 105 3-01.07 105 PSE 18277A 3
105-3-01.08 105 PS 18277A 3
105-3-01.09 105 PSE 18277A 3
105-3-01.10 105 PS 18277A 3
105-3-01.11 105 PSE 18277A 3
105-3-01.12 its PS 18277A 3
105-3-01.13 105 PS 18277A 3
105-3-01.14 105 PSE 18277A 3
105-3-01.15 105 PS 18277A 3
105-3-01.16 105 BS 4X6X10.5 18277A 3
105-3-01.17 105 PSN 36 LENGTH 18277A 3
105-3-01.18 105 BS 2.5X6.5X13 18277A 3
105-3-01.19 105 B
6.5X11.5X17.5 18277A 3
105-3-01.20 105 BS SX8.5X10.75 18277A 3
105-3-01.21 105 BS 4.25X6X10.5 18277A 3
105-3-01.22 105 PSN 38.25 LENGTH 18277A 3
105 3-01.23 105 BS 2.5X6.5X13 18277A 3
105-3-01.24 105 BS 5.125X6.5X11 18277A 3
105-3-01.25 105 PS 38.25 LENGTH 18277A 3
105-3-01.26 105 BS 4.25X6.5X10.5 18277A 3
105-3-01.27 105 BS 2.5X6.5X13 18277A 3
105-3-01.28 105 B
10X10X16.25 18277A 3
105-3-01.29 105 BS 4.75X6.25X8 18277A 3
105-3-01.30 105 BS 3X8.75X11 18277A 3
105-3-01.31 105 B
8X8.5X14 18277A 3
105-3-01.32 105 PSN 36.25 LENGTH 18277A 3
105-3-01.33 105 BS 4.75X10,5X18.5 18277A 3
105-3-01.34 105 PSS 10.5 LENGTH 18277A 3
105-3-01.35 105 BS 14.5X18127.5 18277A 3
105-3-01.36 105 PSN 7 LENGTH 18277A 3
105-3-01.37 105 BS 10X10X48 18277A 3
105-3-01.38 105 BS 7X7X16 18277A 3
105-3-01.39 105 BS 6X6X25 18277A 3
i l
105-3-01.40 105 BN 5X18X18 18277A 3
105-3-01.41 105 PSN 4.5 LENGTH 18277A 3
105-3-01.42 105 PSN 4.5 LENGTH 18277A 3
105-3-01.43 105 PSN 12 LENGTH 18277A 3
i 105-3-01.44 105 PSEN 18277A 3
105-3-01.45 105 PSN 22 LENGTH 18277A 3
105-3-01.46 105 BS 7X7113 18277A 3
105-3-01.47 105 BS 4X5.5X49 18277A 3
105-3-01.48 105 BS 2X8X10 18277A 3
105-3-01.49 105 B
7X7.5X42 18277A 3
105-3-01.50 105 B
6.5X9.5X10 18277A 3
105-3-01.51 105 PSN 2 LENGTH 18277A 3
1
.,,~.....
l I
i Page No.
4.
05/23/95
- Thermo Lag 330-1 Pire Barrier Segments ***
]
BARRIER ID
. ROOM SEG_ TYPE
. BOX,SIEE RACENAY.
- SIXE j
105-3-01.52 105 BS 12X15.5X40 18277A.
3 105-3-01.53 105
' PSN 9.5 LENGTH
,18277A
'3 105 3-01.54 105
.B.
6.519.5X18 18277A -
.' 3 105 3-01.55
'105 BS-10.5X12X38
- .18277A.
-3
-105-3-01.56 105 BS' 4X6X14.5-
/18277A.
3 105-3-01.57 105 BS 4X6X14.5 18277A'
~3 105-3-01.58 105-PS 4 LENGTH 18277A' f3 i
105-3-01.59
'105
' BS :
11X14X42 18277A-3 105-3 01.60 105 PSN 12 LENGTH
-18277A 3:
105 3-01.61-105
- PSN,
12 LENGTH 18277A 3
105-3-01.62' 105:
PSN 12 IJDR7D{
~18277A
-3 105-3-01.63 -
105 B
7X7X14.5~
~18277A' 3
105-3-01.64 105
. BS 10X11X38 18277A'
-3 105-3-01.66 105 BS 7X16X16
'18277A'L
.3 105-3-01.67 105 PSS 40 LENGTH 18277A 3'
105-3-01.68 105 PSS 40 LENGTH 18277A.
3 105-3-01.69 105 PSN 15 LENGTH 18277A q
13
+
105-3-01.70 105 PSN 15 LENGTH
-il277A.
~3 105-3-01.71
.105 PSEM
-18277A
.3' 105 3-01.72 105 PSN 18 LENGTH
'18277A
'3' 105-3-01.73 105 BS
.5X5X10' 18277A.
'3-l 105-3-01.74 105 PSN 7 LENGTH
.18277A' 3
105-3-01.75 105.
B 12X12X18.
18277A; 3
105-3-01.76 105 PSN
- 13 L5NGTH 18277A 3
105-3-02.01' 105 BS 10X13X120.
STEEL. -
105-3-02.02 105
' BS 4X4X4 STERL' 105-3-02.03 105 BS 4X7X7 STEELi 105-3-02.04 105 BS SX7X7 STEEL 105-3-02.05 105 BS EX6X6
- STREL.
105-3-02.06 105 BS 6X8X10
- STEEL 105 3 02.07 105 BS 3X3X18 STEEL 3 105-3-02.08 105 BS SX8X14 -
STEEL.
105-3-02.09 105 BS 3X5X10 STEEL-105 3 02.10 105 BS 3X5X10
' STEEL l
105 3-02.11 105 BS SX16X19 STREL 110A-3-01.01 110A BS 6X13X19
-STEEL 110A-3 01.02 110A BS 10X12X79 STEEL
]
110A-3-01.03 110A
- BS 4X4X4.5 STEEL 130A-3-01.04 110A BS '
4X4X4.5-STEEL j
113A-3 01.01 113A PS 6 DIAM.
18227A 3
18227A 3
113A-3-01.03 113A BS 4.5X6X20.5 18227A 3
113A 3-01.04 113A BS 3X12X12
~ 18227A.
~3
)
113A 3-01.05 113A
~ BS 4.5X6X20.5 18227A 3
36 LENGTH 18227A'
'3 113A 3-01.07 113A BS 3X12.5X13 18227A' 3-113A-3-02.01
- 113A, (BS 12112X62 STREL 113A-3-02.02 113A' BS 3X5X21 STEEL J
113A-3-02.03 113A BS 3X5X12 STEIL 1
Page No.'
- 5
05/23/95.
- Thermo-Lag 330-1 Fire Barrier. Segments.***
BARRIER ID' ROOM-SEG. TYPE
-BOX _8125 1 RACEWAY
' $12E -
i 113A-3-02.04 113A.
58 "213'.5121' STEEL
'113A-3-02.05 113A BS 2X5X21 STREL.
113A-3-03.01 113A BS-10X12X61' STEEL j_
113A-3-03.02-113A-B 4X4X18 STEEL
=113A-3 03.03
.113A'-
58 3X5X10 STEEL = '
113A-3-03.04 113A ':
BJ
- 6X6X18
_ STEEL e
113A-3 03.05
'113A' B
4X4X18 STEEL -
113A 3 03.06 113A-
-B' 4X4X18
. STEEL,
114 3-01.01 114 3
11.5X12X21.5 36006B 2
d 114-3-01.02 114 PSE SEE NB15-1200B81s 36006B'
'2-
~
114-3-01.03
'114 -
B 15.5X23.5X72 36006B
'2 114-3-01.04-
- 114 B
17.5123.53G4
-36006B 2
114-3-01.05 114
' PS SEE NEIB-1200BS1
~36006B 23 114-3-01.06 114:
PS
'8112 ELIPTICAL -
.s 360065
" 2~
+
114-3 01.07
. 114 BS 3X6.5X13-36006B 2
114 3-01.08 114 BS 515.5X37 36006B -
J2'-
4 114-3-01.09 114
' BS 3X6.5X13
'360068_
- 2 1
114-3 01.10 -
114
. BS 5X5.5X34 36006B 2
114-3-01.11 114 BS '
3X6.5X13, 360068-
.2 s
114-3-01.12 114 BS
. 5X5.5X37-36006B 2
114-3-01.13 114 BS -
'3X6.5X13 36006B' 2.
114-3-01.14 114 BS SX5.5X34
'360068
-2 114-3-02.01 114 5
8X11.5X16 36006B 2
114 3-02.02 114 PSE 360005
'2 114-3-02.03 114 PS 3600081 2
114 3-02.04 114 8
9X11.5X16 360008E 2
114-3-03.01 114 PSE 360098-4 114-3-03.02*
114 PS 36009B.
4 114 3-04.01 114 BS 10X12.5139' STEEL 114-3-04.02 114-BS 4X16.5X19 STEEL 114 3-04.03 114 B8 13X15.5123 STEEL 127.5-01.01 127 BS 3X12X12 P1P38.
127.5-01.02 127 B
40.5X41.75X42 P1P3B 127.5-01.03 127 B
14X42X42 P1P3B 127.5-02.01 127 BS '
3X14X14 P2P5F 127.5-02.02 127 BS SX14X14 P2P5F 127 5-02.03
'127 BS-3X5X14 P2 PSF 127.5-02.04 127 9
18X18X42
.P2P5F 127.5-02.05 127 B
14X22X42-P2i5F 127.5 02.06 127 B'
22.5X23X44 P2P5F 127 5-03.01 127 88 2.5X11.5X11.5.
P2C50 127.5 03.02 127 B
39.5139.5X42.
P2C50 s
127.5-03.03 127
-B 13X43.5X.4 P2C5G I
217.5-01.01 217 PS 39028C 3
I 217 5-01.02 217 PS 39028C 3
217 5+01.03 217 B
8X8X20 39028C 3
217 5-01.04
.217 PS 39028C 3'
217.5 02.01 217 PS
- 39029C 3
~217.5 02.02 217 PS 39029C 3
r
Page No.
6-05/23/95
- Thermo-Lag 330-1 Pire Barrier segments ***
BARRIER ID ROOM SEG_ TYPE BOX _SIER RACEWAY SIEE 217.5-02.03 217 8
8X8X10 39029C 3
217.5-02.04 217 BS 3X8X12 39029C 3
217 5-02.05 217 PS/B ELIPTICAL 1CX8 39029C 3
217.5-02.06 217 BS 3X8X12 39029C 3
217.5-02.07 217 B
8X12X20 39029C 3
217.5-02.08 217 PS 10 DIAM. (3M) 39029C 3
217.5-03.01 217 B
7X14X42 39019C 3
217.5-03.02 217 PS 4 LENGTH 39019C 3
217.5-03.03 217 PS 5 DIAM.
(3M) 39019C 3
217.5 03.04 217 8
14X19X42 39019C 3
217.5-04.01 217 B
7X14X42 39020C 3
217.5-04.02 217 PS 4 LENGTH 39020C 3
217 5-04.03 217-PS 5 DIAM.
(3M) 39020C 3
225-3-01.01 225 BS 10X14X26.5 STEEL 225-3-01.02 225 BS 10X14X117 STEEL
^
225-3-01.03 225 BS 10X14X298 STEEL 225-3-01.04 225 BS 10X14X54 STEEL 225-3-01.05 225 BS 10X14X298 STEEL 225-3-01.06 225 BS 16X16X100 STEEL 225-3-01.07 225 BS 16X16X100 STEEL 304-3-01.01 304 BS 14X17X189 STEEL 304-3-01.02 304 BS 2X4X17 STEEL 304-3-01.03 304 BS 2X4X7 STEEL 304-3-01.04 304 BS 2X8X17 STEEL 304-3-01.05 304 BS 4X4X7 STEEL 304-3-01.06 304 BS 4X7X24 STEEL 304-3-01.07 304 BS 4X6X7 STEEL 304-3-01.00 304 PSN 9* LENGTH
' STEEL 304-3-01.09 304 BS 4X7X14 STEEL 304-3-01.10 304 BS 4X7X14 STEEL 304-3-01.11 304 BS 4X7X14 STP.gL 304-3-01.12 304 BS 4X6X9 STELL 304-3-01.13 304 BS 4X6X14 STEEL 304-3-01.14 304 BS 4X9X9 STEEL 304-3-01.15 304 BS 9X10X10 STEEL 304-3-01.16 304 BS 4X6X7 STEEL 304-3-01.17 304 BS 4X4X14 STEEL 304-3-01.18 304 BS 6X12X21 STEEL 304-3-01.19 304 BS 4.5111X14 STEEL 304-3-02.01 304 BS 18X18X201 STEEL 304-3-02.02 304 BS 5X6X18 STEEL 304-3-02.03 304 BS 5X6X18 STEEL 304-3-02.04 304 BS 7X12X21 STEEL 304-3-02.05 304 BS 4X4X10 STEEL 304-3-02.06 304 BS 4X9X13 STEEL 304-3-02.01 304 BS SX10X13 STEEL 304-3-02.08 304 BS 5X9X17 STEEL 304-3-02.09 304 BS 4X5X8 STEEL 304-3-02.10 304 BS 417X7 STEEL
4 5
i Page No.
7 05/23/95 m Thermo-Lag 330 1 Fire Barrier Segments ***
BARRIER ID ROOM SEG TYPE'-
, BOX _ SIZE RACEWAY.
SIEE
+
304-3-02.11
.304 BS 4X6X6-
' STEEL 304-3-02.12.
304 l BS
.316K26' STEEL 304-3-02.13 304 BS.
4X16X19 STEEL 304-3-02.14 '
.304 BS 6X11X16
' STEEL -
304-3-02.15 304
. BS 5X617 -
STEEL -
304-3-02.16 304-BS 5K5X6 STEEL 304-3-02.17 304'
' BS 5K5X6 '
STEEL 304-3-02.18
-304 BS 5X6X7 STEEL 304-3 02.19
-304 BS.
$X6X7 STEEL 304-3-02.20 304 BS 6117X23' RSTEEL 304-3-02.21 304 -
BS 4X14X18'
- STEEL -
304-3-02.22
~304 BS 6X17X17-STEEL 313-1-01.01 313 B'
5.5X6X17.5 37087A 1.5 313-1-01.02
.313 8
5.5X6.5X12 37087A..
1.5
. 313-1-01.03 313 PSE'
-37087A'
'1+5' 313-1-01.04 313' PS 37087A 1.5 313-1-01.05' 313 BS 3.528122-37087A 1.5 313 1 01.06 313 PS 37087A 1.5 313-1-01.07 313
- B 4X4X31.5
-- 37087A :
1.5 1
313-1-01.08 313 BS 3.5X8X22'-
37087A 1.5 313-1-01.09 313 B
4X4X49o 37087A 1.5 313 1-01.10 313 8
4X4.25120-f37087A-1.5 313 1-01.11 313 B
4X4X5 37087A 1.5' 313 1-01.12 313 BS 3.5X8X22 37087A 1.5 313-1-01.13 313 B
4X4151 37087A.
1.5 313-1-01.14 313 BS 3.5X8122 37087A :
1.5 313-1 01.15 313-PS 37087A '
1.5 313*1-01,16 313 PSE 37087A:
1.5 313-1-01.17 313 PS 37087A
' 1,5 313-1-01.18 313 PSE 37087A 1.5 313-1-01.19 313 PS 37087A 1.5 313-1-01.20 313 BS 3.2517X25.75 37087A 1.5 313 1-01.21 313 PS 37087A 1.5 313-1-01.22 313 BS 3.25X7123.5 37087A 1.5 313 1-01.23 313 PS 37087A.
1.5 313 1-01.24 313 PSE 37087A
- 1. 5 313-1 01.25 313 PS 37087A 1.5 s
313-1 01.26 313 B
4.25X6.25K8.5 37067A 1.5 313-1 01.27 313 B
$X6.25X10 37087A
~1.5 313-1-01.28 313 PS
- 37087A
.1.5 313-1-01.29 313 BS 2X12112 37087A 1.5
- 313-1-01.30 313 PSN 9 LENGTH 37087A 1.5 313-1 01.31 313 PSN 9 LENGTH 37087A' 1.5 313+1-01.32 313
~ BS 2X11X12
,37087A 1.5 313-1-01.33 313 PSN 9 LENGTH -
37087A 1.5 313-1 01.34 313 PSN 9 LENGTH 37087A 1.5 313-1-01.35 313 BS 2X11.5X11.5 37087A 1.5 313-1-01.36 313 PSN 9 LENGTH 37087A 1.5 313 1-01.37 313 PSN 9 LENGTH 37087A 1.5 k.
?
7..
..m_
.,_m t
Page No.
'8' I
05/23/95
- Thermo-Lag 330 1 Fire Barrier Segments'.***'
I BARRIER ID ROOM'
.SBO TYPE BOX,8128,
RACENAY
? 8185
= }
~ 313 1 01.38
.313
- as
.2X12X16' 37087A
- 1. 5.
313-1-01.39 313 PSN 9 LENGTE 37087A'
.. 1. 5 -
313 1-01.40
.313 PSN 2 9 LENGTH 37087A 1.5 313 1 01.41 313 BN 2X2X3 37087A' 1.5
{
313 1 01.42.
313
- 38 2X5.5X14 -
37087A 1.5' 313-1 01.43 313 BN '
2X416 37087A 1.5 313 1 01.44 313 PSN 9.5 37007A 1.5
-s :
313-1*01.45 313 PSN.
9.5
-37087A -
' 1.5 313-1-01.46 313
- BS 2X5.5X14 37007A,.
1.5 313-1 01.47 313 P8N 9.51 37007A 1.5 313-1-01.48
'313' PSN '
9.5 37087A-
- 1.5
-314-1 01.01
- 314 PS
-18219A
~ 3 -_
'1.6 LENGTH
~18219A
. 3 314-1-01.02 314
- PS 314-1-01.03 314;
- B8 SX5X30 18219A 3
I 314-1 01.04 314
- PS.
2.5 LRNOTH 18219A 3
314 1-01.05 314 BS 2X10X10 18219A
3 314 1-01.06 314
-BS
'4X4X36 18219A
- 3
- [
'314-1-01.07 314 28 2X10X10 18219A 3'
314 1-01.08 314 BS SX5X42-18219A 3
314-1-01.09-314
- BS 5X12X12-18219A
- 3
- j 314-1-01.10 314' BW 3112X24
'16219A --
- 3-
. 314-1-01.11 314 BS 3X6X38 18219A -.
3 314-1-01.12 314 BS 3X10X10 u18219A-
. 3 5
314-1-01.13 314 58 323X13 18219A'
-3 f
j 314 1 02.01 314 5-6X14X26 PULL BOX l:
-314 1-02.02
.314
. B 5.5X18X30
... PULL BOX-5 314 1*02,03 314 BW 3X3X26 PULL BOX-314-1-03.01 314 PS 32 LENGTH 46087A STUB-OL7r.
- 2 Q
314-1-04.01 314 8
14.5X40X40.5 P1P3BX
~
314-1-04.02 314 BN 7.5X9X29 P1P3BX'
'314-1-05.01 314 PS 4 DIAM.'
46097A 3'
314-1'06.01 314 PS 3 DIAM.
46090A 3-314-1 07.01
'314
.B 7X9.5X58.5 1POS01 '
314-1-07.02-314
-B 4.5X9,5X58.5 1P0801 314-1-08.01-314 8
7.519X29 170802 l
314 1-08.02 314 DN 3X6X9
'1P0802 314-1-08.03 314 BN
-5X6.5X10.5 1P0802,,
_ 317. 5-01.01 317
. B 21X40X40 P1P3BI-317.5-01.02 317 BN 414X9 P1P3BI 317+.5 01.03 317' BN
'3X4X9 P1P381 -
317 5-01.04-317 8
4X7X9
'P1P3BI 317 5 01.05-317.'
PS 6 LENGTH P1P3BI 317*.5-01.06-317 PS P19381 317.5-02.01 317 P8 39028A'
. 3 317.5-02.02 317
- B8 5X5X80 39028A 3-317.5 02.03-317 38 4X10X10 39028A 3
317. 5 02.04 317 B8 334X5 39028A 3-A
-7 317.5 02.05 317 8
8X16428 39028A -
'3 f.-
317.5 02.06 317 '
58 39028A
. 3 s
w n
e n
v w
es--
Page No.
9 05/23/95
- " Thermo-Lag 330-1 Fire Barrier Segments ***
BARRIER ID ROOM SEG_ TYPE BOX _ SIZE RACEWAY SIZE 317.5-02.07 317 BS 8X10X10 39028A 3
317.5-03.01 317 PS 39029A 3
317.5-04.01 317 B
7X8X12.5 LT-RC14-1 317.5-04.02 317 B
11X13X18 LT-RC14-1 1
317.5-04.03 317 B
8.5X12.5X23 LT-RC14-1 317 5-34.04 317 B
6.5X1LX15 UT-RC14-1 317.5-05.01 G17 8
7X8.5X20 39274A
.75 317.5-05.02 317
-B 4X7X13 39274A
.75 317.5-05.03 317 B
3.5X6X9.5 39274A
.75 317.5-05.04 317 B
4.5X7.5X46 39214A
.75 317.5-05.05 317 8
5X13X24 39274A
.75 317.5 05.06 317 9
3X13.5X24 39274A
.75 317.5-05.07 317 8
5X13 X23
'39274A
.75 317.5-05.08 317 9
3X3.5X23 39274A
.75 317.5-05.09 317 B
4.5X7.5X24 39274A
.75 317.5-05.10 317 B
4.5X6X16 39274A
.75 317.5-06.01 317 PS 39019A 3
317.5 06.02 317 PSE 39019A 3
317.5-06.03 317 BS EX5X14 39019A 3
317.5-06.04 317 BS 7X8X13 39019A 3
317.5-06.05 317 BS 39019A 3
317.5-06.06 317 B
8X29X29 39019A 3
317.5-06.07 317 BS 39019A 3
317.5 06.08 317 PSN 39019A 3
317.5-06.09 317 BS 39019A 3
317.5-06.10 317 BS 39019A 3
317.5-07.01 317 PS 39020A 3
317.5-07.02 317 PSE 39020A 3
323-3-01.01 323 B/PS 7.518X13.5 46008C 4
323 3-01.02 323 B
9X9X42 46008C 4
323-3-01.03 323 PS 46008C 4
323-3-01.04 323 PSE 46008C 4
323-3-01.05 323 PS 46008C 4
323-3-01.06 323 PS 46008C 4
323-3-01.07 323 BS 6X6X17 46008C 4
323-3-01.08 323 BS 7X18X14 46008C 4
323-3-01.09 323 BS 6X6X12.5 46008C 4
323-3-01.10 321 BS 6.5X12.5X12.5 46008C 4
324-3-01.01 324 PS 36204A 2
324-3-01.02 324 B
6.5X6.5X21.25 36204A 2-324-3-01.03 324 PS 36204A
'2 324-3-01.04 324 BS 3X719 36204A 2
324-3-01.05 324 PS 36204A 2
324-3-01.06 324 BS 3X5.5X9 36204A 2
324-3-01.07 324 PSE 36204A 2
324-3-01.08 324 PS 36204A 2
324-3-01.09 324 B
9.5X9.5X12 36204A 2
324-3-01.10 324 8
14,5X40.5X43.5 36204A 2
324-3-01.11 324 B
7X16X20 36204A 2
Page No.
10 05/23/95' Thermo-Lag 330-1 Fire Barrier Segments ***
m l
BARRIER ID ROOM SEG,TYP5 BOX _ SIZE RACEWAY SIZE 324 3-01.12 324 BS 6X8X16.5 36204A 2
124-3-01.13 324 PS 36204A
'2 l
324-3-01.14 324 BS EX6X9 36204A 2
324-3-01.15 324 PS 36204A 2
325-3-01.01 325 N/A N/A STEEL 328-1 01.01 328.
BS 2X11X11.5 JB3722 l
328-1-01.02 320 BS 4.5X4.5X119.5
- JB3722 328-1 01.03 328 BS 4.5X11.25X16.75 JB3722 328-1-01.04 328 BS 4.5X5.5X56
'JB3722
)
l 328-1-01.05 328 B
7.75X8.5X24 JB3722
)
I 328 1-01.06 328 BS 4 5X4.5X107.5 JB3722 i
j 328-1-01.07 328 B
12X22.5X57.5 JB3722 328 1-01.08 328
' BS 1.75X11.5X17.5 JB3722 328-1 01.09 328 PSN 26 LENGTH JB3722 328-1-01.10 328 PSN 10 LENGTH-JB3722 328-1-01.11 320 B
9,5X12X31.5 JB3722 328-1-02.01 328 PSE 37087A 1.5 328-1-02.02 320 BS 3X5X11.5 37087A 1.5 328-1-02.03 328 PS 37087A 1.5 l
328-1-02.04 328 BS 3.5X5132 37087A 1.5 328-1-02.05 328 PS 6.25 LENGTH 37087A 1.5 328-1-02.06 328 PSE
'37087A 1.5 328-1-02.07 328 PS 37087A 1.5 328-1 02.00 320 PSE 37087A 1.5 328-1-02.09 328 PS 37087A 1.5 320 1-02.10 328 8
5.25X5.25X15 37087A 1.5 328 1-02.11 328 BS 3.75X3.75X14.5 37087A 1.5 328-1 02.12 328 PS 37007A 1.5 328-1-02.13 320 BS 2.25X5.5X10 37087A 1.5 328 1-02.14 328 DS 3.5X11.75X23,75 37087A 1.5 328-1-03.01 328 PSE 37074A 1.5 328-1-03.02 328 PS 37074A 1.5 328-1-03.03 320 PSE 37074A 1.5 320-1-03.04 3;*
PS 37014A 1.5 328-1-03.05 328 PSE 37074A 1.5 328-1-03.06 328 f8 37074A 1.5 328-1-03.07, 328 PSE 37074A 1.5 328-1-03.04 328 PS 37074A 1.5 328-1-03.09 328 B
4.5X7.5X10 37076A 1.5 328-1-03.10 318 PS 37074A 1.5 328-1-03.11 328 B
5X5X14.5 37074A 1.5 328-1-03.12 328 BS 4X4XS 37074A 1.5' 328-1-03.13 328 PSS 28.75 LENGTH 37074A 1.5 328-1-03.14 328 BS 4X12X13 37074A 1.5 320-1 03.15 328 PSS 28.75 LENGTH 37074A 1.5 328-1-03.16 328 BS 5X7.5X8 37074A 1.5 328-1-04.01 328 PG 370748 1.5 328-1-04.02 328 BS 37074B 1.5 320-1-04.03 328 PSS 29 LENGTH 37074B 1.5
.~
Y
,Page No'.
11 05/23/95-
- Thermo-Lag 330-1 Fire Barrier Segmente
- c i
BABRIER ID:
ROOM'
'SEG,, TYPE BOX,SIEE BACBMAY -
. 8133 -
t
.328-1-04.04 328.
' 370748
- 1. 5 '.
324 1-04.05 -
.328' BS 51617 37074B 1.5
~328-1-04.06 328 '
PS 370745 1' 5;
- -328-1-04.07'
'320 PS -
"370748.
1.5 328 1 04.08
' 328 8
6X6X8 370748s 1.5 328-1-04.09 328
' PS 370f48.-
fi.5
- 3..
320 1-04.10-
.320 BS '
2X12X12 -
370748-1.5 328 1-04.11 328 BS
'3X11122 370748-1.5 320-1-04.12
'320' BS 2112X12 370743
-1.5-328 1 04.13 328f PS 370748
- 1. 5 _
.g --
l 328-1-04.14 328 PS 370748-
- 1. 5 -
320-1 04.15 320 BS 3X6.5X18 1370745 1.5 328 1-04.16 328 8
7.5X16.25X17.5 c37074B-
'1.5 328 1 04.18' 328 PSN 123.25 LENGTH 370745-1.5 328-1 04.19 328 PSN -
5 LENGTH 370748 -
1.5 328-1 04.20 328-PSN -
16.5 LENGTH 370745 1.5-328-1-04.21 328
' PS
,370745
- 1. 5 '
320-1-06.01 328 PS 37074C -
1.5 328-1-06.02.
328-BS 4X4.5X7.5 -
37074C.
Lt.5l 328-1-06.03 328 B
5X5X10.5-37074C'
' 1. 5
.328-1 4).01 320 '
PS -
'37074D6
- 1. 5 r
.328 1-0i.02 328 PSE 37h'74D 1.5 328-1-07.03 328 -
PS 37074D -
- 1. 5 328 1 07.04 320 BS 8.5X9.5X10
'37074D.
1.5 328-1 07.05 328 BS.
5X8.5X24-37074D-1.5?
I 328-1-07.06 328 PS 37074D
- 1. 5 :
.328-1-07.07 328 PEN 9a & 9a LENGTHS 37074D 1.5'
?
.328-1 07.08.
328 PS 37074D -
'1.5 7
328*1-09.01 328
' PS 37074E
.75 328-1 09.02 328 PSE 37074E
.75 328-1-09.03 328-BS 4.5X5X6 370745
~.75 '
328-1-09.04 328 PSN 5 LENGTH 37074E
.75
,'l 328 1-09.05 328 PS 370743
.75 328 1-09.06 328 PS 370745
.75
)
328 1-09.07 328 PS 37074E
.75 328-1-09.00 328 PSE 37074E
'. 7 5 328 1-09.09 328
- BS 2X2.5X7.5 37074E
.75.
I 328-1 09.10 328 8
4X618.5 370745 75' 320 1-09.11 328 PS 37074E
.75 320 1-09.12
'328 BS 4X5.75X13 370745-
.75 328 1-09.13 328 PSE 370748-
.75 I
328-1-09.14 328 PS 37074E
.75 328-1-09.15 328 PSE 37074E
.75 328 1-09.16 328 PS 37074E
.75 328-1 09.17 328 8
4.75X5.5X23 370745
.75 328 1-09.18 328
.B 3X3114.5 37074E
.75' 328-1-11.01 328 PS 37495C 1.5 328-1-11.02 320 PSE 37495C
- 1. 5 -
'328-1-11.03 328 PS 37495C 1.5 i
1
Page No.
12 05/23/95
- Thermo-Lag 330-1 Fire Barrier Segments ***-
BARRIER ID ROOM SEQ TYPE BOX, SIZE RACEWAY SIZE-328-1-11.08 328 PS 6 IJ2Krn{
37495C 1.5 328 1-11.11 320 PS 6 LENGTH 37495C-1.5 328-1-11.12 328 PSE 07495C 1.5 328-1-11.13 328 PS 37495C 1.5 328-1-11.14 328 8
5.75X16X123.75 37495C 1.5 328-1-11.15 328 B
EX13X13 37495C 1.5 328-1-11.16 328 8
6.75X11.5X15.5 37495C 1.5 324-1-11.17 328 B
6X11.5239.5 37495C 1.5 328 1-11.18 328 8
7X12.25116 37495C 1.5 328-1-11.19 328 8
7.25X30.5114 37495C 1.5 328-1-12.01 328 PSE 37495D
.75 328-1-12.02 328 PS 5 LENGTH
.374950
.75 328 1-13.01 328 PS 374930 1.5 328-1-13.02 328 PS 37493D 1.5 328-1 13.03 328 PSE 37493D 1.5 328-1-13.04 328 PS 374930 1.5 328-1-14.01 328 8
626.5X12 37493E 1.5 328-1 14.02 328 PS 374938 1.5 328-1-14.03 328 BS 3.25X6.25X18.5 374935 1.5 328-1-14.04 328 BS 5X6.5X8.25 37493E 1.5 328-1-14.05 328 BS 3.25X6.25X18.5 374938 1.5 328-1-14.06 328 BS 3.25X6.25X18.5 374935 1.5 328 1-14.07 328 PSE 37493E 1.5 328-1-14.08 328 PS 374935 1.5 328-1-14.09 328 BS 3.25X5X70 37493E 1.5 328-1 14.10 328 BS 3.25X5X70 37493E 1.5 328-1-14.11 323 BS 3.25X6X15 374938 1.5 328-1-14.12 328 es 3.25X6X15 37493E 1.5 328-1-14.13 328 BS 6X9.5X10 37493E 1.5 328-1-14.14 328 BS 3X3X3 374938 1.5 328-1-14.15 328 PS S LENGTH 374938 1.5 328-1-14.16 328 BS 6X9.75X10 374938 1.5 328 1-14.17 328 BS 3.25X3.25X64 37493E 1.5 328-1-14.18 324 PSE 37493E 1.5 328-1-14.19 328 PS 37493E-1.5 328 1-14.20 328 PSN 16 LENGTH 374938 1.5 328-1-14.21 328 PSN 16 LENGTH 374935 1.5
(
328-1-15.01 328 PS 37591A 1.5 l
328-1-15.02 328 B
4.25X4.25X9 37591A 1.5 l
328-1-15.03 328 PSE 37591A 1.5 j
328-1-15.04 328 PS 37591A 1.5 328-1-15.05 328 BS 6X6X92 37591A 1.5 328 1-15.06 328 BS 3.5X6.5X31.25 37591A 1.5 328-1-15.07 328 BS 6.5X25,25X27 37591A 1.5 328-1-15.08 328 PSS 2812DIA.
37591A 1.5 328-1-15.09 328 BS 2.75X6X6.5 37591A 1.5 320-1-15.10 328 BS 2x2.5X28 37591A 1.5 328-1-15.11 328 BS 213.5X24 37591A 1.5 328 1-15.12 328 BS 3.25X3.5X12 37591A 1.5
Page No.
13 05/23/95
- Thermo-Lag 330-1 Fire Barrier Segments ***
BARRIER ID ROOM SEG TYPE BOX,SIXE RACEWAY SIXE 328-1-15.13 328 BS 3.25X3.5X12 37591A 1.5 328-1-15.14 328 BS 3.5X5.5X14.25 37591A
- 1. 5 -
328-1-15.15 320 BS 3.5X6.5X31.25 37591A -
1.5 328-1 15.16 328 BS 1.25X16X16 37591A 1.5 328-1-15.17 328 BS 6.75X6.75X38.75 37591A_
1.5 328-1-15.18 328 BS 6.5X16X16 37591A 1.5 328-1-15.19 328 PSE 37591A 1.5 328-1-15.20 328 PS 37591A 1.5 328-1-15.21 328 PSE 37591A' 1.5 328-1-15.22 328 PS SEE COMMENTS 37591A 1.5 328-1-15.23 328 PS 37591A 1.5 328-1-15.24 328 PS 37591A 1.5 328 1-15.25 328 PS 6 LENGTH 37591A 1.5 328-1-15.26 328 PS 6 LENGTH 37591A 1.5 328-1-15.27 328' PSN 16 LENGTH 37591A 1.5 328-1-15.28 328 PSN 16 LENGTH 37591A 1.5 329-1 15.29 328 PSN 16 LENGTH 37591A
.1. 5 328-1-15.30 328 PSN 6 LENGTH 37591A 1.5 328-1-15.31 328 PSN 14 LENGTH 37591A 1.5 328-1-15.32 328 PSN 14 LENGTH 37591A 1.5 328-1-15.33 328 PSNE 10 LENGTH 37591A
'1.5 328-1 15.34 328 PS 6 LENGTH 37591A 1.5 328-1-15.35 328 PS 6 LENGTH 37591A 1.5 328-1-15.36 328 PS 5.5 LENGTH 37591A 1.5 328-1-16.01 328 8
8.5X21X30 JB3721 328-1-16.02 324 B
6X6.5X11 JB3721 328-1-16.03 328 BS 3.5X4.75X31 JB3721-328-1-16.04 328 BS 3.5X6.25X54 JB3721 328 1 16.05 328 BS 3.5X6.25X54 JB3721 328-1-16.06 328 BS 3.5X6.25X26.5 JB3721 328-1-16.07 328 BS 3.5X6.25X26.5 JB3721 328-1-16.08 328 PSN 9 LENGTH JB3721 328-1-16.09 328 PEN 9 LENGTH JB3721 328-1-16.10 328 B
13.75X19X26.5 JB3721 328-1-17.01 328 PS 37499C 1.5 328-1 17.02 328 PSE 37499C 1.5 328-1-17.03 328 PSE 37499C 1.5 328-1 17.04 328 PS 37499C 1.5 328-1-17.05 328 BS 4.2516X22.5 37499C 1.5 328-1-17.06 328 FS 37499C 1.5 328-1-17.07 328 B
4.75X5.25X9.75 37499C 1.5 328-1-17.08 328 PS 4.75 LENGTH 37499C 1.5 328-1-17.09 328 B
5.25X6.5X12 37499C 1.5 328-1-18.01 328 PS 374998 1.5 328-1-18.02 328 PSE 37499B 1.5 328-1-10.03 328 PS
$ IENGTH 374998 1.5 328-1-18.04 328 PS 374998 1.5 328-1-18.05 328 BS 3.5X5X7.5 37499B 1.5 328-1-18.06 324 PSS 27 LENGTH 374999 1.5
1
)
Page No.
14 05/23/95
- Thermo-Lag 330-1 Fire Barrier Segments ***
1 BARRIER ID ROOM SEO TYPE BOX SIZE RACEWAY 8128 328-1-18.07 328 PSE 374998 1.5 328-1 18.08 328 PS 37499B 1.5 328-1-18.09 328 PS ELIPTICAL 374998 1.5 328-1-19.01 328 PS 37469C 2
328-1-19.02 328 PS 37469C 2
328-1-19.03 328 PS 37469C 2
)
320-1-19.04 328 8
8X5X12 37469C 2
1 328-1-19.05 328 PS 37469C 2
328-1-19.06 328 BS 4X4.5X16 37469C 2
328-1-19.07 328 9
5.5X5.5X12 37469C 2
328-1-19.00 328 PS 37469C 2
328-1-19.09 328 BS 3.5X5XS 37469C 2
328-1-19.10 328 BS 3.513.5110.5 37469C 2
328-1-20.01 328 PS 37047C 1.5 328-1-20.02 328 PSE 37047C 1.5 328-1-20.03 328 BS 5.75X9X25 37047C 1.5 328-1-20.04 328 PS 37047C 1.5 328-1-20.05 328 BS/PS 4.25X8.5X13.5 37047C 1.5 328-1-20.06 328 BS 5.75X8.5X14 37047C 1.5 328-1-20.07 328 B
4.5X6X8.5 3704?e 1.5 j
328-1-20.08 328 PS 37047C 1.5 i
328-1-21.01 328 PSE 37047B 1
328-1-21.02 328 PS 37047B 1
328-1-21.03 328 PSE 37047B 1
328-1 21.04 328 8
5.25X5.5X8,25 37047B 1
328-1-21.05 328 B
'5.25X8.25X13 37047B 1
328-1-21.06 328 PS 370478 1
328-1-21.08 328 PSE 37047B 1.
)
328-1-21.09 328
'PS 37047B 1
328-1-21.10 328 B
3.5X619 37047B
~1
)
328-1-21.11 328 PS 370478 1
328-1-21.12 328 PS 370478 1
328-1 21.13 328 PS 37047B 1
328-1-23.01 328 PS 37590A 2
328-1-23.02 328 PSE 31s90A 2
328 1-23.04 328 PS 3.5 DLAM/6.25 L 37590A 2
328-1-23.05 328 PS 37590A 2
328-1*23.06 328-BS 6X7.75X13.5 37590A 2
328-1-23.07 328 BS 2.25X11.5X37 37590A
'2 328-1-23.08 328 BS 3.25X8.75X11.5 37590A 2
328-1 23.09 328 PSE 37590A 2
328-1-23.10 328 PS 5 LENGTH 37590A 2
328-1-23.11 328 B
5X5.5X9 37590A 2
328-1-23.12 328
'PS 37590A 2
328-1-23.13 328 BS 2.5X3.5X11 37590A 2
328-1-23.14 328 BS 2.5X5.25X19 37590A 2
328-1-23.15 320 BS 5.5X5.75X10.75 37590A 2
328-1-23.16 328 BS 2.5X3.5X10 37590A 2
328-1-23,17 328 PS ELIPTICAL 37590A 2
~
'l i-
- Page No.
15 05/23/95 -
l-
- Thermo-Lag 3301 Fire Barrier Segments ***
l-
' BARRIER 'D ROOM SEG_ TYPE BOX, SIZE RACEWAh.
SIEE -
I I
i 328-1-23.18 328
- PSE
-BLIPTICAL 37590A-2 1
328-1-23.19 328-PS '
PS 37590A 2-328 1-23.20 328-58 4X6.5X14.5 -
'37590A-2
- 328 1-23.21 328 PS -
37590A 2.
328 1-23.22 328 BS 4X6.5X12' 37590A 2
328-1 23.23 328 PS :
37590A 2
328-1 23.24 328 BS/PS 3.25X6.5X14.5.
37590A 2-328-1-23.25 328'
~ PSE.
.37590Ai
-2 328-1-23.26
.328 '
PS
.37590A'-
2, 328-1 23.27' 328 PSN 18 LENGTH 37590A-2.
328+1-23.28 328 PSE 37590A -
.2
.320-1-23.29 328 PSN
.12 LENGTH 37590A --
2 328 1-23.30 328 :
PSN 19 LENGTH
'37590A-
~2 328 1-23.31 328 -
PSN 7.25 LENGTH 37590A
~2 328 1-24.01 328 BS 3.5X15X15
. JB3715 328-1-24.02 328 BS
-5X5X14
'JB3715 -
328 1-24.03 328 B
16X19X20 JB3715 l
328-1 24.04 328 8
16X17X51.5 JB3715 l~
~ 328
.B
.11.75X15.25X59,5 JT3710' 328-1-25.01 328-1 25.02 328-
'B 15X18.5X20 JT3718 320-1-25.03 328 BS.
5X5X11.5 JT3718'-
328-1-25.04 328 BS 8X16.75X16.75' JT3718 l,
328-1-26.01 328 PS 36110C 2
328 1-26.02
.328 PSE 361100.
2 328-1-26.03 328 PS -
36110C' 2
328-1 26.04
' 328 BS 5.25X629.5 36110C ~
2 i
.328 1-26.05 328 B
5.5X5.5X35 36110C;
!2 328 1-27.01 328 B-4.5X8.5X62 37448A-1 328 1-27.02 328 PSE 37448A-1 328 1 27.03 328 BS 3.5X6X9.25 17448A 1
320 1 27.04 328 PS 37448A 1
I 328 1-27.05 328 B
4.5X4.5X8-37440A 1
328 1-27.06 328 PS
~37448A 1
328 1-27.07 328 BS 5.5X6X7.75
.37448A.
1-328 1 27.08 328 PSE 37448A 1
328-1-27.09 328 PS 37448A 1
328 1-27.10 328 BS 3.5X4.75X7.75 37448A 1
i 328-1-27.11 328 B
3.75X4.25X9,5 37448A 1-328-1-27.12 328 B
2.513.25X5 37448A' 1
328-1-27.13:
328 8
6.5X6.75X8.5 37440A 1
328 1-28.01 328 PS 37073A
- 1. 5 '
328-1-28.02 328 PSE 37073A 1.5 328-1-28.03 328 PS 37073A 1.5 l
328-1-28.04 328 BS 3.25X3.25X7.25 37073A ~
1.5 328-1-28,05 328 BS 3.25X3.25X7.25 37073A
'1.5 i
328-1-28.04 328 PS 37073A 1.5 328-1-28.07 328 B
5.5X8X20 37073A 1.5 328 1-28.08 320 PSE 37073A
'1.5 320-1-29.01 328 PS 370739 1.5
.i l'
_m.-
m.
. ~ ~ _,.
+
P t
Page No[ l16
- 05/23/95
- Thermo Lag 330 1 Pire Barrier Segments ***
BARRIER 1D-ROOM-SEG_ TYPE BOX _SIXB-RACEWAY SIXE
,328-1-29.02 324 PSE 37073B' 1.5 328-1-29.03 328
- PS 370138
-1.5 s 328-1-29.04 328 BS 3X5.25X7.25 370738 ~
1.5' 328-1-29.05
-328 PS 370738 1.5 328-1 29.06 320 B
SX14X15 370738-
- 1. 5.
328-1 29.07 328 BS 3.25X5X13 137073B 1.5
^
328 1-29.04 328 BS 2.25X3X11.5 370738 1.5 328-1 29.09 328-
. BS
. 4X8.25X11 370739 1.5
'f 328-1 30.01-
. 328 PS 37073C' 1.5
- 328 1 30.02 328 PS'
-37073C
$ 1.5 328-1-30.03 328 BS.
2.75X13X21,75
'37073C 1.5-328-1-30.04 328' BS 4.5X8.25X13.25 37073C 1.5 328-1-30.05 328 9
525.25X13.5 -
37073C.
1.5
- 328-1-30.06 324 PS 37073C
- 1. 5 -
328-1 30.07 328 BS -
5X7.75X16' 37073C-1'. 5 328-1 30.08 328 PS 37073C-
- 1. 5 :
'328-1-30.09 320 PS 37073C I
~
- 1. 5 -
4 328-1-30.10 328 PSE
.37073C l 1. 5 328 1-30.11
-328 PS
-37073C 1.5 328-1-30.12 328
' PSB.-
37073C ---
' 1. 5 328-1 30.13-328 PS
-37073C-1.5 328 1 30.14 320 BS 3.5X7X8 37073C 1.5 328-1-30.15 328.
~PS 11 LENGTH 37073C 1.5.
328-1 30.16
- 328 _
PS 37073C 1.5 328 1-31.01-328 PS 37073D.
1.5
]
328-1 32.01 328 PS 37073E
.75 l
328-1-32.02 320 BS 3.75X7X7.5 37073E' 75 M
328 1-32.03-328 PSE 37073E -
'.75 328-1-32.04 328 BS 1.75X8X9.75
-370735
.75 328 1 32.05 328 B
3X5.75X21.5 370735
.75 328 1-32.06 -
328 BS 3X5X7.25 370738:
.75 328-1-32.07 328 PS 37073E
.75-
--328-1 32.08 328-B 5.515.5X8.5 370738
. 7 5 --
328-1 32.09 328 PS 37073E 15 328 1-32.10 328 BS 4X4.5X14 370735
.75 328-1 32.11 328
- BS 3.25X4.75X14 370735
,75-328-1-33.12' 328 BS 3X3.75X10 370735
.75 328 1-32,13 328 TG 3X7X9-370738
.75 320-1-32.14 328 BS 3X3.25X4 370735.
.75 328-1-32.15 328 PSE 370735
.75 320-1 32.16-324 PS.
370735
.75 328-1-32.17 328 BS 3.25X3.5X8 370735
.75-328-1-32.18 328 BS 5X5X14.5 370735
.75 -
328-1-32.19 328 PS 37073E
.75 '
328-1 32.20 328 PS 37073E'
.75 -
328-1 32.21 328 PSN 18 LENGTH 37073E
.75 328 1 32.22 328
-PSE 37073E
.75 328 1-32.23-328 PS 37073E
.75 328-1 32.24 328 BS.
3X5X12 -
370735
.75
f.
I l'
Page No.
17
(
- 05/23/95 j
- Thermo-Lag 330-1 Fire Barrier Segments * **
I 1
}
BARRIER ID.
ROOM -
SEG TYPE BOX, SIZE -
- RACBWAY SIZE 1
1
'i r
I j
320-1 32.J5 328 BS 2X9.5113.75-370735
.75 i f
328 1-32.26 328 L PSN 3 LENGTH 37073E
.75 '
328-1-32.27 328 PS 3M73R
.75 I
328 1 34.01!
328
'PS
-37440A
'.75.
328-1 34.02 328 PSE
-37440A-
,.75'
.j l-328-1-34.03 328 PS '
'37440Al
.75; I
328-1-34.04 328 BS 2.5X'12X12 37440A
'. 75 '
328 1-34.05-328 BS 3.25X7.5X17 37440A'
.75-
.328 1-34.06 328-BS 3.5X9.5114, 37440A:
.75 j
328-1-34.07.
328
- BS 3.25X5X65.5' 37440A-
'. 7 5 '
328 1-34.08' 328 BS -
4X9.519.5 37440A" 75 -
l
- 328 1-34.09~
328; BS
,8X11116 37440A 75 328-1-34.10 328 :
. BS.
3.25X7.5X17:
37440A -
.75 '
.]'
328-1-34.11 328 BS 2.75X12X12-37440A
.75 328-1-34.12 328 BS 3.2515X18 37440A
.75
- 328-1-34.13
.328 BS -
3.5X8.75X13.25 37440A 75
- 328 1-34.14 328
'BS 3.5X5X71.25 37440A
. 7 5.l.
320-1-34.15-328 BS' SX11X16 37440AL
.75 328-1-34.16 328 BS 7X4X6
- 37440A,
.75 l
328 1-34.17 328 -
PSS M LENGTH
. 37440A
.75 I
~
328-1-34.18 328 PS -
37440A
.75 328-1-34.19 328 PSE 37440A'
.75 328-1-34.20 328 BS 3.7515X9.5 37440A-
.75 j
328-1-34.21 328 BS 1.7518.75X14 37440A
.75-328-1-34.22 328 PS
'37440A
.75 -
1 328-1-34.23 328 PB 6 LENGTH
.37440A
.75-328-1-34.24 328 PS 37440A
.75
.328-1-34.25 328 FB 6 LENGTH 37440A
.75 328-1-34.26 320 PSN 13 LENGTH
'37440A -
'h 328-1 34.27 328
, PSN 18 LENGTH 37440A'
.75 h
328-1-34.28 328 PSN 6 LENGTH 37440A
.75 328-1-34.29 328 PSN 20.75 LENGTH 37440A.
'. 7 5 7
328-1-34.30 328 PSN.
18 LENGTH 37440A
.75.
l 328 1-36.01 328-N/A SEE COP 9GDrTS 37444A -
1:
d 328-1-37.01 328 PS 37481A 2'
328-1-37.02 328 88 3.5X7X14 37481A
-2 328-1-37.03 328 PS 37481A 2
i i
328-1-37.04 328 BS
.4X7X14 37481A 2'
328-1-37.05 328 PSE 37481A 2
.328-1 37.07 328 PS.
37481A 2
328-1-37.09
'320 PSE 37481A 2
328-1-37.10 320 PS '
37481A.
2 328-1-37d1-328 PSE 37481A-2
(
328-1-38.01 328 PSE 36010C 2
328-1-38.02 328 PS 36010C 2
l-328-1-38.03 328 PSE 36010C 2
328-1-34.04 328 BS 4X6110 36010C 2
328-1-38.05 328 PS 36010C 2
j 328-1-38.06 328 BS 3.25X3.25X13.5 36010C 2
+4
Page No.
18 05/23/95
- Thermo-ug 330-1 Fire Barrier Segments ***
BARRIER ID ROOM SEG_TYPB BOX _ SIZE RACEWAY SIZE 1
328-1-38.07 328 DS 6X13.5X15 36010C 2
328-1-38.08 328 PS 36010C
.2 328-1-38.09 328 B3 3.25X3.25X13.5 36010C 2
328-1-38.10 328 BS 3.25X3.25X13.5 36010C 2
328-1-38.11 328 BS 3.25X3.25X14 36010C 2-328-1-38.12 328 B
5X13.25X14 36010C 2
328-1-38.13 328 PS 36010C 2
328-1-38.14 328 BS 4X4.25X4.25 36010C 2
328-1-38.15 328 PSE
.36010C 2-328-1-38.16 328 PS 36010C 2
328-1-38.17 328 BS 3.75X6X13.5 36010C 2
320-1-38.18 320 PSE 36010C 2.
328-1-38.19 328 PS 36010C 2
328-1-38.20 328 BS 3.25X6.5X7.25 36010C 2
328-1-38.21 328 PS 36010C 2
328-1-38.22 328 8
5.25X5.25X26 36010C 2
328-1-38.23 328 PS 36010C 2
328-3-05.01 328 BS 8X13X25 FIS1422D 328-3+05.02 328 B
3X12.5X19 FIS1422D 320-3-05.03 328 B
8X12.5X13 FIS1422D 328-3-05.04 328 PS FIS1422D 328-3-08.01 328 BS 7X818 FIS1427D 328-3-08.02 328 BS 7.25X11.5X12 FIS1427D 328-3-08.03 328 BS 7.5X7.75X10.75 FIS1427D 328 3-08.04 328 B
11.5X14.5115.5 FIS1427D 328-3-08.05 328 BS 4.5X7.5X7.5 FIS1427D 328-3-08.06 328 BS 6.5X7.5X17.5 FIS1427D 328-3-08.07 328 PSN 9 LENGTH FIS1427D 328-3-08.08 328 PS 10.75 LENGTH F141427D 328-3-08.09 328 BS 3X3.25X12 FIS1427D l
318-3-08.10 328 8
10X11.5112 FIS1427D 328-3-10.01 328 PSN 8 LENGTH FIS1432D
)
328-3-10.02 328 BS 2.75X7X36.5 FIS1432D 328-3-10.03 328 BS 2X12.75124.5 FIS1432D 328-3-10.04 320 BS 7X7.75X11.5 FIS1432D 1
328 3-10.05 328 B
11.75X12.75X18 FIS14320 328-3-10.06 328 B
9X14X18 FIS1432D 328-3-10.08 328 BS 8X12X17.5 FIS1432D 328-3-10.09 328 8
3X3X11.75 FIS1432D j
328 3-22.01 328 BS 7X9.5X17 FIS1427C 328-3-22.02 328 BS 7.25X7.75X14.75 FIS1427C 328-3-22.03 328 BS 4.75X5.25K36 FIS1427C 328-3-22.04 328 BS 5.75X13.5X21.25 FIS1427C 328-3-22.05 328 BS 10X10.5224 FIS1421C 328-3-22.06 328 BS 6X7.5X7.75 FIS1427C 328-3-22.01 328 '
B 5.25X12X15.75 FIS1427C 3"8-3-22.08 328 B
7.5X7.75X10.75 FIS1427C 328-3-22.09 328 B
6.5X8.75X10.5 FIS1427C 328-3-22.10 328 PS FIS1427C
r h.
Page No.
19
]
05/23/95 i
- Thermo-Lag 330-1 Fire Barrier Segments ***
BARRIER ID ROOM SEG TYPE BOX,, SIZE RACEWAY SIZE 328-3-33.01 328 B
2.5X3X12 FIS143?C 328-3-33.02 328 8
7X8X12.5 FIS1432C 328-3-33.03 328 B
2.5X3X12 FIS1432C 328-3 33.04 328 B
12X12.5X20 FIS1432C 328-3-33.05 328 8
7.25X12.5X16 FIS1432C 328-3-33.06 328 B
9X13X15 FIS1132C 329-3-33.07 328 PSN 11 LENGTH FIS1432C 328-3-35.01 328 8
8X11X1?
FIS1422C 328-3-35.02 328 8
3X3X11 FIS1422C 328-3-35.03 328 8
7X12X23.5 FIS1422C 328-3-35.04 328 B
3X3111 FIS1422C 328-3-35.05 328 B
315X8.5 FIS1422C 328-3-35.06 328 B
2.5X3X11 FIS1422C 328-3-35.07 328 PS 20 LENGTH F181422C 331-3-01.01 331 B
17.5X52265 FD-1126 331-3-01.02 331 B
2.5X4.5X60 FD-1126 331-3 01.03 331 8
2.5X2.5X2.5 FD-1126 400-3-01.01 400 BS N/A STEEL 401-3-01.01 401 BS N/A STEEL 404 3-01.01 404 BS N/A STEEL 410.5-01.01 410 B
21X39X42 P3P4CI 410.5-01.02 410 B
5X5.5X10.5 P3P4CI 410. 5-02.01 410 PS 39019A 3
410.5-03.01 410 PS 39020A 3
427-1-01.01 427 B
14.75X43.25X46 P3P4CX 427-1 01.02 427 8
5.25X16.25 46071C 3
427-1-01.03 427 BS 2.25X14X27 46071C 3
427-1-01.04 427 BS 4.5XS.25X17.5 46071C 3
427-1-01.05 427 FB 460719 3
427-1-01.06 427 FB 460698 3
427-1-01.07 427 FB 46070B 3
427-1-01.08 427 B
17X22X24.5 JB4670 428-3-01.01 428 B
5X22X51 STEEL 431 3-01.01 431 B.
8X31X31.5 FD-1178 431-3-01.02 431 B
12.5X35X35 FD-1178 504-3-01.01 504 B
6X14X32 FD-1024 504-3-01.02 504 B
6X10X15 FD-1024 507-1-01.01 507 B
4X13.75X19 FD-1023 507-3-01.02 507 B
10,5X14X29 FD-1023 509-3-01.01 509 B
2.5X24X24 FD-1022 509-3-01.02 509 8
4X10X16.5 FD-1022