Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML25282A060 + (October 9, 2025)
- ML25287A014 + (October 9, 2025)
- ML25287A013 + (October 9, 2025)
- ML25342A441 + (October 9, 2025)
- ML26029A334 + (October 9, 2025)
- LG-25-132, License Amendment and Alternative Request Related to One-Time Exception of Primary Containment Isolation Valve Testing + (October 9, 2025)
- NL-25-0390, Proposed Inservice Inspection Alternative FNP-ISI-ALT-2025-10 for Containment Unbonded Post-Tensioning System Inservice Inspection Requirements in Accordance with 10 CFR 50.55a(z)(1) Response to Request for Additional Info + (October 9, 2025)
- RA-24-0273, License Amendment Request to Revise Technical Specifications to Use Online Monitoring Methodology + (October 9, 2025)
- ULNRC-06977, Presentation Information for Pre-Application Meeting Regarding Transition to Advanced Westinghouse Fuel and Upgrade of Analytical Methods at Callaway Plant + (October 9, 2025)
- 05000346/LER-2025-002, Cooldown to Mode 4 Not Completed in Required Time Due to Improper Procedure Routing + (October 9, 2025)
- 05000346/LER-2025-001, Required Shutdown for Steam Generator Low Level Instrumentation Reference Leg Steam Leak + (October 9, 2025)
- L-2025-162, Periodic Update of the Updated Final Safety Analysis Report, Chapter 12, General + (October 9, 2025)
- PMNS20251162, Teams Call with TRISO-X, Llc. (TRISO-X) to Discuss Draft Responses to the Management Measures and Quality Assurance Request for Additional Information (RAI) Supplements + (October 10, 2025)
- RA25-049, Post Examination Submittal Letter (LAS 2025) + (October 10, 2025)
- ML25318A251 + (October 10, 2025)
- ML25311A098 + (October 10, 2025)
- ML25283A067 + (October 10, 2025)
- ML25283A049 + (October 10, 2025)
- ML25283A048 + (October 10, 2025)
- ML25283A046 + (October 10, 2025)
- ML25283A052 + (October 10, 2025)
- ML25283A053 + (October 10, 2025)
- LR-N25-0083, Supplement to License Amendment Requests to Adopt TSTF-505, TSTF-591, and 10 CFR 50.69 + (October 10, 2025)
- 05000282/LER-2025-002, Control Room Chiller Inoperable Due to Purge System Failure + (October 10, 2025)
- ML26035A417 + (October 10, 2025)
- ML25317A675 + (October 11, 2025)
- ML25318A252 + (October 12, 2025)
- ML25253A442 + (October 13, 2025)
- ML25338A064 + (October 13, 2025)
- ML25330A132 + (October 13, 2025)
- ML25330A065 + (October 13, 2025)
- ML26027A172 + (October 13, 2025)
- ML25290A149 + (October 13, 2025)
- ML25290A144 + (October 13, 2025)
- ML25290A143 + (October 13, 2025)
- ML25290A154 + (October 13, 2025)
- ML25290A133 + (October 13, 2025)
- ML25290A137 + (October 13, 2025)
- ML25290A139 + (October 13, 2025)
- ML25290A135 + (October 13, 2025)
- ML25290A151 + (October 13, 2025)
- ML25290A150 + (October 13, 2025)
- ML25290A152 + (October 13, 2025)
- ML25290A148 + (October 13, 2025)
- ML25290A122 + (October 13, 2025)
- ML25290A125 + (October 13, 2025)
- ML25290A114 + (October 13, 2025)
- ML25290A138 + (October 13, 2025)
- ML25290A145 + (October 13, 2025)
- ML25290A115 + (October 13, 2025)
- ML25290A117 + (October 13, 2025)