Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000440/LER-2017-001 +
- ML17325B631 +
- 05000272/LER-1989-019-01, :on 890520,both Loops of RHR Sys Were Declared Inoperable Due to Gas Binding of RHR Pumps.Caused by Personnel Error.Use of Test Procedure Discontinued Until Completion of Review.Procedure Revised +
- ML20027A590 +
- ML20039D999 +
- ML043140297 +
- ML20077S219 +
- ML20128A153 +
- ML20206F884 +
- 05000311/LER-1982-114, Forwards LER 82-114/03L-0.Detailed Event Analysis Encl +
- ML20212N873 +
- ML20237K211 +
- ML20236Y616 +
- ML20236Y611 +
- BVY-98-154, Monthly Operating Rept for Oct 1998 for Vermont Yankee Nuclear Power Station.With +
- ML24194A014 +
- ML24012A205 +
- 05000301/LER-1987-005, :on 871120,control Rod C7 Discovered to Be Out of Alignment.Caused by Blown Fuse.Quadrant Flux Tilt Verified & Found Acceptable.Fuse Replaced +
- 05000423/LER-1986-059, :on 861227,plant Equipment Operator Discovered Three Unsealed Penetrations in Auxiliary Bldg Wall.Caused by Failure to Identify Items During as-built Walkdown.Visual Exam Conducted of All Wall Areas +
- 05000395/LER-1993-001, :on 930112,reactor Tripped from 100% Power on Positive Flux Rate on All Four power-range Channels.Caused by Spurious Actuation of Generator Backup Auxiliary Time Delay Relay.Relay Calibr Checked +
- 05000311/LER-1982-114-03, /03L-0:on 820927,RMS Apd Filter Drive Unit Malfunctioned.Caused by Slipped Pin Attaching Solenoid Arm to Ratchet Cog.Pin Installed Through Bottom Instead of Top of Connecting Sleeve.Pin Reinstalled Correctly +
- 05000301/LER-1978-009-03, /03L-0 on 780913:on 2 occasions,2 of 3 Charging Pumps Were isolated.2 3/4 Crosby Relief Valves Leaked Through Causing Temporary Loss of Charging Flow.Charging Pump Relief Valve Replaced & a Pump Returned to Svc +
- 05000293/LER-1993-007-01, :on 930317,automatic Closing of RCIC Sys Turbine Steam Supply Isolation Valves Occurred Due to High Steam Flow Signal.Increased Frequency of Valve Testing from Monthly to Weekly +
- 05000293/LER-1993-007, :on 930317,automatic PCIS Group 5 Actuation Occurred While Attempting to Place RCIC Sys in Standby Svc. Root Cause of Event Unknown.Suppl to LER Will Be Submitted Following Completion of Investigation +
- 05000293/LER-1991-001, :on 910125,automatic Primary Containment Isolation Control Sys Group 5 Actuation Occurred,Resulting in Closing of RCIC Turbine Steam Supply Isolation Valves. Caused by High Flow Conditions +
- ML19341A229 +
- 05000281/LER-1995-007-01, :on 951107,RT Occurred Due to Failed Rc Pump Motor.Caused by Internal Motor Stator Windings Grounded. Shift Technical Advisor Monitored Critical Safety Function Status Trees to Verify Parameters Acceptable +
- 05000440/LER-2007-003-01, Regarding Improper Containment Floor Grating Installation Results in an Unanalyzed Condition, Supplement +
- ML22299A235 +
- 05000373/LER-1989-023-01, :on 890908,reactor Recirculation Process Sample Inboard Isolation Stop Valve Spuriously Went Closed W/No Apparent Isolation Signal Present.Caused by Short in Coil of Relay 1B21H-K72.Work Request Written +
- 05000293/LER-1994-004, :on 940803,automatic Primary Containment Isolation Control Sys Actuation Occurred.Caused by Improper Alignment of Control Valve Fulcrum Alignment Pins.Vents Added to Oil Sump & Sys Oil Pressure Reduced +