Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000315/LER-2015-004, Regarding Power Operated Relief Valve Technical Specification 3.4.11 Violation +
- ML17089A617 +
- ML16336A527 +
- ML16224A106 +
- ML16034A358 +
- ML18026A248 +
- ML14321A685 +
- ML14045A156 +
- ML13338A646 +
- ML13241A414 +
- ML11178A382 +
- ML11178A378 +
- ML110890844 +
- ML18152A741 +
- WM 16-0008, Wolf Creek Generating Station Updated Safety Analysis Report (Usar), Redacted Version of Revision 29, Calculation No. XX-E-013, Rev 4, Post-Fire Safe Shutdown Analysis +
- ML18179A493 +
- ML18135A044 +
- 05000528/LER-1990-001-01, :on 900209,fuel Bldg Exhaust Ventilation high- Range Radiation Monitor Energized,Causing low-range Radiation Monitor to Spike & ESF Actuation.Caused by Noise in Circuit of Monitors.Channel B Bypassed +
- ML063070146 +
- ML061460356 +
- ML20009E901 +
- RC-16-0001, V.C. Summer, Report of Full Compliance with March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order EA-12-051) and Responses to Requests for Additional Information +
- RC-15-0125, Fifth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) +
- L-10-235, Response to Request for Additional Information for License Amendment Request No. 08-027 Re Spent Fuel Pool Rerack +
- ML19344E607 +
- ML18361A780 +
- RC-16-0143, (VCSNS) Unit 1 - Report of Full Compliance and Final Integrated Plan in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design. +
- BVY 14-065, Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order EA-12-049) and Request to Rescind Order +
- ML19106A409 +
- 0CAN011601, Notification of Full Compliance with NRC Order EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Bdbees) +
- 0CAN021302, Units 1 and 2 - Overall Integrated Plan in Response to March 12, 2012, Commission Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) +
- ML19256A844 +
- ML19343A735 +
- ML20040F576 +
- NL-04-128, September 2004 Monthly Operating Report for Indian Point Units 2 & 3 +
- ML033440214 +
- ML032180735 +
- 1CAN040302, License Amendment Request to Modify the Fuel Assembly Enrichment, the Spent Fuel Pool (SFP) Boron Concentration TS 3. 7.14, the Loading Restrictions in the SFP in TS 3,7,15m and to Modify the Fuel Storage Design Features in TS 4.3 +
- ML053070593 +
- ML030770647 +
- NL-03-143, August 2003 Monthly Operating Report for Indian Point Unit 2 +
- ML20096C831 +
- ML20095C690 +
- NRC-92-0008, Annual Operating Report for 1991 +
- ML20117M802 +
- ML20137N944 +
- ML20137G936 +
- NRC-97-0017, 1996 Annual Operating Rept for Fermi 2 +
- ML20142A363 +
- ML20134E121 +