List of results
- ML15027A424 +
- ML17318A627 +
- ML17102A999 +
- PLA-7769, Annual Radiological Environmental Operating Report (PLA-7769) +
- ML20063Q020 +
- ML042660067 +
- ML020440131 +
- ML20083L255 +
- ML20082F948 +
- ML20080T893 +
- ML20101R598 +
- ML20108D079 +
- ML20206L823 +
- IR 05000266/1989023 +
- ML20210B004 +
- B11930, Discusses Effects of Hurricane Gloria,Including Preparations for Storm & Loss of Offsite Power Events at Millstone Units 1 & 2 on 850927.Advance Notification Associated W/Severe Weather Events Permits Advance Precautionary Actions +
- ML22132A239 +
- BSEP-96-0138, Notifies NRC Staff That Plant,Completed Implementing MOV Program,Per GL 89-10 +
- NLS8500045, Forwards Addl Info Re Spds,Per 841005 Commitment.Finalized List of SPDS Parameters,Isolation Test Procedure for Fiber Optics & Description of Displays for SPDS Encl +
- ML22301A050 +
- 2CAN089012, Monthly Operating Rept for Jul 1990 for Arkansas Nuclear One - Unit 2 +
- 05000301/LER-1989-002, :on 890329,unit Experienced Main step-up Transformer Lockout Main Generator Breaker Trip & Concurrent Turbine & Reactor Trips.Caused by Wiring Error in Terminal Box 2-TB69.Repairs Completed +
- 05000219/LER-1987-022, :on 870424,plant Shut Down Because of Inoperable Electromatic Relief Valve Position Indicator. Caused by Cable Damage During Installation Phase Due to Marginal Splice Design.Failed Splice Replaced +
- 05000301/LER-1986-008, :on 861128,reactor Tripped During Beginning of Life Physics Test.Caused by Low Water Level in Steam Generator A.Event Will Be Discussed in Normal Training Cycle for Licensed Operators in Next Training Cycles +
- 05000312/LER-1988-014, :on 881025,Tech Spec Required Shutdown Due to RCS Leakage.Caused by Degradation of Two Valves Due to Svc in Rcs.Rcs Repaired by Seal Welding body-to-bonnet Joint, Then Injecting Valve W/Leak Sealant +
- 05000374/LER-1984-032-01, :on 840626,reactor Water Cleanup Sys Isolated on Spurious High Differential Temp Div 1 Leak Detection (Jm) Trip.Caused Apparently by Induced Signal While Performing RCIC Functional Test.Isolation Reset +
- 05000346/LER-1993-005, :on 931008,RT Occurred Due to CRD Trip Confirm Signal Caused by Degraded Power Supply in CRD Sys Logic Cabinet 1.Replaced Degraded Power Supply & CRD Logic Protection Circuit +
- 05000254/LER-1990-015-01, :on 900707,Tech Spec 3.0.A Entered.Caused by Inoperability of Reactor Bldg ECCS Room Drain Line Check Valves.Station Drawings Updated & Procedures Enhanced +
- 05000373/LER-1993-010-02, :on 930414,DG Cooling Water Pump Automatically Tripped on Magnetic Overload.Caused by Inexperienced Trainee in Operation of Control Lever.Lesson Plans & Training Programs for Operators to Be Reviewed +
- ML19340B434 +
- 05000250/LER-1992-005, :on 920420,two Main Steam Isolation Valves Declared Inoperable.Caused by Personnel Error.Msivs a & B Were Returned to Svc in Accordance W/Procedures as Soon as Valve Misalignment Was Identified +
- 05000315/LER-1994-007, :on 940607,determined That Rod Position Indication Greater than 12 Steps from Demand Position Indication.Caused by Failure to Follow Procedure as Written. Correct Data Used to Determine Rod Position +
- 05000220/LER-2008-001, Loss of Offsite Power Due to an Equipment Malfunction +
- 05000301/LER-2007-007, 0 for Point Beach Nuclear Plant Unit 2, One Overpower Delta T Channel Setpoint Outside Technical Specification Allowed Value +
- ML13330B542 +