- t
'Af t = nnonei4itsasa.eam,
Nudear Group
[
P O Bos 4 t
cnipp,noport eA inaw August 9, 1990 i
i Beaver Valley Power Station
'l Unit 1 - Docket No. 50-334, License No. DHt-66 l
Unit 2 - Docket No. 50-412, License No. NPF-73 Menthlv anaratim Damrt t
i f
U. S. Nuclear Regulatory % immion i
Document contrul Desk
-l Washington, D.C.
20555 l
Gentlement l
4 i
In accordance with Appendix A,
Technical Specifications, the Monthly Operating Report is subnitted for Unit 1 and Unit 2 for the month of July, j
1990.
Very truly yours, e
Vice President Nuclear Group MW/nd
[
Enclosures oc: NRC Regional Offloe l:'
King of Prussia, PA
)
l Y'
9008170016 900731
'PDR ADOCK 05000334 R
PDC s,..-
.... - - +
OPERAZING DATA REPORT DOCKET No.:
50 334 REPORT DATE:
08/07/90 COMPLETED BY: M.A.WINGER TELEPHONE:
(412) 393 7621 OPERATING STATUS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
- 2. REPORTING PERIOD: JULY 1990
- 3. LICENSED THERMAL POWER (MWt):
2652
- 4. NAMEPLATE RATING (Gross MVe):
923
- 5. DESIGN ELECTRICAL RATING (Net NWe):
835
- 6. KAX, DEPENDABLE CAPACITY (Gross MWe):
860
- 7. MAX. DEPENDABLE CAPACITY (Net MWe):
810
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, CIVE REASC.iSi
- 9. POWER LEVEL TO WHICH RESTRICTED. IF ANY (Net MWe):
None
- 10. REASONS FOR RESTRICTIONS, IF ANY:
N/A THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD:
744.0 5087.0 124919.0
- 12. NO. OF HRS. REACTOR WAS CRITICAL:
469.6 4649.9 76788.4
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 4482.8
- 14. HOURS GENERATOR WAS ON LINE:
457.4 4613.3 750B0.8
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0,0
- 16. GROSS THERMAL ENERGY GEN. (MWH):
1053499.0 11569242.0 177649297.5 i
- 17. GROSS ELECT. ENERGY GEN. (MWH):
332880.0 3770780.0 57040469.0 l
- 18. NET ELECTRICAL ENERGY GEN. (MWH):
304590.0 3541470.0 53238620.0 L
- 19. UNIT SERVICE FACTOR: (PERCENT) 61.5 90.7 62.3
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 61.5 90.7 62.3
- 22. UNIT CAPACITY FACTOR (DER): PCT 49.0 83.4 53.9
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 3.0 16.8
- 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A l
t 1
NARRATIVE SUO9JW OF 1
ICNIHLY OPERATDG EXPERIDKE l
TWIT I JULY 1990
(.
\\
July 1 The Unit operated at a 100% output with the Rod Position through Indicator for Control Rod D-12 out of service.
July 12 l
July 13 At 1700 hours0.0197 days <br />0.472 hours <br />0.00281 weeks <br />6.4685e-4 months <br /> the Unit's output was r d M to 30% to permit trouble shooting the elAh4ydraulic control system for the Main 7\\1rbine.
At 2152 hours0.0249 days <br />0.598 hours <br />0.00356 weeks <br />8.18836e-4 months <br /> the Unit's output was ramped l -
down.
At 2257 hours0.0261 days <br />0.627 hours <br />0.00373 weeks <br />8.587885e-4 months <br /> the Unit was runoved fran service to j
permit repairs to the rod position indicating system for the D-12 Control Rod.
At 2300 hours0.0266 days <br />0.639 hours <br />0.0038 weeks <br />8.7515e-4 months <br /> the Unit entered Mode 3.
l July 14 The Unit remained in Mode 3.
through e
July 15
?
July 16 At 0510 hours0.0059 days <br />0.142 hours <br />8.43254e-4 weeks <br />1.94055e-4 months <br /> the Unit entered Mode 4.
July 17 at 0100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> the Unit entered Mode 5.
July 18 The Unit remained in Mode 5.
through July 21 i
July 22 At 1905 hours0.022 days <br />0.529 hours <br />0.00315 weeks <br />7.248525e-4 months <br /> the Unit entered Mode 4.
July 23 At 0410 hours0.00475 days <br />0.114 hours <br />6.779101e-4 weeks <br />1.56005e-4 months <br /> the Unit entered Mode 3.
July 24 The Unit remained in Mode 3.
5 i
July 25 At 0921 hours0.0107 days <br />0.256 hours <br />0.00152 weeks <br />3.504405e-4 months <br /> the rector was taken critical. At 2134 hours0.0247 days <br />0.593 hours <br />0.00353 weeks <br />8.11987e-4 months <br /> the Unit was synchronized and cutput was -lated to 30%.
July 26 The Unit remained at 30% output to permit inprovements to j
through Secondary Steam Generator Water Chemistry.
July 28 July 29 At 0245 hours0.00284 days <br />0.0681 hours <br />4.050926e-4 weeks <br />9.32225e-5 months <br /> the Unit's output was escalated to a ncaninal value of 100%.
July 30 The Unit operated at a ncuninal value of.100%.
through July 31 i
t a
--e.-,
.e
.#-+. - _,. _,
- - - ~ -
-~,-,.-,.,,v-.-.
,,,---ws-
UNIT SuuTDOWNS ASD POWER REDUCTIOes Docket No.
50-334 Unit #eme EvPS Unit #1 Date - avaust T. 1990 Completed Sy a,A. Winner __.-
REPORT MONTH JULY 1990 Telephone (612) 39( ~g),
Method of Licensee Cause & Corr-Durstion Shuttins Event System Component Actioni.
me.
Date Typet (mours)
Reeson2 Down Reactor 3 Report #
Code 4
. Code 5 Prevent Reeve s
23 900701 F
0 m
9 2-90-009 IE INSTRU tod Position Indicator et Rod 0-12 toes out of ser m 24 900713 5
0 m
5 m/A nA INSTRU Poeser reduction halted et
.: stout to trouble shoot the mein TA t's Electrohydroutic Contret System.
25 900713 S
286.6 8
1 m/A (E
INSTRU Unit was shutdown to repeir the God Position Indiceter for the 9-12 Contret Rod.
26 900725 F
0 M
5 N/A WB NTENCs Unit's output meinteined at 30E to allow improvements to secondery side steen generator weter chemistry.
1 2
3 4
F-Forced Reeson:
Rethod:
Ezhibit G-Instructions for S-Scheduled A-Equipment Felture (Emptein) 1-Nonuel Preperation of Date Entry Sheets 8-Meintenance or Test 2-menuel Scree for Licensee Event Report (LER) File C-Refueling
'3-Automotic Scram (WUREG0161).
D-Regutetery Restriction 4-Cont *d. from Previous Month E-Operator Training & License Exam.
5-Reduction 5
F-Adeinistrative 9-Other Exhibit I-Seme se tee.
G-Operational Error (Emptein)
N-Other (Emptein)
- ~ _ _ _ _ _ _. _ _ __.
)
1 AVERAGE MIIX INIT PGIER IEVEL Docket No.
50-334 Unit BVPS Unit 1 Data Aucnist 6. 1990 cm pleted by M.A. Wir m r
'I4tlephone (412) 393-7621 l
ICNIN
. July 1990 i
IRY AVERAGE; MIIX POWER IZVEL IAY AVERAGE IAIIX ICWER 1EVEL (Nie-Net)
(Nie-Net) i 1
796 17 0
i I
2 808 18 0
(
j 3
804 19 0
l 4
783 20 0
l 5
783 21 0
6 808 22 0
7 804 23 0
8 800 24 0
9 783 25 o
10 792 26 167 11 800 27 167
[
12 8 04 28 163 13 652 29 628 14 0
30 800 15 0
31 808 16 0
l l
INS'IMXTIONS l
On this format, list the average daily unit power level in Nie-Net for each day in the reporting month. C%vte to the nearest whole megawatt.
l r
OPERATING DATA REPORT DOCKET NO.:
50 412 REPORT DATE: 08/07/90 COMPLETED BY: M.A.WINGER TELEPHONE:
(412) 393 7621 OPERATING STATUS
- 1. UNIT NAME: BEAVEk VALLEY. POWER STATION, UNIT 2 Notes
- 2. REPORTING PERIOD: JULY 1990
- 3. LICENSED THERMAL POWER (MWt):
2652
- 4. NAMEPLATE RATING (Gross MWe):
923
- 5. DESIGN ELECTRICAL RATING (Not MWe):
836
- 6. MAX. DEPENDABIE, CAPACITY (Gross MWe):
885
- 7. MAX. DEPENDABLE CAPACITY (Net MWe):
833
- 8. IF CHANGES OCCUR IN CAPACITY RATINC' SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED. IF ANY (Not MW'):
None
- 10. REASONS FOR RESTRICTIONS, IF ANY:
N/A THIS MONTH YEAR TO DATE CUMULATIVE'
- 11. MOURS IN REPORTING PERIOD:
744.0 5087.0 23702.0
- 12. NO. OF HRS. REACTOR WAS CRITICAL:
636.4 4979.4 20536.2
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 14. HOURS GENERATOR WAS ON LINE:
629.0 4972.0 20398.9
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GEN. (MWH):
1577454.0 10238102.0 49050846.4
- 17. GROSS ELECT. '.NERGY GEN. (MWH):
491800.0 3276700.0 15742800.0
- 18. NET ELECTRICAL ENERGY GEN. (MWH):
461030.0 3081311.0 14837786.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 84.5 97.7 86.1
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 84.5 97.7 86.1
- 22. UNIT CAPACITY FACTOR (DER): PCT 74.1 72.5 74.9 I
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 15.5 2.3 5.6 i
- 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE.AND DURATION OF EACH):
THE UNITS SECOND REFUE'.TNG OUTAG3 IS SCHEDUith TO BEGIN SEPTEMBER 4.1990 AND IS SCHEDUTrn TO LAST A> PROXIMATE 1Y 10 WEEKS.
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A
{
INITIAL ELECTRICITY N/A N/A
)
COMMERCIAL OPERATION N/n N/A i
i l
NARRATIVE SLM ERY C v.
M2fIHIX OPERATING EXPERIDKE
~
j UNIT II.
JUIX 1990 -
1
- 1 July 1 The. Unit operated at 46% output to stretch the current fuel l
cycle.
July 2-At 0015 hours1.736111e-4 days <br />0.00417 hours <br />2.480159e-5 weeks <br />5.7075e-6 months <br /> the Unit's. output :was escalated to 87% to
. j strutdt the current fuel cycle.
- At 0843 hours0.00976 days <br />0.234 hours <br />0.00139 weeks <br />3.207615e-4 months <br /> the Unit inadvertently tripped dtile testimJ relays' in the Unit's switdiyam!.
- t July.3 The Unit Iemained. shutdown to repair the.N31 Source Range l.
through Detector.
L July.5
[
L l
- July 6.
At 2022 hours0.0234 days <br />0.562 hours <br />0.00334 weeks <br />7.69371e-4 months <br /> the reactor was taken critical.
. l l
July 7
'At 0342 the. Unit.was. synchronized and' output was' escalated 1
l to a ncminal value of 1004..
t:
July 8 The Unit operated at a ncminal value of 1004'.
thlw gh July.31 r
3 Y
t i
i l
1
)
k
... -A.
.a --
-e a
.e'a
4
- ;l o.a UNIT SMUTDOWNS AND POWER REDUCTIONS Docket No.
50-412 Unit Name SWPS Unit 82 Date Aueust 7. 1990 Completed By R.A. Winner RF. PORT MONTH JULY 1990 7eiephone-t4121 393-7621 i
i i
l Nthod af Lice.see Cause & Corrective-Duration l
_.utt Everv.
System Component Action to'-
No.
Date Typel (Nours)
Down P
,'or3 Report 8 Code' code 5 Prevent Recurrence g
S 21 900701 S
O e
S N/A ZZ ZZZZZZ The Unit operataed at 461 output to stretch the current fuel cycle.
22
- 900702 F
115 9
3 2-90-008 IE RELAYX Unit inadvertently tripped white testing relays in the unit's switch yard.
I
- 1 2
'3 4
- Method:
Exhibit G-Instructions for.
S-Scheduled
.A-Equipment.Falture'(Explain) 1-Manuel Preparation of Data Entry Sheets S-Maintenance or' Test Manual Scram.
for Licensee Event Report (LER) Fite '
C-Refueling 3-Automatic Scram (NUREG0161).
D-Regulatory. Restriction 4-Cont'd. from Previous Month
- E-Operator-Training & License Exam'
' 5 Reduction) 5 F-Administrative-9-Other' Exhibit I-Same Source.
G-Operationat Error.(Explain)
H-Other.(Explain)'-
q-+_
.m-.a w
a-
=, -
ia.-%
~g.
&%n-
-.w..
.-pm
,:---..~
,-,-w._-e,,,,
,3-.,.
,m,-
~
-~e
~, _, _
._;.,.___._,,.,_gmj' w
-eb,
l
'[
AVERAGE DAILY UNIT POWER IEVEL L
c l
Docket No.
50-412 Unit BVPS Unit 2 l'
Date Auaust 6. 1990 i
Ompleted by M. - A. Wimar
'Delephone (412)393-7621 l
^
l san
.gagas, DAY.
AVEIME DAILY ICWER lEWL DAY AVERAGE DAILY POWER LEVEL (We-Net).
(We-Net) 1 323 17 781 t
t.
i 2
209 18-786-
- I L
l 3'
O 19 778-l l
4 0
20 790 l.
5 0
21 782 6
0 22
'786-7 252 23 786 8
678 24 790 l
l 9
757 25 786 10 7E9 26
-786 11 769 27 786 12 774 28
_ 786-13 769 29 778-14 761 30 781-l<
15 761 31-786 16-765 lt INSIM ETIONS On this format, list the average. daily unit power level in We-Net for each day in the reportirxj nonth. Ccmpute to the. nearest whole megawatt, i
-e