Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML16270A010 +
- L-2007-167, Report of 10 CFR 50.59 Plant Changes During the Period of December 19, 2005 Through May 27, 2007 +
- ML053480205 +
- ML20064A639 +
- ML20096B266 +
- ML20093G806 +
- ML20072E209 +
- ML20129G389 +
- ML20206M632 +
- ML20249A533 +
- 05000333/LER-1996-008-01, :on 960906,HPCI Sys Declared Inoperable Due to Failed DC to AC Power Inverter.Failed C11 Capacitor Located in HPCI Inverter 23INV-79 Replaced +
- 05000352/LER-1995-007-01, :on 950902,TS Condition in Unit 1 a & B & Unit 2 B H Recombiners Inoperable Due to Inadequate post-mod Test Caused by Personnel Error.Conducted All Hands Meeting & Maint Training Analysis +
- 05000293/LER-1991-024, :on 911030,loss of Preferred & Secondary Offsite Power Occurred Due to Severe Coastal Storm While Shut Down.Caused by Flashover Switchyard Insulator. Westinghouse Type Relay 62/5 Will Be Replaced +
- 05000395/LER-1983-100-03, /03L-0:on 830912,during Mode 1,RCS Tavg Exceeded Power Distribution Limits by 2-1/2 Degrees.Caused by Failure of Permanent Magnet Generator 22-volt Power Supply Condenser & Atmospheric Dump Valves +
- 05000498/LER-1994-018, :on 941102,required 0.125 Inches Water Gauge Could Not Be Demonstrated on Trains of CR Envelope HVAC Due to Less than Adequate Surveillance Test Procedure.Electrical Auxiliary Bldg HVAC Airflows Adjusted +
- 05000498/LER-1994-018-01, :on 941102,failure to Fully Meet Requirements of TS Re CR Envelope HVAC Sys Boundary.Caused by Less than Adequate Surveillance Test Procedure.Development of Detailed Testing Method Initiated +
- IR 05000440/1990010 +
- ML20039A533 +
- 05000346/LER-1980-018-03, /03L-0:on 800226,safety Features Actuation Sys Channel 3 Borated Water Storatge Tank Level Indication Was Discovered Reading Four Feet Higher than Other Three Channels.Caused by Inadequate Design of Freeze Protection +
- ML19343D755 +
- 05000316/LER-1996-002, :on 960120,train a Containment RM Caused Two Spurious Isolation Signals.Caused by Faulty Computer Board. C/A:Cvi Signal Reset +
- ML17298B481 +
- 05000397/LER-1989-035, :on 890817,reactor Scram Occurred During Surveillance Testing of Reactor Level Instrument Associated W/Automatic Depressurization Sys.Caused by Personnel Error. Training Improved & Visibility Increased +
- 05000499/LER-2005-005, Re 125 Vdc Switchboard De-Energized Without Placing Fhb HVAC in Emergency Recirculation Mode +
- ML21082A515 +