Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000461/LER-2002-001 +
- ML16349A386 +
- ML17053D909 +
- ML17317A743 +
- ML18102A757 +
- ENS 44276 +
- ML19276F138 +
- ML042530073 +
- ML022040472 +
- ML20087P939 +
- ML20087H306 +
- ML20074A814 +
- ML20100R078 +
- ML20105C435 +
- ML20135C040 +
- ML20127K926 +
- ML23338A191 +
- ML23338A231 +
- ML24193A296 +
- 05000312/LER-1989-010, :on 890821,when Performing Surveillance Procedure SP.452,technicians Neglected to Input Default Flow Rate Value.Caused by Personnel Error.Training Conducted for Technicians Re Surveillance Procedures +
- 05000461/LER-1989-029, :on 890714,manual Scram Initiated in Anticipation of Automatic Scram Due to Decrease in Main Condenser Vacuum.Caused by Mechanical Failure in Rubber Expansion Joint.Joint Replaced +
- 05000331/LER-1987-003, :on 870223,RWCU Sys Isolated on Signal from Room B Differential Temp Switch Located in RWCU Pump Room. Caused by Failure of Redundant Instrumentation. Instrumentation Replaced +
- 05000395/LER-1983-100-03, /03L-0:on 830912,during Mode 1,RCS Tavg Exceeded Power Distribution Limits by 2-1/2 Degrees.Caused by Failure of Permanent Magnet Generator 22-volt Power Supply Condenser & Atmospheric Dump Valves +
- 05000254/LER-1990-017, :on 900811,observed Excessive Leakage Through HPCI Steam Exhaust Check Valve Due to Deterioration of Seat. Caused by Gap Between Seat & Disk Along Ctr Sealing Surface of Disks.Steam Exhaust Check Valve Replaced +
- IR 05000213/1988099 +
- ML20069H958 +
- 05000265/LER-1990-004-03, :on 900213,loss of Emergency Bus 23-1 Occurred Due to Shorted Conductor Cable While Performing Wiring Verification.Caused by Personnel Error & Improper Installation.Electric Power Supplies Recovered +
- U-601671, Ro:On 900508,discovered That Replacement Bellows Had Tie Rods Installed to Limit Bellows Expansion.Div I & II Diesel Generators Declared Inoperable & Controlled Plant Shutdown Initiated.Unusual Event Terminated on 900509 +
- 05000315/LER-1987-021, :on 871013,ESF Actuation Occurred Due to Feedwater Flow/Steam Mismatch Coincident W/Low Level on Steam Generator 11.Caused by Failure of East Main Feedwater Pump Shaft Driven Oil Pump.Bearings Replaced +
- 05000397/LER-1992-001, :on 920102,high Pressure Core Spray Declared Inoperable Due to Battery Inoperability.Caused by Instructional Presentation Deficiencies in TS Requirements. Notes Were Added to Surveillance Procedure +
- 05000311/LER-2009-002, Regarding 22 Component Cooling Heat Exchanger Inoperable for Greater than Allowed Outage Time +
- ML24193A300 +
- ML19207B141 +
- 05000382/LER-1994-018-01, :on 941123,liquid Radwaste Released from Waste Condensate Tank a W/Incorrect & non-conservative Permit Release Setpoint on Liquid Waste Radiation Monitor.Caused by Human Error.Appropriate Personnel Counseled +