Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML13297A103 +
- ML18075A083 +
- ML18039A624 +
- 05000272/LER-1994-018-01, :on 941209,safeguards Equipment Cabinet (Sec) 1A Declared Inoperable Due to Sequencing Problem & TS 3.0.3 Entered.Root Cause Analysis Will Be Performed.Rept Also Intended to Satisfy Requirements of 10CFR21 +
- ML18348A629 +
- ML19029B020 +
- 05000272/LER-1982-054, Forwards LER 82-054/03L-0.Detailed Event Analysis Encl +
- ML20085F720 +
- ML20100R429 +
- ML20128N304 +
- ML20154G515 +
- ML20066F992 +
- ML20245G610 +
- RBG-37753, Forwards Informational Rept Re Discovery of Traces of Engine Cooling Water in Samples of Lube Oil in Div 1 EDG on 921015, Per 921026 Telcon W/Nrc.Caused by Leaking Head/Cylinder Liner.Maint Work Package Initiated & Cylinder Head Replaced +
- U-601991, Ro:On 920522,discovered That External Vessel Surface Was Hot & Chart Recorder Indicated Absorber Bed Temp Greater than 300F.Fire Brigade Was Activated.Sampling Process Established to Monitor Purge Exhaust Composition +
- 05000280/LER-1986-026, :on 860919,quadrant-to-average-power-tilt Ratio Exceeded 2% Tech Spec Limit.Caused by Dropped Control Rod P-6 Due to Failed Stationary Gripper Coil in CRD Mechanism. Coil Replaced +
- 05000373/LER-1986-003-02, :on 860122,reactor Water Sampled for Ph.Sample Point Had No Flow Next Time Surveillance Scheduled.Work Request Written.No Sample Obtained Until 860126.Caused by Personnel Error.Technicians Will Be Retrained +
- 05000354/LER-1996-025-01, :on 961107,during warm-up of RCIC Sys Automatic Isolation Signal Received from High Steam Flow Signal.Caused by Spurious Steam Line Pressure &/Or Steam Line Flow Signals.Rcic Isolation Signal Reset & Work Order Initiated +
- 05000287/LER-1984-006-03, :on 841106,offgas Monitors from Condensate Steam Air Injectors Showed Rapid Increase in Radiation Count Rate.Caused by primary-to-secondary Coolant Leak.Reactor Shutdown,Tests Run & Tubes Plugged +
- 05000293/LER-1995-003, :on 950324,manually Initiated RPS Scram Signal & Scram Occurred.Caused by Deliberate Movement of Reactor Mode Selector Switch from Run Position.Controller & Linkage Being Replaced +
- 05000336/LER-1993-005, :on 930311,discovered That Automatic RPS Actuation Occurred on 930222 & Not Immediately Reported to Nrc.Caused by Personnel Error.Memo Sent to All Licensed Operators/Personnel Re Reporting Requirements +
- ML20035A400 +
- ML20031C294 +
- ML20027C070 +