NARRATIVE SLM1ARY OF MotmiLY OPERATING EXPERIENCE UNIT NO. 1 AUGUST 1988 August 1
'Ihe unit operated at a nominal value of 100% output.
through August 21 August 22 At 2040 hours0.0236 days <br />0.567 hours <br />0.00337 weeks <br />7.7622e-4 months <br /> the unit began reducing power in preparation for a unit shutckun folleuing a detection of a chlorine gas leak frcm an off-site scarce.
August 23 At 0126 hours0.00146 days <br />0.035 hours <br />2.083333e-4 weeks <br />4.7943e-5 months <br /> the unit was shutdown while the Control Rocm Air Pressurization System was recharged. At 0135 hours0.00156 days <br />0.0375 hours <br />2.232143e-4 weeks <br />5.13675e-5 months <br /> the reactor was taken suberitical. At 1830 hours0.0212 days <br />0.508 hours <br />0.00303 weeks <br />6.96315e-4 months <br /> the reactor was taken critical. At 2220 hours0.0257 days <br />0.617 hours <br />0.00367 weeks <br />8.4471e-4 months <br /> the unit was synchronized and power was escalated to a ncminal value of 100% output.
August 24
'Ite unit was cperated at a ncminal value of 100% output.
throvgh August 26 August 27 At 0001 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> a load reductica toward 50% output was initiated for core life extension.
i August 28 The unit operated at a ncminal value of 50% cutput.
August 29 At 0500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> the unit's output was escalated to a ncminal value of 100%.
August 30
'Ihe unit operated at a ncr.dnal value of 100% output.
through August 31 08092003G4 880031 1f PDR ADOCK 05000334 R
PNU
')I w
UNIT SHUIDOWNS AND POWER REEMICil0NS EMKKEi NO. 50 M4 UNIT mange avPs unie I DATE Sentember 12. 1988 REPORT AGONIH AUGUST 1988 tonerLETEls BY M-A_ Winger _
IELEFilONE fal?) 191-7671 1
en w mo u
.E 1.icensee Cause & Corrective c
o O
No.
Date Event e
Action to Report #
y j
eo
=g Prevent Recurrence
.c g
x m
u a
13 880822 F
0 H
5 N/A ZZ ZZZZZZ The unit's output was reduced in preparation for a unit shutdown following a chlorine gas leak from an offsite source.
14 880823 F
20.9 H
1 88-14 SG ACCUMU The unit was shutdown due to a chlorine gas leak from an offsite source.
15 880823 F
0 H
5 N/A ZZ ZZZZZZ Power rampup after unit shutdown.
16 880827 5
0 F
5 N/A RC FUELXX The unit's output was reduced to 50% to extend core life.
I 2
3 4
I f.=.eJ Reas.us
,e,,a w.
ghe G. I. e.
e6. s 5 5.licJu8eJ A f.g.apsisene ra l e g g,pi,6 3 g_,,,,,g g., r,cp,,,s,.
,e n,,,
a Maissecenate..e Tess 2 % = 1 Scree I asas sli<<ss t.w I s.rus<c C Refuelh'E 3-Aestomatte Scram I $<a' Rel e el i M S I ele tN*t sNI G D Nepulas.=> Messeisshsa 4-coattn.e4 Free-Previous feontti ole.I l I th.csas.= isaineng A l ascesse I san.seasi'
5-Rdiec t iosa I AJamaeseesee,c 9-otlier 5
- f. tIrrease..ial I....e I splas I I slutwo I S**w %=use t*8/ F F)
Il f klace it igitaant e
OPERATING DATA REPORT DOCKET NO.:
50-334 REPORT DATE:
09/09/88 CO'APLETED BY.* M.A.VINGER IELEPHONE:
(412) 393-7621 OPERATING STATUS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
- 2. REPORTING PERIOD: AUGUST 1988
- 3. LICENSED THERMAL POWER (MWe):
2660
- 4. NAMEPIATE RATING (Gross MWe):
923
- 5. DESIGN ELECTRICAL RATING (Net MWe):
835
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe):
860
- 7. MAX DEPENDABLE CAPACITY (Net MWe):
810
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LA0T REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe):
None
- 10. REASONS FOR RESTRICTIONS, IF ANY:
N/A THIS MONTH YEAR TO DATE CUMUIATIVE
- 11. HOURS IN REPORTING PERIOD:
744.0 5855.0 108143.0
- 12. NO. OF HRS. REACTOR WAS CRITICAL:
727.1 4333.1 63517.3
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 4482.8
- 14. HOURS GENERATOR WAS ON LINE:
723.1 4262.3 61916.5
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GEN. (MWH):
1816437.0 10826517.0 147743836.5
- 17. GROSS ELECT. EflERGY GEN. (MVH):
579740.0 3505799.0 47371519.0
- 18. NET ELECTRICAL ENERGY GEN. (MWH):
543470.0 3285177.0 44210870.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 97.2 72.8 59.6
- 20. UNIT AVAIIABILITY FACTOR:(PERCENT) 97.2 72.8 59.6
- 22. UNIT CAPACITY FACTOR (DER): PCT 87.5 67.I.
52.1
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 2.8 2.8 18.7 t
- 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE, AND DURATION OF EACH):
l
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
4 FORECAST ACHIEVED INITIAL CRITICA1.ITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A
AVERAGE DAILi UNIT POWER LEVEL DOCKET NO.
30-33' UNIT 3'#?S 31: d1 Sept. 12, 1988 DATE COMPLETED SY M. A. Winger TELEPHONE G12) 393-7621
^
b I' O MONDI DAY AVERAGE DAILY power LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Neti (MWe-Net i 792 788
,7 783 gg 788 788 808 3
4 775 20 792 5
783 804 33 788 825 6
7 788 0
- 3 792 692 i
3 3
9 788 33 796 788 796 in 3
11 779 27 379 788 358
,3 13 7R1
- 9 688 34 775 804 30 792 15 ji 808 le 779 INSUUCT10NS On this format,!tst the 4serage daily unit.mmer rese!:n MWe. Net far esch day in the reputting month,(*.innute 'o the nearest whvie mepwatt, tW77)
O NARRATIVE STM1ARY OF FONIELY OPERATING EXPERIENCE UNIT NO.~ 2 AUGUST 1988 August ]
We unit operated at a ncminal value of 100% output.
through August 17 August 18 At 1115 hours0.0129 days <br />0.31 hours <br />0.00184 weeks <br />4.242575e-4 months <br /> the unit's output was reduced to 25% while verifying a potential breakdown of the unit's main transformer. At 1430 hours0.0166 days <br />0.397 hours <br />0.00236 weeks <br />5.44115e-4 months <br /> the unit's output was escalated to 100% after confirming the unit's main transformer was not faulted.
August 19 2e unit operated at a ncminal value of 100% output.
through August 21 August 22 At 2300 hours0.0266 days <br />0.639 hours <br />0.0038 weeks <br />8.7515e-4 months <br /> the unit's output was ranped down in l
preparation for a plant shutdown Silowing a detection of a chlorir.e gas leak frcm an off-site source.
August 23 At 0044 hours5.092593e-4 days <br />0.0122 hours <br />7.275132e-5 weeks <br />1.6742e-5 months <br /> the unit was removed frcm service, while the Control Rocm air Pressurization System was recharged. At 0100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> the reactor was taken subcritical. At 1330 hours0.0154 days <br />0.369 hours <br />0.0022 weeks <br />5.06065e-4 months <br /> the reactor was taken critical. At 1921 hours0.0222 days <br />0.534 hours <br />0.00318 weeks <br />7.309405e-4 months <br /> the reactor was shutdown to permit repairs to scme potentially inoperable containment isolation valves.
August 24
%e uni; remained in bbde 4 to repair scme potentially inoperable containment isolation valves.
August 25
%e reactor was taken critical at 0330 houru. At 0811 hours0.00939 days <br />0.225 hours <br />0.00134 weeks <br />3.085855e-4 months <br /> the unit was sychronized and power output was escalated.
August 26 At 0530 hours0.00613 days <br />0.147 hours <br />8.763227e-4 weeks <br />2.01665e-4 months <br /> the unit achieved 100% output.
August 27
%e unit operated at a ncminal value of 100% output.
through August 31
UNIT SHUIDOWNS AND POWER REDUCil0NS DOCKET NO. 50-412 UNIT MAME BVPS IInit 2 IDAIE SeDtember 12, 1988 REPORT MONIH August 1988 COMrtE1En my M.A_ Winger TELEPHONE f4171 393-7621 cm w se o sa OE "c
3U Licensee Cause & Corrective C*
4 f
h 8t*
Event Action to N
2 gg Report #
=g ao Prevent Recurrence f
x un u
Q 13 880818 F
0 A
5 N/A EB TRANSF Unit's outp:t reduced to 25% while I
verifying a potential breakdown of the unit's :cin transformer.
14 880822 F
0 H
5 N/A ZZ ZZZZZZ Unit's output reduced in preparation for plant shutdown.
15 880823 F
18.6 H
l 88-14 SG AGCUMU Unit removed from service due to a chlorine gas leak from an off-site soarce.
16 880823 F
36.8 B
1 N/A SD VALVEX Urit remained shutdown to repair some potentially inoperable contain-i ment isolation valves.
17 880825 F
0 H
5 N/A ZZ ZZZZZZ Power ramp up after unit shutdown.
1 2
3 4
F ' I
- eJ Reas m ne haa:
1.spiet e C,. In. sew.ei..es S 5 "cJucJ h
s A f.g posice.e Faelese(I aptaint g _se 3 t 3.w riepasase. = ut pasa 3 Maineenesece e.s Tess 2-etanual Scram I nees 58.ccesI.= lsicies<c 0 Refweli"E 3-Automatic Scram I *en' Mer*"68I I R 8Iele E NI'RI G p Rcralaeus) Rcsselsenem 4-coatinwed Free Prevtaus Moatii ole 18 l
1 8hereatne Teainasig A 1 escase I sanassiasi'*
5-see'uctloa 1 AJoemesesseaceve 9-Other 5
f.Ih.reJee.malIee..eiIaplaeesI l slisties I - Sasser Nm..c t1/77)
II Oslice iI ig. tam?
e
AVERAGE D AILi UNii ?CWER LIVEt, 00CXZT NO.
50-412 UNgy BVPS Unit 2 9/12/88 DATE COMFt.ITED SY M. A. Winger TTLIPHONE (412) 393-7621 August 1988 Mom OAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DALLY POWER LIVEL IMWe-Net i iMWe-Net s 794 777
,7 785 is 641 789 785 g,
3 781 7,98 4
g 785 798 789 790 4
3 789 0
7 0
g 793 4
789 163 3
to 785
- 6 785 781 797 g
785 789 777 802 g3 777 806 g
3, i
785 789 l
15 31 785 3
INSTRUCT 10fd5 On this futmat.!ut the nerage tilv unit n s et nut :n \\tWe Net far each day in the recoeting iisinth. i'..mnute to i
the nearest whole rnepwasI.
till7* )
4
.J'..
v OPERATING DATA REPORT DOCKET NO.:
50-412 REPORT DATE:
09/09/88 COMPLETED BY: M.A.WINGER TELEPHONE:
(412) 393-7621
- M TING STATUS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 Notes
- 2. REPORTING PERIOD: AUGUST 1988
- 3. LICENSED THERMAL PG ER (MWt):
2660
- 4. NAMEPIATE RATING (Grms MWe):
923
- 5. DESIGN ELECTRICAL RATINO, (Net MWe):
836
- 6. MAX. DEPENDABLE CAPACITT (Gross MWe):
885
- 7. MAX. DEPENDABLE CAPACITY (Net MWe):
833
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE IAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe):
None
- 10. REASONS FOR RESTRICTIONS, IF ANY:
N/A THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD:
744.0 5855.0 6926.0
- 12. NO. OF HRS. REACTOR WAS CRITICAL:
699.4 5371.5 6337.0
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 14. HOURS GENERATOR WAS ON LINE:
688.6 5326.6 6276.4
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0 l
- 16. GROSS THERMAL ENERGY GEN. (MWH):
1783059.0 13796006.0 16181643.4
- 17. GROSS ELECT. ENERGY GEN. (MWH):
560800.0 4433700.0 5215900.0
- 18. NET ELECTRICAL ENERGY GEN. (MWH):
528704.0 4190271.0 4928375.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 92.6 91.0 90.6
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 92.6 91.0 90.6
- 22. UNIT CAPACITY FACTOR (DER): PCT 85.0 85.6 85.1
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 7.4 3.3 4.6
- 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):
i
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DA F STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A
-~ a
' 'A A 7sf M
T.i.pnon. om mmoo Nudear Group
$h pp rt. PA 15077@04 September. 12, 1988 Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. OPR-66
~ Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Operating Report U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C.
20555 Gentlemen:
In accordance with Appendix A, Technical Specifications, the Monthly Operating Report is submitted for Unit I and Unit 2 for the month of August, 1988.
Very truly yours, f
AW
. D. Sieber Vice President Nuclear Group jlw Enclotures cc:
NRC Regional Office King of Prussia, PA Y
i