Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ENS 45573 +
- ML092230129 +
- ML083510752 +
- ML20024C411 +
- PLA-7769, Annual Radiological Environmental Operating Report (PLA-7769) +
- ML19284A711 +
- ML041820222 +
- ML040640923 +
- ML20059D735 +
- ML030230710 +
- ML20076M299 +
- ML20096C410 +
- ML20118B536 +
- ML20141N840 +
- IR 05000440/1986009 +
- ML20203D494 +
- ML20247F058 +
- RA-97-0258, LER 97-S12-00:on 971119,discovered Uncompensated Security Zone.Caused by Inattention to Detail by Members of Security Force.Provided Event Info to Security Shift Personnel & Changed Practice Re Zone Review +
- 05000382/LER-1987-028, :on 871211,reactor Trip Occurred Due to Inadvertent Shutting of Msiv.Caused by Solenoid Valve Stuck Open During Testing.Solenoid Valve Replaced & MSIV Tested Successfully Prior to Restarting of Plant +
- 05000373/LER-1993-001-02, :on 930105,LPSI Pumps 1B & 1C & DG 1A Received Automatic Start Signal.Caused by Personnel Error.Instrument Maint Dept Will Be Tailgated on Event & Correct Reactor Level Verified +
- 05000382/LER-1991-011, :on 910528,reactor Trip Occurred.Caused by Faulty Relay That Prevented Electrical Bus Transfer.Faulty Relay Replaced & Procedures Revised +
- 05000382/LER-1991-011-01, :on 910528,main Turbine Manually Tripped Due to Loss of Governor Control,Resulting in Automatic Reactor Trip.Caused by Faulty Relay Preventing Electrical Bus Transfer.Relay Replaced +
- 05000352/LER-1993-010-04, :on 930820,actuation of PCRVICS & ESF Occurred After Reactor Enclosure Exhaust Plenum Radiation Monitor Spuriously Tripped.Cause Not Determined.Sensor Converter for Radiation Monitor Replaced During Testing +
- 05000281/LER-1989-015-02, :on 891025,slow Boron Dilution of RCS Occurred W/O Containment Integrity.Caused by Misinterpretation of Tech Spec by Senior Reactor Operator Involved.Blender Properly Set Up Using Nomographs +
- 05000454/LER-2015-002, Re Reactor Trip Resulting from a Phase to Phase Fault on the 1E Main Power Transformer +
- BVY-04-108, September 2004 Monthly Operating Report for the Vermont Yankee Nuclear Power Station +
- ML20141E789 +
- 05000397/LER-1990-025, :on 901023,HPCS Sys Declared Inoperable.Caused by Equipment Failure.Plant Policy Reviewed,Design Differential Pressure Calculation Process Revised & Thrust Calculation HPCS-V-23 Revised +