Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ENS 47803 +
- ML15027A424 +
- PLA-7769, Annual Radiological Environmental Operating Report (PLA-7769) +
- ML033640434 +
- L-03-092, National Pollutants Discharge Elimination System (NPDES) Monthly Report for April 2003 +
- ML042080402 +
- ML042080125 +
- ML033570511 +
- 05000311/LER-1983-008, Forwards LER 83-008/99X-0.Detailed Event Anaysis Encl +
- ML20137J678 +
- ML20133B790 +
- ML20224A170 +
- ML20224A169 +
- ML20205D180 +
- RA-97-0258, LER 97-S12-00:on 971119,discovered Uncompensated Security Zone.Caused by Inattention to Detail by Members of Security Force.Provided Event Info to Security Shift Personnel & Changed Practice Re Zone Review +
- U-601991, Ro:On 920522,discovered That External Vessel Surface Was Hot & Chart Recorder Indicated Absorber Bed Temp Greater than 300F.Fire Brigade Was Activated.Sampling Process Established to Monitor Purge Exhaust Composition +
- ML23137A378 +
- ML24059A034 +
- ML24016A002 +
- ML24213A020 +
- 05000461/LER-1989-029, :on 890714,manual Scram Initiated in Anticipation of Automatic Scram Due to Decrease in Main Condenser Vacuum.Caused by Mechanical Failure in Rubber Expansion Joint.Joint Replaced +
- 05000413/LER-1984-018-02, :on 841023,in-core Thermocouple Tube Leakage Occurred.Caused by Separation of Stainless Steel Conduit from Swagelok Tube Fitting.Thermocouple Replaced +
- 05000354/LER-1995-035, :on 951120,failed to Lock Reactor Mode Switch in Opcon 5,missed SRM Surveillance & Missed Suppression Chamber Level Surveillance Due to Inadequate Procedures. Revised Procedures +
- BECO-LTR-93-061, Monthly Operating Rept for Apr 1993 for Pilgrim Nuclear Power Station +
- 05000369/LER-1981-005-03, /03L-0:on 810202,power Supply to Both Excore Range Monitors Was Interrupted.Caused by Maint Personnel Cutting Off Power to Investigate Steam Generator Status Lights & lo-lo Level Alarms.Personnel Instructed +
- 05000423/LER-1990-005, :on 900118,manual Plant Trip Initiated in Anticipation of Automatic Trip on lo-lo Level in All Four Steam Generators.Caused by Loss of Preload on Coupling Blocks from Personnel Error.Procedure Revised +
- ML19340A637 +
- BVY-04-108, September 2004 Monthly Operating Report for the Vermont Yankee Nuclear Power Station +
- BVY-04-036, March 2004 Monthly Operating Report from Vermont Yankee +
- BVY-04-001, December 2003 Monthly Operating Report for Vermont Yankee +
- ML17265A206 +
- ML20199C819 +
- ML25197A565 +
- ML25337A334 +