Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Press Release-I-10-023, NRC to Hold Public Meeting on April 27 in Berwick, Pa. to Discuss Annual Assessment of Susquehanna Nuclear Power Plant +
- ML17347A653 +
- NRC 2016-0034, Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 14 - Safety Analysis +
- NRC 2009-0085, License Amendment Request 241 Alternative Source Term Response to Request for Additional Information +
- ML20040A217 +
- ML19255E180 +
- ML042020571 +
- ML20063A373 +
- ML20096B266 +
- ML20116F340 +
- ML20134K152 +
- ML20066E054 +
- ML20204J111 +
- ML20216H603 +
- ML20210E282 +
- LIC-96-0096, Monthly Operating Rept for June 1996 for Fort Calhoun Station Unit 1 +
- NLS8500045, Forwards Addl Info Re Spds,Per 841005 Commitment.Finalized List of SPDS Parameters,Isolation Test Procedure for Fiber Optics & Description of Displays for SPDS Encl +
- ML23192A215 +
- ML23167B007 +
- BECO-LTR-95-081, Monthly Operating Rept for July 1995 for Pilgrim Nuclear Power Station +
- ML24008A102 +
- 05000412/LER-1997-001-01, :on 970106,reactor Trip Occurred Due to Main Transformer Ground Protection.Caused by Inadequate Design Implementation.Procedure 10M-35.3C & Elementary Diagram Was Revised +
- 05000237/LER-1985-037-03, :on 851007,reactor Bldg Ventilation Tripped & Isolated W/Standby Gas Treatment Sys Autostarting as Required.Caused by Operator Removing Wrong Fuse.Station Tailgate Session Conducted +
- 05000412/LER-1997-001, :on 970106,reactor Trip Occurred Due to Main Transformer Ground Protection Relay.Caused by Inadequate Design Implementation.Procedures 2OM-35.3C & 2OM-35.4L Revised +
- 05000254/LER-1996-020-01, :on 960907,CR Emergency Filtration Sys Declared Inoperable.Caused by Operator Knowledge Weakness.Operators Declared CR Emergency Filtration Sys Inoperable & Entered 14-day LCO +
- 05000413/LER-1992-013, :on 921203,TS 3.0.3 Entered Due to Both Trains of CR Area Ventilation & Chiller Water Sys Being Inoperable. Chiller B Guide Vane Actuator Pump Replaced W/Previously Installed Actuator +
- 05000413/LER-1992-013-01, :on 921203,TS 3.0.3 Entered When Both Train a & B of CR Area Ventilation & Chilled Water Sys Declared Inoperable on 921130 & 1203,respectively.Caused by Chiller Guide Vane Actuator Failure.Actuator Replaced +
- 05000374/LER-1992-013-05, :on 920917,RCIC Sys Initiated,Resulting in Vessel Injection for Approx 20 S.On 910724 & 920622,similar Injections Occurred.Caused by Pressure Transient Spike.Rcic Turbine Trip Switches Placed in Bypass +
- 05000397/LER-1984-117, :on 841116,RHR Sys Automatically Isolated During Circuit Testing After Mods to Leak Detection Sys. Caused by Failure to Put RHR in Test Position During Test. Personnel Given Addl Training +
- 05000272/LER-1983-055-03, /03L-0:on 831110,RCS Unidentified Leakage Exceeded Tech Spec Limit.Caused by Change in Containment Fan Coil Unit Configuration & Speed.Unit Shut Down to Identify & Repair Leaks in Containment +
- 05000311/LER-1990-021, :on 900515,radiation Monitoring Sys Channel 2R12A Failed Resulting in ESF Signal Actuation for Containment Purge/Pressure Vacuum Relief Sys Isolation. Caused by Equipment/Design Concerns +
- IR 05000219/1989099 +
- NUREG-0227, Partial Draft of Nuclear Power Plant Operating Experience - 1978, Section 3.0, Plant Outages. Portions of NUREG-0483, NUREG-0366 & NUREG-0227 (Plant Operating Experience for 1977,1976 & 1974-75,respectively) Encl +
- 05000397/LER-1990-021, :on 900925,operators Manually Scrammed Reactor After Experiencing Main Turbine Hydraulic Control Oil Pressure Problems +
- ML092151123 +
- ML092120049 +
- 05000311/LER-1982-036-03, /03L-0:on 820503,containment Fan Coil Unit 21 Failed to Start in Low Speed.Caused by Failed Control Board Pushbutton.Pushbutton Repaired +