Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17312B076 +
- ML16312A002 +
- ML061990135 +
- ML18058A436 +
- ML050950215 +
- ML050040264 +
- ML19323F150 +
- ML041560464 +
- ML20058H867 +
- ML20073F335 +
- ML20247D145 +
- ST-HL-AE-3089, Special Rept:On 890406,standby Diesel Generator 12 Failed. Caused by Failed Resistor in Power Supply Circuit of Electronic Governor.Resistor Replaced & Generator Tested +
- ST-HL-AE-3050, Requests Discretionary Enforcement to Provide Temporary Relief from Tech Spec Requirement 3.8.1.1.d +
- ML24194A014 +
- ML24012A205 +
- 05000461/LER-1988-004, :on 880129,discovered That Manipulation of Incorrect Temp Controller Resulted in Inoperable Div 1 Primary Containment Hydrogen Recombiner W/Div II Diesel Generator Inoperable.Caused by Operator Error +
- 05000423/LER-1996-001-02, :on 960120,supplementary Leak Collection & Release Sys Declared Inoperable Due to Equipment Failure of Door Latch.Door Repaired & Plant Returned to 100% Power +
- 05000369/LER-1990-025, :on 900827,shutdown Because of Unidentified RCS Leakage Greater than TS Limits Occurred Due to Equipment Failure +
- 05000498/LER-1990-015, :on 900628,reactor Trip Occurred Due to Turbine Trip Caused by Low Electrohydraulic Control Sys Fluid Pressure.Caused by Excessive Vibration by Oscillation in Main Turbine Generator Governor Valve +
- IR 05000324/1982005 +
- 05000261/LER-1981-032-03, /03L-0:on 811205,boric Acid Transfer Pump a Tripped & Was Declared Inoperable.Caused by Error in Valve Lineup Procedure & Open Winding in Transfer Pump Motor. Procedure Revised & Motor Replaced +
- 05000369/LER-1990-025-01, :on 900827,Unit 1 Shut Down Because of Unidentified RCS Leakage Exceeding Tech Spec Limits.Caused by Equipment Failure.Procedure AP/1/A/5500/10 Implemented. Valve 1NC-33 Will Be Repacked at Next Outage +
- 05000311/LER-1990-005, :on 900117,Tech Spec Action Statement 3.0.3 Entered Due to Inoperability of Two High Head ECCS Subsys. Caused by Leak from Welded Pipe Cap on Boron Injection Tank. Pipe-to-cap Socket Welded Joint Repaired +
- 05000346/LER-1978-023-03, /03L-0:on 780224,temp Indication for Reactor Protection Sys Channel 2 Spiked Tripping Channel & Shut Down Reactor.Caused by Faulty Connector Due to Dirt on Contacts. Channel 2 Temp String Modules Removed & Connectors Cleaned +
- 05000346/LER-1978-022-03, /03L-0:on 780223,flow Transmitter FTRC1A3 Found Inoperable.Caused by Defective Flow Transmitter Amplifier. Amplifier Replaced & Flow Transmitter FTRC1A3 Returned to Svc on 780226 +
- NUREG-0227, Partial Draft of Nuclear Power Plant Operating Experience - 1978, Section 3.0, Plant Outages. Portions of NUREG-0483, NUREG-0366 & NUREG-0227 (Plant Operating Experience for 1977,1976 & 1974-75,respectively) Encl +
- 05000311/LER-1997-013-01, :on 970902,unplanned Entry Into TS 3.0.3 Was Noted Due to Two Inoperable Pressurizer Level Channels. Caused by Error in RCS P&ID Drawing.Pressurizer Channel I Was Restored within Six Minutes of Event +
- ML17193A638 +
- BW250019, Annual Radioactive Effluent Release Report +