ML17193A638
| ML17193A638 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 01/16/1981 |
| From: | Maxwell D COMMONWEALTH EDISON CO. |
| To: | |
| Shared Package | |
| ML17193A637 | List: |
| References | |
| NUDOCS 8101270520 | |
| Download: ML17193A638 (16) | |
Text
OPERATING DATA REPORT OPERATING STATUS
- 1.
Unit *Name: Dresden* I
......;;;~;.;;..;;;~...;;;.-------------------------------~
- 2.
Reporting Per.iod: December, 1980
- 3.
Licensed Thermal -P-ow..__e_r_*_(M_W_t~)~:-.--7-0-0------------------~
- 4.
Nameplate Rating (Gross MWe):
209
- 5.
Design Electrical Rating (Net MWe): 200
- 6.
Maximum Depgndable Capacity (Gross -M-V./,..e"'")_:_2_0_5 ________ _
DOCKET NO. __;;,0.;..50.;..-...;;0;..;;;l-.,0 ___ _
DATE January 16, 1981 COMPLETED BY D. C. Maxwell TELEPHONE (815) 942~2920 X-550 NOTES
- 7.
Maximum Dependable Capacity (Net MWe):
197
- 8.
If Changes Occur in Capacity Ratings..,.(-1-te_m_s_._3......,,,T"""h_r_o....
ug-h-. 7) Since Last Report, Give,
Reasons:
N/A
- 9.
Power Level to \\*Jhich Restricted, If Any (Net MWe):_*-=N~A=-----------------------------
- 10.
Reasons For Restrictions, If Any:
N/A
- 11.
- 12.
- 13.
- 14.
- 15.
- 16.
- 17.
- 18.
- 19.
- 20.
- 21.
- 22.
- 23.
- 24.
--~~-----------------------------------------~
Ho~rs in Reporting*P*riod Number of Hours Reactor Was Critical Reactor Rese.rve Shutdown Hours Hours Genera~or On~Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)
Gross Electrical Ene~gy Generaied (MWH)
Net Electrical Energy Generated.(MWH)
Uni.t Service Factor Unit Availability Factor Unit Capacity Factor (Using MOC ~et)
.Unit Capaciiy Factor {Using DERcNet)
Unit Forced Outage. Rate This Month Yr-to-Date Curnutatill~.
EXTENDED
- MODIFICATION OUT.AGE Shti~downs Scheduled Over Next 6.Months.(Type, Date,*and Duration of* Each):
N/A.
- 25.
If.Shut Down At End Of Report Period, Estimated Date of Startup:Extended*Modification.
~-101210 s-ao Outage ~ Shutdown Until June, 1986
OPERATING DATA REPORT OPERATING STATUS I.
Unit Name: Dresden II
~.::....;..::...;.~-==--------------------~
- 2.
Reporting Period: December, 1980
- 3.
Licensed The rma I
_P;;...o;:.w;;...e;:.;r~( ;..;;MW;...,_t,....)....;.: _2_5_2_7"'"".----------....-------
- 4.
Nameplate Rating (Gross M\\.Je):
- 828 *
--.,.-,-........,,..,..------------~
- 5.
Design Electrical Rating (Net M\\.Je): 794
- 6.
Maximum Dependable Capacity (Gross -M-\\.J-e.... )_:_8_1_2 _____ _
- 7.
Maximum Dependable Capacity (Net M\\.Je):
772 DOC KET NO. _0.;;..;5;....;0;_;-_2.-3.._7 ----
DATE January 16, 1981 COMPLETED BY D. C. Maxwell TELEPHONE. (815) 942-2920 X-550 NOTES
- 8.
If Changes Occur in Capacity Ratings...,(_1_t-em_s_3_T...,.h_r_o_u_g~h 7) Since Last Report, Give Reasons:
. NA
- 9.
Power Level to \\.Jhich Restricted, If Any (Net MWe):
NA
--~=-....;...--.,.----------.,.----
- 10.
Reasons For Restrictions, If Any:.NA
--=~=---------------------------------~
- 11.
- 12.
- 13.
- 14.
- 15.
16 ~
- 17.
- 18.
- 19.
- 20.
- 21.
22;
- 23.
- 24.
This Month Hours in Reporting Period Numb~r of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy G.enerated (MWH)
Gross Electrical Energy Gener~ted (MWH)
Net Electrical Energy Generated (t1WH)
Unit Service Factor Unit Avai1abil ity Factor
- Unit Capacity Factor (Using MDC. Net)
Unit Capacity Factor (Using DE~ Net)
_Unit Forced Outage Rate Shutdowns Scheduled Over Next 6.Months (Type, R~fueling January 2, 1981 - 17 W~eks
'744 660:04 0
626:08 0
722,318 216,847 198.616 84.16 84.16 34.58 33.62 15.84 Date, and Yr-to-Date 8,784 8,402:27 0
8,197:31 0
15,656,214 4,866,244 4.580.888.07' 93.32 93.32 67.55 65.68 4.42 Curuulati'le.
.93 z 240 73,137:53
- 0.
69,460:03 0
137,298,056
43,872,863 41,468,999.287 74.50 74.50 57.61 56.01 12.53 Duration of Each):
25 *. If Shut.Down At Erid Of Report Period, Estimated.Date of Startup:
N/A I
-=-------
OPERATING DATA REPORT OPERATING STATUS
- 1.
Unit Name:
Dresden III
'--------------------~
- 2.
Re po rt i n g Pe r.i od :........;;;D...;e...;;c...;;e.;;.m~b...;;.e_r.....,.,-.;;.,1.;..9 8_0...;__....,....------"----
3
- Licensed Thermal Power (MWt): 2527
---~~--------------
- 4.
Nameplate Rating (GrOss MWe):
828
- 5.
Design Electrical Rating (Net-M\\-.Je_,_)_:-79_4 _______ _
- 6.
Maximum Dependable Capacity (Gross MWe): 812
- 7.
Maxi mum Dependab 1 e Capacity (Net M\\.Je) : 7_7_3 __________ _
DOCKET NO. 050-249
~------~
DATE January 16, 1981 COMPLETED BYD. C. Maxwell TELEPHONE (815) 942-2920 X-550 NOTES
- 8.
If Changes Occur 1n Capacity Ratings (Items 3 Through 7) Since Last Report, Give Reasons:
N A
- 9.
Power Level to \\*Jhich Restricted, If Any (Net MWe):
- N/A
- 10.
Reasons For Restrictions, If Any: _
- 11.
Hours in Reporting Period
- 12.
Number of Hours Reactor Was Critical
- 13.
Reactor Res~rve Shutdown Hours
- 14.
Hours Generator On-Line
- 15.
Unit Reserve Shutdown Hours 16.. Gross.Thermal Energy Generated (MWH)
- 17.
Gross Electrical Energy Generated: (M\\.JH)
- 18.
Net Electrical Energy Generated (MWH) 19~
Unit Serv~ce Factor
- 20.
Unit Avai.lability Factor
- 21.
Unit' Capacity Factor (Using MDC Net)
- 22.
Unit Capacity Factor (Using OER Net)
- 23.
Unit Forced Outage Rate
- 24.
Shutdowns Scheduled Over ~ext 6 M6nths This Month 744 2!+/-!+/-:07 0
618:01
~l 1 37.5 1.111 4491982 4261155 83.07 83.07 74.10 z2.14 (Type, 2 I 9:.J
. Date, Yr-to-Date CuroulatiYc.
8 784 82,825 61221:39 62.202:32 0
0 6z308:46 59!634:14 1412121803 11614841460 415701894
. 381000,568.25 413291608.93 36z022,899.89 71.82 75.10 71.82 75.10 67.32 56.26 65.54 54.78
- 1. 9f!
D.,J8 and Du rat i ori of Each):
- 25.
If Shut Down At End Of Report Period; Estimated Date of.Sta rtup.:_N_/_A __________ __
AVERAGE DAILY UNIT POWER LEVEL MONTH DECEMBER, 1980 DAY
- 2.
3 4
5 6
7 8
9.
10 11 12 13 14 15
. 16 AVERAGE DAILY POWER LEVEL (MWe-Net) 0 0
.o 0
0 0
0 0
0 0
0 DAY 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 DOC KET NO. _;:0:..::;5....;;;.0_-o.;;..;1;;;..;o.__ __ _
Ull IT Dresden I DATEJanuary 14, 1980 COMPLETED BYD. C. Maxwell TELEPHONE (815) 942-2920, X-550 AVERAGE DAILY POWER LEVEL
' (M\\.Je-Net).
0 0
0 0
0 0
0 0
0
.0
AVERAGE DAILY UNIT POWER LEVEL MONTH DECEMBER, 1980 DAY
- AVERAGE DA IL Y PO\\.JE R LEVEL DAY
( M\\.Je-Ne t) 364 17 2
333 18 3
0 19 4
0 20 5
5 21 6
374 22 7
380 23 8
348 24 9
25 10 1.
26 11 89 27 12 0
28 13
. 298 29 14 366 30 15 347 31 16 356 DOCKET NO. 050-237 Ull IT Dresden II DATE January 14, 1980 COMPLETED BY D. C. Maxwell TELEPHONE (815) 942-2920, x-550 AVERAGE DA I LY PO\\~ER LEVEL I
(M\\.Je-Net) 352 350
. 351 350 351 350 333 333 328.
326 324 321 320 320 321
DAY 2
3 4
5
.6 7
8 9
10 11 12 13 14 15 16 AVERAGE DAILY UNIT POWER LEVEL DECEMBER, 1980 AVERAGE DAILY POWER LEVEL DAY (MWe-Net) 820 17 829 18 828 19 830 20 829 21 804 22 738
. 23 819 24 827 25 827.
26 803 27 813 28 814 29 748 30 822.
31 825 DOCKET NO. 050-249 UlllT Dresden III DATE January 14., 1981 COMPLETED BY D.* C. Maxwell TELEPHONE (815) 942-2920, x;..550 AVERAGE DA I LY PO\\.JER LEVEL
( M\\.Je-Ne t) 829 834 722 0
0 0
0 162
. 464 487 590 113 455.
534 646
ti No.
bate.
- a.
t-8, 781031
. s
.. ; i *.
~
- ,*.1 *.
~..
I 2
Ft totced SI* Scheduled *
'!" '\\
t:.......
N 0.Ill c
0
... ::J VI 0
Ill
'- x a.I
- J.......
a:
0 UNlt SllUTOO\\.IHS /\\NO PO\\*IER REOUCTIOllS:
REPORT HOHTtl DECEMBER I! 1980
""' I..
\\4...
0
~
O *tn H
~
c u LlcehSee 5r'cti
°'"
"O *-
~-.
. t: a.I 0...
- Event f.J"O 0"0
.c: u a:
VI 0
- o. 0
.. u
- J Report Q
. >- u EU QJ.c: ~
Vl 0
- J: V1 LJ Cl u111.1:t 1 "
- oso-01::...:o"-=,-----
u111 r tll\\/I[ Dresden I DATE January 14, 1981 COtlPlETEO IJY D. C. Maxwell TElEPllOtlE (815) 942-2920.
x-sso tause t Correctl~e *
/\\ct Ion to Prevent Rec~rrence 744 c
- 3 Refueling and chemical cleaning out,ge.
I
\\.*
\\
I f\\easoni A-Equipment tal luto (Explnin)'
b-Hrilntendnce of Tc!t t-Refuellng 1.
b-ncyulolory flcstrlcllbn t~opct~tor irdlnlnd $ llc~h9~ ~M~mlne t~Ad~lttl~ltatlv~
I
\\
J G-Opcratlonal Error It-Other (Explaln)
Method I
. l -f1at1Ua I 2-llonu.; I ~crorn 1*Au~o~ntlt Sct~m I..
~-other (Expl~ln)
Exhibit G-lnstructlons. for Preparntlon of Oatn thtry Sheet9 f~~ llc~ns~c
£vent h¢potl (
)Ff lc(ttUREG~
0161)
(
~
No.
bate
- 0.
12 801202 F
801211 F
j j
~';* :.
- /
\\
./~*.*.*-~~*}'
- . *.1
~..
I..
Ft forced S I.. Sci1edu I ed u111.q I 1111.
050_;237
~--------
UN It SllUTOO\\./HS /\\NO rmJER REDUCT I or1s*
lJlll T tl/\\11[
Dresden II RF.PORT MONT!I DECEMBER I 1980 OAT[
January 14, 1981 CO"PlETEO IJV D. C. Maxwell TELEPllOllE. (815) 942-292~.
X-550 t:-
0 Iii
.., :J 0
~ :i:
- J.......
0 72 87 45 ~o f\\eosonr N.c 0
11'1 Ill*
~
A A
3 i
I
\\
Llcehsee Event Report I
/\\-Equipment Fallura (Explnln)'
b-Hrilntendnce of Test C-Retuellng 1
~QI
µ "U
"'0
>-LI VI b-nayulotory flcsttlcllon t~opat~tor trdlnln~ g Llt~ns~ ~Momlne F~Ad~lttl~lratlv~.
I
\\
J
- c
~"<.. licensee fvent ~rlpotr (
)F,lc(NUREG-0161)
(
bate.
16'.
801220 i7; 1801218
- ii" **
- ". *1
- .'"t *:
'. '. *. ~
~..
. :. :~ /.
Ft F'otced SI * ~ehedu1ed
.' :.. ;..,., '\\
s F
UllU:l I 1111. 050-249 UNlt SlllJTOO\\.IHS ANO PO\\JER llEOUtTIOllS*
uu 1 T
- N/\\ll(DreScfen =r~n~---'-
OATE January 14, 1981 COMPLETED DY D. C *. Maxwell TEUPllOflE (815) 942-2920.
ftEPORT HONTll DECEMBER I i 980 X-550 i:,......
N 0
Ill c
0
µ
- J.
Ill co 0 IQ L. :c cu
~
0 110.87 s
15.58 F
l\\eesoni n
L 0
0 Olf-'
c: u
. ~ *;:; ~
s:. u /2.
u
- J
~*~ ~
0 1
11 I.
\\
\\
Llcehsee Event Report I A-Equipment taf luto (Explnln)
- b-Hrilnt~n~nce of Tcgt t-Refuellng 1.
I b-1\\~yulotorv l\\csttlcllon t~Opdtator tralnln~ ~ llc~ng~ tHomt~a
~~Ad~lttl~trnttvd *
\\
J
- C
°'"
. t: G.I 0 -0
- o. 0 5u u
Cause t Corrective l\\ctlon to Prevent Rec~rrence Tur~ine manually ttipped off-line to repair oil leifl!< 0°!1 1f2 c. I. v.
. e Manual turbine trip to repair E.H.Cl pump; G-Operatlonai F.rror H-Other (Explnln)
~-other (Explaln)
Exhibit G-lnstructlons. for Method:
Preparation ot Oatn
- I -t1ntrna I 2-l*onudl Scrnm j~Auio~atlc ~cr~m thtry She~t~ fr* llcen~~c
£v~nt h~potl (
)Fll~(ffUREG-0161)
(
EQUIPMENT APRM Ch.. 2/IRM Ch. 12 Scram Relay 590-:-107E Refiiel Grapple LPRM 48-33C RBM Square Rooters Rx Bldg. Inter-lock Doors Containment Vent.& Purge Valves*
CRD Accum.
42-23 (L-6)
HPCI Oil Line NATURE OF HI\\ I llTENANCE Preventive WR 1{9227 Preventive WR 1/8942 Preventive WR #6908 Preventive WR #9351 Corrective WR #10167 Preventive WR #9461.
Preventive WR #10531 Preventive WR #10248 DRESDEN UN IT 2 SAFETY RELATEP HAiNTENAl~CE-:- DECEMBER, 1980 LER OR OUTAGE NUMBER MALFUNCTlotl, CAUSE RESULT N/A N/A N/A N/A Bad Dipde on CR-120.Relay N/A N/A, N/A N/A N/A N/A N/A lewF~ses Fl & F2 en Button Pushed N/A,
N/A N/A CORRECTIVF~ACTION Replaced ki and.Kl4 relays in APRM Ch. 2.
Pre-outage ins~ection.
- Remade *cable connec.n..
Ran calibration check.
Replaced diode.
Reset open limi~ switches
& pulled orifice plugs.
Replaced accum.
Tightened screws hold-:-
ing oil supply flan-
EQUIPMENT.
NATURE OF HAlllTENANCE LPCI Reel.re.
Preventive WR 4H0001 Pump Running DP Switch LPCI 3-1501-20A Corrective WR 4H0164 Valve MO Rx Bldg. Inter-Corrective WR 4H029'4 lock.Door Cont.ainment Ven Preventive WR #9462
& Purge Vaives
CAUSE RESULT N/A Limit Switch Out of Adjustment
- Bad Diodes N/A N/A.
- Valve Would Not Operate From.
- Control Room -
Had to be Manually Turned First Would No~ Operate N/A CORRECTIVf~ACTIOH Replaced ~wl.tch & per-formed surveillance.
Adjusted limit swit~
Removed diodes until replacements arrive.
Remdved pins & orifice plugs.
EQUIPMENT.
Spare CRD Spare CRD Spare CRD Diesel Generato
- NATURE OF MAlllTENAHCE Preventive WR /18359 Preventive WR, /18360 Preventive WR /18361 Corrective WR 4110022 Diesel Inter.:..
P~~ventive WR /110191 lock Door Diesel Generato Preventive WR /19741 D/G Interlock*
Corrective WR /110173 Doors Spare FW Check.
Preventive WR #9742 Valve DRESDEN UN IT 2/3 SAFETY RELATED MAINTENANCE - DECEMBER, 1980 LER OR.OUTAGE NUMBER MAL FUNt T Iott*
CAUSE RESULT N/A
- N/A N/A N/A N/A N/A Misatigned Couplin Running Hot
& Noisy.
N/A
- N/A N/A
- N/A Bad Diodes on Blew Fuses CR-:-120 Relays
& F2
. N/A.
N/A Fl CORRECTIV~~ACTION Rebuilt ddve.
Rebuilt drive.
Rebuilt drive.*
Adjusted motor.
Troubleshoot - no prob-lem..
Performed quarterly
'inspection.
Replaced diodes.
Cut 0-ring gr6ove &
~rep ~or installation.
SUMMARY
OF OPERATING EXPERIENCE UNIT ONE.
DECEMBER, 1980 12-1 to 12-31 Unit One* was shutdown for the entire month, awaiting* license approval for the chemical cleaning.
Major work scheduled to be completed following chemical cleaning is as follows:. HPCL installation for ECCS upgrading, equip-ment upgrade to IEEE 279, major in-service* inspection, and refuel.
SUMMARY
OF OPERATING EXPERIENCE
. UNIT TWO 12-1 to 12-4 12-5 to 12-12 DECEMBER, 1980 Unit Two started the month operating at.a power level of 350 MWe.
On December 2. at 2215 hours0.0256 days <br />0.615 hours <br />0.00366 weeks <br />8.428075e-4 months <br />, a reactor scram and turbine trip occurred because of moisture condensation in the turbine vibration meter.
The reactor was made critical on December 3 at 2ll2 hours and scrammed. December 4 at. 0418 hours0.00484 days <br />0.116 hours <br />6.911376e-4 weeks <br />1.59049e-4 months <br />.because of.a SRM Hi Hi.
The*reactor was made critical.on December 4 at 2054 hours0.0238 days <br />0.571 hours <br />0.0034 weeks <br />7.81547e-4 months <br /> and was manually scrammed at 2242 hours0.0259 days <br />0.623 hours <br />0.00371 weeks <br />8.53081e-4 months <br />.be-
- cause the condenser vacuum was set too low.
The.reactor was made critical December 5 at ll26 hours, and the Unit was placed in service at 2307 hours0.0267 days <br />0.641 hours <br />0.00381 weeks <br />8.778135e-4 months <br />, reaching a power level of 400 MWe.
On December ll at 0554 hours0.00641 days <br />0.154 hours <br />9.160053e-4 weeks <br />2.10797e-4 months <br />, the reactor was.manually scrammed because.
the SDV Hi Hi alarm would not reset:*. The reactor was.made critical December ll at 2132 hours0.0247 days <br />0.592 hours <br />0.00353 weeks <br />8.11226e-4 months <br /> and manually scrammed December 12 at 0229 hours0.00265 days <br />0.0636 hours <br />3.786376e-4 weeks <br />8.71345e-5 months <br /> because,. again, the SDV Hi Hi alarm would not reset.
The reactor was made critical on '):he same day at 1830hours.
.,. 12-13 to*l2-31 The Unit was placed.in service at 0254 hours0.00294 days <br />0.0706 hours <br />4.199735e-4 weeks <br />9.6647e-5 months <br /> on December 13 and operated through-out the remainder of the month, reaching a power level of 360 MWe, with a capacity factor of 34.95% an*d an availability of 84.16%.
SUMMARY
OF OPERATING ~XPERIENCE
- 12-1 to 12-23 UNIT THREE DECEMBE~, 1980 Unit Three started the month operating at a power level of 814 MWe.
On December 20 at 0008 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, the turbine was manually tripped so that the Maintenance
- Department could install the TMI modifi-cations, and the reactor was manually scrammed at 0117 hours0.00135 days <br />0.0325 hours <br />1.934524e-4 weeks <br />4.45185e-5 months <br />.to test the SDV.
modific.ations.
The I.M. Department was performing surveillances on the*Rx controls and accidentally scrammed the Rx at 0915 *on December 23.
- 12-24 to 12-28 The Rx was inade critical on December 24 at 0510 hours0.0059 days <br />0.142 hours <br />8.43254e-4 weeks <br />1.94055e-4 months <br />, and the Unit was placed in service at 1432 hours0.0166 days <br />0.398 hours <br />0.00237 weeks <br />5.44876e-4 months <br />, reaching a power level of 625 MWe.
The Unit was.manµally tripped off-line.at 0255 hours0.00295 days <br />0.0708 hours <br />4.21627e-4 weeks <br />9.70275e-5 months <br /> on December 28 to repair ati EHC pump and leak. (Rx.remained critical).
12-28 to 12-31 The-Unit was placed in. servic.e on December 28 at 1830 hours0.0212 days <br />0.508 hours <br />0.00303 weeks <br />6.96315e-4 months <br /> and operated through the remainder of the month, reaching a power level of 690 MWe*
with a capacity facto~ of 53.68% and an avail-ability pf 83.07%.