ML20073F335
| ML20073F335 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 03/02/1983 |
| From: | Might A INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG |
| To: | |
| Shared Package | |
| ML20073F307 | List: |
| References | |
| NUDOCS 8304150472 | |
| Download: ML20073F335 (6) | |
Text
.
U.4 %
L*
CPI.u-NC DATA iI?CR-
.,,C.... m.o.
50-315 w
3-2-83 v,a. --i_
d O.e,-.--,
v.
A. Might
'5 " _::.'3.C.N :_ (616)465-5901 C2.=*:,'"..'.~,,~..'."~
DONALD C. COOK 1
Not:5
- 1. U rJ: N w...
R por-4.s. 3..:oc:
FEBRt.lARY 1983 3250
- 3. U--,,ed Th--! ?swer (MW:):
1089
- 4. N =e-At: P-- ;(Cro:s 5tw ):
1054
- 5. Desi;= ZI::=i=1 R::in;(Ne:11We):
1080
- 6. M " su:::Dependste Q :df (Grou 31We):
7 1044
- 7. '.iaxi=== Dep: ddl= C:p:= / (Net MWe):
S. If Ch:=;es 0:=::in Qpsci:y R::i:;s (1::=s Ne=h:: 3 Th:2c;h 7) Sine: L=: Report. Give R:: sons:
4
- 9. Power Leve! To Whid R===i=:d.If Any (N:: MWe):
T
- 10. R=: sons For R..=i:: ices.lf Asy:
4 This Month Y:.4o. Cats.
Cu. =I::ive
- 11. Hours != Repar:ia; ?:: icd 67?
1416 71,544
- 12. Nu::.i::: Cf Hoc:s R==:r was Cri:i=1 672 1416 53.297.6 0
0 463
- 13. Re::: r R e:ve Shu::iowr. H u :
672 1416 52,128.9
- 14. Hours Cc.:=:ar ca. Lier
- 15. U..i: R::::ve Shutdawu Ect:=
0 0
321 i
- 16. Cross T:w _l E==::y Cer::=::d (MwH) 2.154.510 4.526,094 151,828,654 g4 wros. n.
- :: ;y Ce....~...u r,.'.tW'J.)
709,700 1,488.980 49.924,830 685.688 1,437.809 48,031,310
- 13..'i et :_... '...., Cen....s (.'.'.W"c.)
100 100 80.2
- 19. Unit Sem:: F:::or 100 100 80.2
- 20. Uni: Av ilnili:y F:::or 97.7 97.3 67.9
- !. Uni: Q:scity 7:::=r (Usin; MOC. Net) 96.8 96.3 64.8
- 22. Unit Cc: city F:::or(Usin; CER Net) 0 0
8.3
- 23. Uni: For::d Cu::;e R:,
- 24. Sh::dowr.s Schedu!:d Over Nx: 5 Mon:hs (Type. 0:te.:nd 0 =:fon of I:ch1:
1 Week Surveillance Outage scheduled for March 25, 1983, and Refuelin'g Outage scheduled for July 8.1983.
- 25. If Sht: Down Ar Er.d Of Re-crt ?:-iod. Isti==:ed D:te o(5ts: up:
. 25. Units In Tes: S::: s P: or to C:====i:1 Ope =:icaI:
Fore =st Achieved INIT:A L C7.IT;CA LI~Y I...TIA t.. :.. e..-.
v.
oi C O... -.,...
3 2.
A..,,.,.
.....u
..s
.w.
tu;7;g 8304150472 030314 PDR ADOCK 05000315 R
PDR f
--m
~
AVERAGE DAZLY UNET POWER LEVEL 00CXET NO.
50-315 UNIT 1
DATE 3-2-83 CDMPLETED BY A. Might TELEPHONE (616)465-5901 MONTH February, 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-Net)
(MWe-Net) 1 1035 17 1034 2
1034 18 1036 3
1032 19 1030 1
4 1011 20 1024 5
672 21 1036 6
1034 22 1037 I
7 1035 23 1038 8
1035 24 1037
~
9 1035 25 1034 10 1035 25 1031 11 1031 27 1037 12 1034 28 1037 13 1035 29 14 1035 30 15 1034 31 16 1033 4
INSTRUCTIONS On this fonnat list the average daily unit power level in MWe-Net for each day in the reporting month. Ccmoute to the nearest whole megawatt.
50-315
.t DOCKETNO.
UNIT SilUTDO'.VNS AND POWER REDUCTIONS UNIT NAME D.C. Cook - Unit i DATE 3-14-83 REPORT MON 111 February, 1983 COMPLETED RY B.A. Svensson TELEPilONE 616-465-5901 PAGE 1 of 1 i
.3 g
'k ifk Licensee
,E e, gs cause a rinseceive No-Date g
5g 5
3g&
Event g3 g-3 Auieni so g'
$E j ;y3 g Repos #
un O Prevent Recussence d
194 830204 F
0 A
4 fl. A.
CH ZZZZZZ Reactor power was reduced to 56% to remove the west main feed pump turbine from service to repair tube leaks in the F.P.T. condenser.
One tube was plugged. Reactor power was returned to 100% the same day.
t 2
3 4
1:: Fosced Reason:
Me:Inid:
Exhible G Instinctiims S: Schedulcel A Eninipinent Failnie(Explain) 1 Manual for Preparatiini of Data li Maintenance ni Test 2 Manual Scrain.
Enisy Sheets foi 1.icensee C-Refueling 3 Antennatic Scrani.
Eveni Reposi (l.l!R) File INURI:G-D Regulainiy Rest icilon 4-Othes (Explain) 0161)
E-Operator Daining& License lixaniination F-Adudnistrative 5
G-Operational Ibsos llixplain) lishibii 1 - Sanic Souice 19/77) ll Olher (Explain)
UNIT SHUTDOWNS AND POWER REDUCTIONS
~
INSTRUCTIONS Thts report should desence all plant shutdowns dunng the m accordance with the table appearing on the report form.
report penod. In addition. tt should be the source of explan-If category 4 must be used. supply bnef comments.
anon of ugmficant dips m average power levels. Each ucm.
Scant reducuan m power level (greater than 20% reduction LICENSEE EVENT REPORT =. Reference the applicacie in average daily power level for the preceding 24 hnurs) rep rtable occurrence pertammg to the outage or power reducuen. Enter the nrst four parts (event year. sequennal should be noted. even though the urut may not have been shut down completely! For such reductions in power level.
report number. occurrence code and report type) of the five the durst on should De listed as zero, the method of reduction part designation as desenbed in item 17 of Instrucuons for should be listed as 4 (Other), and the Cause and Correcuve Preparauon of Data Entry Sheets for Licensee Event Report Acuon to Prevent Recurrence column should explam. The (LER) File (NUREG0161). This informanon may not be Cause and Correcuve Action to Prevent Recunence column immediately evident for all such shutdowns. of course, smee should be used to provide any needed explanation to fully further invesugation may be required to ascertam whether or desenbe the circumstances of the outage or power reduction.
not a reportable occurrence was involved.) If the outage or power reducuen wt11 not result in a reportable occurrence.
NUMBER. This column should indicate the sequential num-the poutive indication of this lack of correlanon should be bet asugned to each shutdown or ugm6 cant reduction m power n ted as not applicable (N/A).
for that calendar year. When a shutdown or ugmilcant power SYSTEM CODE. The system in which the outage or power reduction begms in one report penod and ends m another.
reduction ongmated sh'ould be noted by the two digit code of
~
an entry should be made for both report penods to be sure sll shutdowns or nemilcant power reductions are reported.
Exhibit C. Instructions for Preparation of Data Entry Sheets Until a urut has ach'teved its first power generation, no num-for Licensee Event Report (LER) File (NUREG.0161).
ber should be asugned to each entry.
Systems that do not fit any existing code should be deugna-ted XX. The code ZZ should be used for those events where DATE. This column should mdicate the date of the start a system is not applicable.
of each shutdown or ugnincant power reducuen. Report as year. month, and day. August 14.1977 would be reported COMPONENT CODE. Select the most appropriate component u 770814 When a shutdown or ugmficant power reducuen ftom Exhibit ! Ltstrucuens for Preparanon of Data Ent:3 begms m one report penod and ends m another, an entry should Sheets for Licensee Event Report (LER) File (NUREC.01611.
be made for both report periods to be sure all shutdowns using the followmg entiena:
or ugmficant power reductions are reported.
TYPE. Use "F' or "S" to indicate either " Forced" or " Sche.
duled." respectively, for each shutdown or significant power B.
If not a component failure, use the related component:
reducuon. Forced shutdowns include those required to be e.g.. wrong valve operated through error: list valve as mitiated by no later than the weekend following discovery component, of an off normal condinon. It is recogmzed that some judg-ment is reqmred in categonzmg shutdowns in this way. In C.
If a chain of failures occurs, the first component to mal-general, a forced shutdown is one that would not have been function should oc listed. The sequence of events. includ-completed in the absence of the condition for which corrective ing the other components which fail should be desenbed action was taken.
under the Cause and Corrective Action to Prevent Recur-rence column.
DURATION. Self-explanatory. When a shutdcwn extends Components that do not fit any existmg code should be de-beyond the end of a report penod. count only the tune to the signated XXXXXX. The code 777777 should be used for end at the report penod and pick up the ensutng down time events where a component designation is not applicable.
m the followmg report penods. Report duranon of outages munded to the nearest tenth of an hour to facilitate summation.
CAUSE & CORRECTIVE ACTION TO PREVENT RECUR-The sum of the total uutage hours plus the hours the genera-RENCE. Use the column in a narrative fastuon to amplify or for was on line should equal the gross hours m the reportmg explain the circumstances of the shutdown or power reducuen.
paiod.
The column should include the specific cause for each shut-down or significant power reduction and the immediate and REASON. Categonze by letter deitynanon in accordance contemolated long term corrective acnon taken if appropri-with the table appearing un the report form. If category H ste. This column should also be used for a desenption of the must be used.suppiy bnet eumments.
ufety.re!sted corrective maintenance performed dunna the utage r p wer reducuon includmg an identification of METHOD OF SHUTTING DOWN THE REACTOR OR REDUCING POWER.
Categonze by number dengnation the entiesl path acuvtty and a report of any single release et radiosetmty or single radiation exposure speettiesily asscet-1%ie that this differs from the Edison Eleetne insutute sted with the outage which accounts for more than 10 percent IEEI) detimtions of " Forced Partial Outage" and " Sche, of the allowable annual values.
auled Partial Outap." For these term >. EE! uses a change or For long textual reports contmue narranve on separate paper
.t0 MW as the break romt. For larcer power reactors.30 MW 2nd reterence the shutdown or power reducuun foi thu is im small a hange to wariant nplanation.
narranve.
GLI
yy), & !MCH. ELECTRIC C0.
Docket No.: 50-315 qfd@MOf Unit Name: D. C. Cook Unit 1, g
J Completed By: C. E. Murphy ga 101983 Telephone: (616) 465-5901 Date: 3/10/83
.'0 ' ' N Li j U bac Page: 1 of 1
" bbMk
' ' ' MAllAGEMAL --
10NTHLY OPERATING ACTIVITIES - FEBRUARY 1983 Highlights:
i The Unit remained at 100% power during this reporting period except for those periods of time when the Main Turbine Control Valves were tested and for a short duration when a Reacto, Power reduction to 56% was started at 1930 on Feb. 4 to repair a leaking Condenser tube in the West Main Feedpump Condenser. The Reactor Power was returned to 100% at 2310 on Feb. 5.
These are addressed in the Summary.
The gross electrical generation for the month was 709,700 MWH.
Summary:
i 2/1/83 The Steam Dump Valve to the #1 Steam Generator Stop Valve (MRV-212) was inoperable for a 3.75 hour8.680556e-4 days <br />0.0208 hours <br />1.240079e-4 weeks <br />2.85375e-5 months <br /> period for maintenance to repair steam leaks.
2/2/83 The East Essential Service Water Pump was inoperable for a 3 hour3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> period for Maintenance to repair the discharge strainer and backwash valve.
2/5/83 The West Main Feedpump was inoperable for a 10 hour1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> period for Maintenance to repair a tube leak in the condenser.
2/7/83 The East Essential Service Water Pump was removed from service for a 46.25 hour2.893519e-4 days <br />0.00694 hours <br />4.133598e-5 weeks <br />9.5125e-6 months <br /> period for Maintenance to repair the discharge strainer.
2/11/83 95% power at 2250 hours0.026 days <br />0.625 hours <br />0.00372 weeks <br />8.56125e-4 months <br /> for turbine valve testing.
Returned to 100% power at 0200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br /> on Feb. 12.
2/17/83 The #1 Boric Acid Transfer Pump was inoperable for a 11.75 hour8.680556e-4 days <br />0.0208 hours <br />1.240079e-4 weeks <br />2.85375e-5 months <br /> period to repair a discharge valve.
2/19/83 95% power at 2215 hours0.0256 days <br />0.615 hours <br />0.00366 weeks <br />8.428075e-4 months <br /> for turbine valve testing.
Power was held at 95% per systems request, due to load not needed.
Power was returned to 100% at 0554 hours0.00641 days <br />0.154 hours <br />9.160053e-4 weeks <br />2.10797e-4 months <br /> on Feb. 20.
2/26/83 95% power at 0019 for turbine valve testing.
Returned to 100%
power at 0324 hours0.00375 days <br />0.09 hours <br />5.357143e-4 weeks <br />1.23282e-4 months <br />.
. - -. ~
.~
s o
DOCKET N0.
50 - 315-UNIT NAME D. C. Cook - Unit No. 1 DATE 3-14-83 COMPLETED BY B. A. Svensson TELEPHONE (616) 465-5901 PAGE 1 of 1 MAJOR SAFETY-RELATED MAINTENANCE FEBRUARY,1983 M-1 The No. 1 S/G stop valve dump valve, MRV-212, was leaking by.
Replaced the valve stem, seat, cage, plug and gasket seat and repacked the valve. Had the valve tested.
M-2 No.1 boric acid transfer pump mechanical seal failed.
In-spection revealed a pump bearing failure also.
Replaced the pump and had the new pump tested.
H-3 The East ESW strainer would not shift. Discovered that the backwash outlet valves, WRV-761 and 771 were leaking by.
Re-placed the seat rings and drive shaft bushings in both valves.
Cleaned both valves and had them tested.
M-4 CS-416, the No.1 boric acid transfer pump isolation valve to the boric acid filter was leaking by.
Replaced the diaphragm valve bonnet and diaphragm.
C&I-l Level and flow transmitters manufactured by ITT - Barton Company were modified to include soldered connections to strain gauges, per Barton Company instructions. Model 764, serial numbers 439, 376 and 1023 were so modified.
I