Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML14030A293 +
- ML17309A427 +
- RS-14-029, Annual Report on the Meteorological Monitoring Program at the Braidwood Nuclear Power Station 2011 +
- ML20006E601 +
- ML19345D398 +
- ML20070L743 +
- ML20079H369 +
- ML20076G196 +
- ML20117E096 +
- ML20133B790 +
- ML20129G687 +
- ML20198J535 +
- ML20206J633 +
- ML20203K408 +
- ML20209D029 +
- ML20216J925 +
- IR 05000263/2017002 +
- LIC-97-0137, Monthly Operating Rept for Jul 1997 for Fort Calhoun Station +
- IR 05000327/2022004 +
- 05000461/LER-1989-022, :on 890526,insertion of Manual Scram Signal Caused Reactor Water Level to Drop.On 890601,valve 1FW004 Failed to Shut in Response to Control Signal.First Event Caused by Faulty servo-amplifier Board +
- 05000293/LER-1996-005, :on 960419,automatic Scram Occurred Due to Turbine Vibration During Planned Power Reduction.Turbine Vibration Trip Setting That Initiates Trip of Turbine Due to High Vibration Changed +
- 05000373/LER-1984-046, :on 840727 & 28,reactor Water Cleanup Sys Isolated on High Differential Flow While Deisolating Filter Demineralizer C.Caused by Partial Loss of Sys Flow Through Open Filter Drain Valves.Valves Closed +
- 05000461/LER-1992-001, :on 920104,failure of B Phase Main Power Transformer Led to Turbine Generator Trip & Reactor Scram. Caused by Internal Fault Leading to Transformer Replacement +
- 05000277/LER-1990-037, :on 901119,discovered That TS Violation Occurred as Result of Not Taking Appropriate LCO Actions When IRM Channels for RPS a Trip Circuit Fell Below Required Amount.Caused by Procedural Weakness +
- ML20045F988 +
- 05000311/LER-1994-008-02, :on 940629,reactor Trip Occurred Due to SG 23 lo-lo Level During Return to on-line Power Operation. Operability Checks & Troubleshooting of SG Level Control Verified Proper Response +
- 05000249/LER-1988-011, :on 880412,Group II Primary Containment Isolation Occurred.Caused by Procedural Inadequacy.Power Restored to Monitors & Isolation Reset.Procedural Change Being Investigated +
- 05000263/LER-1917-001, Regarding Reactor Scram and Group II Isolation Due to 11 Reactor Feed Pump (RFP) Removal from Service with 12 RFP Isolated +
- IR 05000275/1987026 +
- ML17059B820 +
- ML011630382 +
- IR 05000271/1985098 +