Responds to Requesting Notice of Enforcement Discretion Be Issued Pursuant to NRC Policy Re Exercise of Discretion for Operating Facility.Action Will Normally Be Taken to Extent Violations Involved
ML17059B820
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 01/09/1998
From: Hehl C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Sylvia B
NIAGARA MOHAWK POWER CORP.
References
NOED-98-1-001, NOED-98-1-1, NUDOCS 9801220143
Download: ML17059B820 (8)


Text

January 9,. 1998 Mr. B. Ralph Sylvia Executive Vice President Generation Business Group and Chief Nuclear Officer Niagara Mohawk Power Corporation Nuclear Learning Center 450 Lake Road Oswego, NY 13126

SUBJECT:

NOTICE OF ENFORCEMENT DISCRETION FOR NIAGARAMOHAWK POWER CORPORATION REGARDING NINE MILE POINT UNIT 2 (NOED No, 98-1-001)

Dear Mr. Sylvia:

By letter dated January 8, 1998, you submitted a written request that the NRC exercise discretion not to enforce compliance with the actions required in Technical Specification (TS) 3.0.3 and TS 3.8.1,1 Action e. That letter documented information previously discussed with the NRC in a telephone conversation at approximately 1100 hours0.0127 days <br />0.306 hours <br />0.00182 weeks <br />4.1855e-4 months <br /> on January 7, 1998.

During that teleconference you stated that on January 7, 1998 at 0441 hours0.0051 days <br />0.123 hours <br />7.291667e-4 weeks <br />1.678005e-4 months <br />, inoperable containment gaseous and particulate radiation monitors caused Nine Mile Point Unit 2 to enter TS 3.0.3 which requires the plant to be in the Startup mode within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

Additionally, TS 3.8.1.1 Action e requires the plant to be in Hot Shutdown within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

You requested that a Notice of Enforcement Discretion (NOED) be issued pursuant to the NRC's policy regarding exercise of discretion for an operating facility, set out in Section Vll.c. of the "General Statement of Policy and Procedures for NRC Enforcement Actions" (Enforcement Policy), NUREG-1600, and be effective for the period beginning on January 7, 1998 at 1123 hours0.013 days <br />0.312 hours <br />0.00186 weeks <br />4.273015e-4 months <br /> and ending January 8, 1998 at 0900 hours0.0104 days <br />0.25 hours <br />0.00149 weeks <br />3.4245e-4 months <br />.

The failure of Division II Containment Monitoring System (CMS) while Division I CMS was out of service for preplanned maintenance forced the entry into TS Limiting Conditions for Operation 3.0.3.

As a result, at 0441 hours0.0051 days <br />0.123 hours <br />7.291667e-4 weeks <br />1.678005e-4 months <br /> on January 7, 1998, NMPC entered TS 3.0.3, which required initiating actions within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and the plant to be in the Startup mode within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

The Division I Emergency Diesel Generator (EDG) was out of service for preplanned maintenance beginning at 0654 hours0.00757 days <br />0.182 hours <br />0.00108 weeks <br />2.48847e-4 months <br /> on January 6, 1998. When the Division II CMS became inoperable at 0441 hours0.0051 days <br />0.123 hours <br />7.291667e-4 weeks <br />1.678005e-4 months <br /> on January 7, 1998, TS 3.8.1.1 Action e was entered, which required the plant to be in Hot Shutdown within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

NMPC requested enforcement discretion from these Specifications. until 0900 hours0.0104 days <br />0.25 hours <br />0.00149 weeks <br />3.4245e-4 months <br /> on January 8, 1998, to make equipment repairs and perform system testing.

NMPC safety rationale for requesting the NOED was that: (1) there is less risk in continued operation than in forcing an unnecessary plant challenge by taking the plant to Shutdown to comply with the requirements of TS 3.0.3 and TS 3.8.1.1 Action e; (2) the drywell floor and equipment drain tank fillrate monitoring systems remained capable of identifying leakage; and (3) the NRC Improved Technical Specification for a NMP2 type plant would have allowed a 30-day repair period for the CMS problems.

nod'1 980i220i43

'PSOf0'P PDR ADQCK 050004i0 P

PDR OFFICIAL RECORD COPY II!III!Illlilllmliilllllllllllll iE:Ol

B. Ralph Sylvia The staff has reviewed the NMPC request to grant enforcement discretion to permit restoration of necessary equipment without the need to expose the plant to an unnecessary shutdown.

The NOED is intended to avoid undesirable transients as a result of forcing compliance with the license condition and, thus, minimize potential safety consequences and operational risk. Additionally, discretion was based on the information exchanged during the telephone conference which included: (1) the further commitments to obtain and analyze drywell atmospheric grab samples every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, and increase the frequency of monitoring the primary containment equipment and floor drain leakage detection systems to every 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> during the period of discretion; (2) the fact that the Improved Standard Technical Specifications (ITS) allow continued operation for up to 30 days with no required drywell atmospheric monitoring system operable, provided grab samples are taken every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

On the basis of the 'staff's evaluation of your request, the staff has concluded that a NOED is warranted and that this action involves minimal or no safety impact and no adverse radiological impact on public health and safety.

Therefore, we have exercised discretion not to enforce compliance with the requirements of TS 3.0.3 and TS 3.8.1.1 Action e for the period from January 7, 1998 at 1123 hours0.013 days <br />0.312 hours <br />0.00186 weeks <br />4.273015e-4 months <br /> until January 8, 1998 at 0900 hours0.0104 days <br />0.25 hours <br />0.00149 weeks <br />3.4245e-4 months <br />.

This letter documents our telephone conversation on January 7, 1998 when we orally issued this notice of enforcement discretion at 1123 hours0.013 days <br />0.312 hours <br />0.00186 weeks <br />4.273015e-4 months <br />.

We understand that the condition causing the need for this NOED was corrected by you causing you to exit from the TS 3.0.3 and TS 3.8.1

~ 1 Action e and from this NOED on January 7, 1998 at 1820 hours0.0211 days <br />0.506 hours <br />0.00301 weeks <br />6.9251e-4 months <br />.

Finally, the staff notes enforcement discretion would not have been required had the ITS been in place.

It is recognized that NMPC is in the process of converting to the ITS, never-the-less, every effort should be made to expedite this conversion.

Moreover, as stated in the Enforcement Policy, action will normally be taken, to the extent that violations were involved, for the root cause that led to the noncompliance for which this NOED was necessary.

Sincerely, Original Signed by:

Charles W. Hehl, Director Division of Reactor Projects Docket No. 50-410 NOED No. 98-1-001

B. Ralph Sylvia CC:

R. Abbott, Vice President & General Manager - Nuclear C. Terry, Vice President-Safety Assessment and Support J. Conway, Vice President - Nuclear Engineering K. Dahlberg, Vice President - Nuclear Operations D. Wolniak, Manager, Licensing J. Warden, New York Consumer Protection Branch G. Wilson, Senior Attorney M. Wetterhahn, Winston and Strawn J. Rettberg, New York State Electric and Gas Corporation P, Eddy, Electric Division, Department of Public Service, State of New York C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law J. Vinquist, MATS, Inc.

F. Valentino, President, New York State Energy Research and Development Authority J. Spath, Program Director, New York State Energy Research and Development Authority

0

B. Ralph Sylvia Distribution:

H. Miller, RA/W. Axelson, DRA (1)

R. Zimmerman, ADPR, NRR J. Goldberg, OGC J. Lieberman, OE (OE MAIL)

D. Holody, EO B. Fewell, RC D. Screnci, PAO N. Sheehan, FPAO Region I Docket Room (with concurrences)

Nuclear Safety Information Center (NSIC)

PUBLIC R. Correia, NRR F. Talbot, NRR L. Doerflein, DRP S. Adams, DRP M. Oprendek, DRP R. Junod, DRP NOED File Distribution: (VIAE-MAIL)

M. Leach, OEDO B. Norris, SRI S. Bajwa, NRR D. Hood, NRR K. Cotton, NRR M. Campion, Rl Inspection Program Branch (IPAS)

DOCUMENT NAME: G:iBRANCH1iNOED9801.WPD To receive e copy of this document. indicate in the botu "C

Copy without attachment/enclosure "E

~ Copy with attachment/enclosure N

~ No copy OFFICE RI/DRP HQ/NRR., g,gt.'s y Rl/RC RI/DRP NAME LDoerflein gg ~r SBajwa/sA BFewe CHehl DATE 01/ 7/98 01/ '/ /98 01

/

OFFICIAL RECORD COPY 01/

/98