i OPERATING DATA REPORT 50-F/5 DOCKET NO.
DATE 35 67 o'1 COMPLETED BY
30 MO
- 3. Linessed TW Power (MWt):
l
- 4. Nemspiste Rating (Gross MWe):
/M j
S. Doelpi Electrieel Rating (Net MWe):
/dVO l
- 6. Maximan DependeWe Capacity (Gross MWe):
/015
- 7. Maximuun DependeWe Cepesiry (Not MWe):
MO I
S. If Changes Ocent in Cepecify Retings (Items Nunnber 3 Through 7) Since Last Report, Give Reesses:
A/A
- 9. Power 14 vel To Whish Restricted,If Any (Not MWe):
A/8
- 10. Reasses For Restrictions.If Any:
M This Meath Yr..ee.Dete Commistive l
II. HouseIn Rependes Peted 7000 Y3Y3 O
/00'777,O
- 12. Mm.ber of Hean Roemer Wu C;ine I 375. y 9'33.7 G7 349, 9' Is. Reemse Remove ShWdown Howe d.O dO d 02/' F I4. Heun Geman., on thm aVd. 5 793.7
/o 7. 4 7 #. 5
~
- 13. Unit Rasse,e Sheedown Heere OO 0,O O. A
- 16. Goes Thermal Enugy Genented (WWH)
W2,559
/.9'//, 765
/90 055,9'/3
- 17. Geens Electrical Energy Generated (MWH)
/M 952
/o2/,304
/e/, cW1 O/8 l
- 18. Not Elastrieel Emery Gemeested (MWM)
//4 553 5 52. %27
/a9. O M 6 9F j
- 19. Unit Servios Feces, 33.7 E3 66.8 i
- 20. Unit Avelisbelty Fester 33.7
/I 3 00 8
- 21. Unit Capacky Facter (Using MDC Net)
/0.O
/2. V 57,3
- 22. Unit Capacity Feeter (Using DER Net)
/h. O
/2. Y 57,3 i
- 23. Unit Fereed outage Rete
/7. J a/. 7
/% N i
- 26. Sheedowns Scheduled Over Next 6 Months (Type. Dete. sed Duretion of Eschi:
i A[h i
- 25. If Shot Down At End Of Repart Period. Estimated Date of Startup:
N 3
- 26. Unite In Test Status (Prior to Commercial Operation):
Foreenet Achieved i
i INITIAL CRITICALITY INITIAL ELECTRICITY g
COMMERCIAL OPERATION h
}
8507180156 850630 Y
4 PDR ADOCK 05000295 h
R PDR (4/77) l
AVERAGE DAILY UNIT POWER LEVEL
~
DOCKET NO.
5l0 UNIT 95 0707 DATE COMPLETED BY
'I l/S /
lA)?YbAOW TELEPHONE
/[
MONTH DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)
(MWe-Net)
~/[M
~M 37 I
WY
' lh gg 2
/-
38
~
39 3
NY 4
20
~bD E/$y gg
~ A/
'/5c2 22 6
~Ob kj3 23 7
Y[O
~
8 24 b
25
~AO GA/
26 to
[8 3 0
~
11 27
'/
-M
- g 12
~!
~/
13 29
~
14 30
~ O!
3, 15
~
16 INSTRUCTIONS On this format, list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole inegawatt.
(9/77)
1 9
- d M
l 0
h,ip, s
w 1"
e i
n
.m y
_n e
d6 f.h55
@h E e
si
( p v 4 1
%i
= =p t d $d be 2
s 4
ggg v
all
,gg*$m 4 j g ]g j$ 1 g ~
{d j l-li8 PI e.
ma ini! !
pt{
5 3D BM4
~
2h5 D ]$kl 1
9 Id
,i we$moa k%
Y 113it 9
Cs k!!!!!!
~
tll h
I i
er i j h b,e e,
w e
} d{I 18 31h 9
W W
g%4 9
4 5@
m.%
n le
=m m el da n(
w t
i i
eee e
e 52 0
'Q 0
54 E
9%
9 4
b C4 g
4 1
OPERATING DATA REPORT NN DOCKET NO.
DATE
%5 67 &
COMPLETED 3Y 6 Host:A TELEPHONE (3 237wontvM 4
j OPERATING STATUS OM I
O h
- 1. Unit Names:
- 2. Reportins Forted occo fs5 oro 01 To B400 35 O(o 30
- 3. Llosased Thennal Power (MWt):
M50
- 4.." - - - _ _;'^ Rating (Gross MWe):
IOB5
- 5. Design Electrical Rating (Net MWe):
1046
- 6. Maaknami E;" "- Capacity (Gross MWe):
IM l
- 7. Ma=h-Dependable Capacity (Net MWe):
/046
- 8. if Chengse Occur in capacity Ratings (Itenis Museber 3 'I1mough 7) Since Last Report, Give Reasons:
rin NA
- 9. Power Level To Which Restricted. If An Net MWe):
- 10. Reesees For Restrictions,If Any:
This Month Yr..to.Dete Cuministive
- 11. no.:in me,= time P iod 13 0.0 clBLl3.0 9450.0
- 12. Nussber Of Hours Reactor Wu Cr'itical 770.O 4324.1
/n R 8 W i
- 13. React = Resem shWdown How.
~0. O O.O aAI
- 14. nours Genersta on.Lhm 720.O 43 flo.3 68, oll,7 J
1s. Unit amem shesdown use,s O.O O. O 0.O
- 16. Geess Therunel Ensegy Generated (MWH) 2,147,993 13,510,634 19'L/oIO.978
- 17. Gross Electrieel Energy Generetad (MWH) 705,IL
- 4. 4 I f. 4 33
/n3.371193
- 18. Et Elsstrieel Energy Geneseted (MWH) 67.t 9RO 4,439,5 iE M tai,714
- 19. Unit Service Faces, too.O 44.4
'7A.O 2o. Unit Avenishaity rect.
100.0 49.4 7a.0
- 21. Unit Capacity rector (Usia$ MDC Net)
M3 9%9 (30 8 I
- 22. Unit Capacity Factor (Using DER Net)
N.S QM 60,K
- 23. Unit Forced outeos Rate O.O d Ll.
No. R 34.
Scheduled Over Next 6 Months erdember /o 1%5 is the s(Type.Dete.end Dwetion of Each):ic nett Rfuehm cheduled datedbr f OttlOCd d
O
- 25. If Shut Down At End Of Report Period.Estionated Date of Startup:
1
- 26. Units in Test Status (Prior to Cosnmercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY g
COMMERCIAL OPERATION
.i a
(9/77)
r-
~
l AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
El0A} ! Ib b UNIT 65 07 09 DAR COMPLETED BY (15 //l Yb M TELEPHONE li d MON 111 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe Net)
I
,7 R%
96 0 is 2
95/
945 3
9 99 96 5 2o 4
9V5 9&c/
2, s
99'/
96 3 22 b
7 23 9V3 952 2<
s 9
25 9nt
%9 u
no 9V8 901 2,
1s W/
883 u
,2 13 29 I[
30 34 15 31 9tol INSTRUCTIONS On this format, list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/77)
30.3dV UNITSHUTDOWNS AND F0WER REDUCHONE y;3,v umt 2.
/
DATE e6 07 09 coggptstga gy Gexer /kishh REF06tTt00 NTH g-TE1.EF900NE /3f2)MEFV '30 1
4
!)
3 n
.!I 1 *gj use-se 3
n c
acarecow i
}gg Ewas gj No.
Dese
{
3 Action to d
al jdg R8Purt #
eU u
p,,,,,,g c.,,,,,
g 4
6 i
g gh
{%[
Cxbnf purnp ciI a0bbn.
~
~'
~
i
- /
i
~
~
I l
i I
l A
i n
j 5: ScheduleJ..*
^1:
3 4
I
"".n*..d F: Forced Reason:
Exhibit G-Instructions A Equipnient Failure (Ezelain) 9
..g for Prepwation of Data i
B-Maintensees of Teof ; '
2-Manual seras Entry Sheets for Licensee c Refueling 3-Aute scram Event Repw (LER) File (NUREG-D-Repderwy Restricolon 4-continued 0161)
E Operator Training & Usenes Emandnesion f_NN'*d'**d I
l.
F Adeninistrative 5
G4Ferational Error (Emplain) -
~
Exhibit I Same Sowce
- (9/77)
H4ther(Emplain) l
JUNE MAJOR SAFETY RELATED MAINTENANCE Equipment Work performed U-1 Reactor Coolant Loop Replaced Vale Disc Guide Stop Valve "A" 1A Aux Feedwater Discharge Removed check valve, sent out to Check Valve repair and reinstalled 1A Diesel Generator Replaced Governor U-2 Service Water Room Cooler Repaired cooler leak and installed flanges 0745t 0325A
JUNE
SUMMARY
OF OPERATING EXPERIENCE Unit 1 The unit entered the report period shutdown for the continuation of the cycle VIII refueling outage. On June 14th at 0825 hours0.00955 days <br />0.229 hours <br />0.00136 weeks <br />3.139125e-4 months <br />, the unit was made critical and on June 18th at 1647 hours0.0191 days <br />0.458 hours <br />0.00272 weeks <br />6.266835e-4 months <br /> the unit was synchronized to the grid.
June 26th at 0515 hours0.00596 days <br />0.143 hours <br />8.515212e-4 weeks <br />1.959575e-4 months <br /> the reactor coolant leakage exceeded the Technical Specification Limit and unit shutdown began. June 27th at 2005 hours0.0232 days <br />0.557 hours <br />0.00332 weeks <br />7.629025e-4 months <br /> unit was taken off line to repair the 1C feed regulator valve, and 2035 hours0.0236 days <br />0.565 hours <br />0.00336 weeks <br />7.743175e-4 months <br /> a manual reactor trip was made due to inability to move control rods caused by a rod urgent alarm failure.
June 28th at 0530 hours0.00613 days <br />0.147 hours <br />8.763227e-4 weeks <br />2.01665e-4 months <br /> the unit was made critical and on June 29th at 0441 hours0.0051 days <br />0.123 hours <br />7.291667e-4 weeks <br />1.678005e-4 months <br /> the bistables were tripped on the steam flow / feed flow mismatch and level dropped below 25%. June 29th at 1925 hours0.0223 days <br />0.535 hours <br />0.00318 weeks <br />7.324625e-4 months <br /> the unit was made critical and on June 30th at 0050 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> the unit was synchronized to the grid and remained on line for the remainder of the report period. Average availability for the month of June is 33.7%, capacity factor 18.8%.
Unit 2 The unit entered the report period at a power level of 1006 MWe (92%
reactor power). The unit remained on line the entire report period ending at a power level of 908 MWe (84% reactor power). Availability 100% and capacity factor 90.2%.
i I
l l
0745t 0325A
REFUELING INFORMATION REQUEST Questions:
1.
Name of facility.
2.
Scheduled date for next refueling shutdown.
3.
Scheduled date for restart following refueling.
4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If answer is yes, what, in general, will these be?
If answer is no, has the reload fuel design and core configuration been reviewed by your Plant Safety Review Committee to determine whether any unreviewed safety questions are associated with the core reload (Ref. 10 CFR Section 50.59)?
If no such review has taken place, when is it scheduled?
5.
Scheduled date (s) for submitting proposed licensing action and supporting information.
6.
Important licensing considerations associated with refueling, e.g.,
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.
l 7.
The number of fuel assemblies (a) in the core and (b) in the spent l
fuel storage pool.
8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.
9.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity.
Page 1 of 3 0745t 0325A
o Unit 1 - Answers 1.
Zion Unit 1 2.
June 26, 1986, currently is the scheduled date for the next refueling outage.
3.
October 30, 1986 is the scheduled month for initial criticality following refueling.
4.
No Technical Specification changes or license amendments are anticipated.
5.
Not applicable.
6.
None 7.
The number of fuel assemblies a) in the core is 193, and b) in the spent fuel storage pool which have been discharged by Zion Unit 1 is 497.
8.
The present licensed spent fuel pool storage capacity (shared with Zion Unit 2) is 2112 fuel assemblies. The installation of the new storage racks has been completed.
9.
In 1995, Zion Station will lose full core discharge capability. This date is based on a December,1983 study.
1 Page 2 of 3 0745t 0325A
^
~
Unit 2 - Answers 1.
Zion Unit 2 2.
The Unit is currently scheduled to shutdown September 6, 1985 for its next refueling outage.
3.
January 10, 1986 is the scheduled date for startup after refueling.
4.
At this time the only outstanding Technical Specification change is a change to the containment leakage rate test requirements.
5.
The containment leakage rate test Technical Specification change has already been submitted.
6.
None.
7.
The number of fuel assemblies a) in the core is 193, and b) in the spent fuel storage pool which have been discharged by Zion Unit 2 is 435.
8.
The present licensed spent fuel pool storage capacity (shared with Zion Unit 1) is 2112 fuel assemblies. The installation of the new storage racks has been completed.
9.
In 1995, Zion Station will lose full core discharge capability. This date is based on a December, 1983 study.
Page 3 of 3 0745t 0325A
Commonwealth Edison 101 Shiloh Blvd.
Zion, Illinois 60099 July 9, 1985 Director, Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Attention: Document Control Desk
Dear Sir:
Enclosed please find the Operating Status Report foi the month of June, 1985 for Zion Generating Station.
Very truly yours, K. L. Graesser Station Manager Zion Station GLA/ss Enclosure (11) l cc: D. P. Galle J. G. Keppler (NRC)
L. D. Butterfield H. E. Bliss INPO R. Johnson i