- 05000311/LER-1991-003, :on 910225,ASME Code 3 Piping Leakage Occurred. Caused by Equipment Failure.Repair of Affected Components Completed in Accordance W/Asme Code & Addl Insp Being Reviewed & Modified +
- ML19305D154 +
- NRC 2003-0067, Reactor Vessel Closure Head Penetration Repair Relief Requests MR 03-018-1 and MR 02-018-2 Supplement 2 and Response to Request for Additional Information +
- ML20064C318 +
- ML031060646 +
- ML020800650 +
- ML20079H369 +
- ML20100J537 +
- ML20093F444 +
- ML20129F717 +
- ML20105A073 +
- ML20207C330 +
- IR 05000327/1989020 +
- ML20236J715 +
- ML20217M780 +
- IR 05000309/1987010 +
- ML20214V797 +
- ML20084E222 +
- ML20209J176 +
- BVY-96-057, Monthly Operating Rept for Apr 1996 for VT Yankee Power Station +
- ML23018A204 +
- ML23060A108 +
- ML23090A226 +
- ML23104A432 +
- NRC-91-0014, Contests Fee Charged Re Tech Spec Change Which Added Valve T50-F458 to List of Remote Manual Isolation Valves in Table 3.6.3-1,per NRC +
- 05000259/LER-1989-014, :on 890606,diesel Generators 1B & 1D auto-started During Performance of Surveillance Procedure O-SI-4.9.A.3.a,resulting in Actuation of Esf.Caused by Personnel Error.Procedure Revised +
- 05000259/LER-1989-014-02, :on 890606,diesel Generators 1B & 1D auto- Started During Performance of 0-SI-4.9.A.3.a.Caused by Personnel Error.Procedure Immediately Revised to Include Precautionary Note Re Insulation of Terminals +
- 05000413/LER-1985-033, :on 850513 & 14,steam Generator hi-hi & lo-lo Signals initiated,respectively.Hi-hi Signal Caused by Personnel Error.Cause of lo-lo Signal Unknown.Cf Isolation Signal Reset & lo-lo Signal Cleared +
- 05000278/LER-1990-009-03, :on 900727,discovered That Recirculation Loop Temp Increased in Excess of Allowable Heat Up Rate & Temp Reading Not Recorded at Required Intervals.Caused by Personnel Error & Procedural Deficiency +
- 05000278/LER-1990-008-02, :on 900727,offgas Recombiner Isolation Occurred Causing Main Condenser Vacuum to Begin Decreasing.Caused by Component/Sys Failure in Offgas Recombiner Condensate Sys. Design of Sys Will Be Evaluated for Root Cause +
- 05000289/LER-1993-001-02, :on 930126,Pressure Switch BS-PS-286 Declared Inoperable Because of Failure to Meet Reduncy Requirement of TS Table 3.5-1.Five Remaining Similar Switches Inspected & Deadband Reset as Required +
- 05000311/LER-1981-051-03, /03L-0:on 810627,steam Generator 22 Tripped.Safety Injection Caused Dilution of Boron Injection Tank.Tank Was Borated Until Concentration within Allowable Limits +
- 05000311/LER-1981-051, Forwards LER 81-051/03L-0.Detailed Event Analysis Encl +
- 05000311/LER-1981-082, Forwards LER 81-082/99X-0.Detailed Event Analysis Encl +
- ML20013F978 +
- 05000334/LER-2019-002, Manual Reactor Trip at 15% Power Due to Lifting of the 1A Main Steam Safety Valve +
- 05000293/LER-1980-069-01, /01X-0:on 801007,w/unit at 96% Steady State Power, Reactor Vessel 203-3A Safety Relief Valve Opened.Caused by Excessive Nitrogen Supply Pressure.Pressure Resulted in Leakage Through Solenoid Valve Into Valve Diaphragm +
- 05000316/LER-1989-008, :on 890311,reactor Cable Tunnel CO2 for Quadrants 1,3 & 4 Declared Inoperable Due to False Indication of Status +
- IR 05000220/1987025 +
- 05000440/LER-2013-003, Shutdown Required by Technical Specifications Due to RCS Pressure Boundary Leakage +
- 05000339/LER-2012-001, Regarding Automatic Reactor Trip Due to Turbine Trip Resulting from a Card Failure +