Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17202U791 +
- ML15282A240 +
- ML17328A304 +
- NL-15-169, Browns Ferry, Units 1, 2, and 3, Startup Test Plan +
- 05000311/LER-1981-006, Forwards LER 81-006/03L-0.Detailed Event Analysis Encl +
- ML18153A303 +
- ONS-2016-025, Completion of Required Action by NRC Order EA-12-051 with Regard to Reliable Spent Fuel Pool Instrumentation +
- ML041470180 +
- ML20063Q101 +
- ML20059F926 +
- ML20085E504 +
- ML20094L104 +
- ML20116F340 +
- ML20195H469 +
- ML20199L456 +
- ML20197H633 +
- ML20066G884 +
- ML20207N624 +
- ML20214R485 +
- IR 05000155/1987028 +
- ML20125A183 +
- LIC-96-0096, Monthly Operating Rept for June 1996 for Fort Calhoun Station Unit 1 +
- 05000277/LER-1987-007, :on 870619,full Scram Signal Generated by Reactor Protection Sys Logic.Caused by Procedural Deficiency & Personnel Error.Rev of Intermediate Range Monitors Postponed Due to Administrative Problems +
- 05000277/LER-1987-007-01, :on 870619,full Scram Signal Generated by Reactor Protection Sys Logic.Caused by Procedural Deficiencies,Combined W/Personnel Error.Procedural Revs Being Made +
- 05000352/LER-1986-015, :on 860304,main Control Room Ventilation Sys Isolated & Train B of Control Room Emergency Fresh Air Sys Started.Caused by Breakage of Chlorine Analyzer Tape D. Chlorine Detection Sys Temporarily Installed +
- 05000293/LER-1997-007, :on 970401,safeguard Buses Were de-energized Due to Severe Storm.Replacement of Microprocessor Control Units Installed in Voltage Regulating Transformers +
- 05000440/LER-1997-002, :on 970211,breaker Trip Caused Loss of Electrical Power to Non-Class 1E Bus & Resulted in ESF Actuation.Caused by Random Component Failure.Ground Fault Replaced +
- 05000219/LER-1984-030, :on 841031,reactor Automatically Scrammed Due to Low Water Level.Caused by Operator Failure to Establish Feedwater Flow from Reactor Feed Pump During Plant Heatup. Plant Procedures Revised +
- 05000219/LER-1990-016, :on 901220,senior Reactor Operator Licensed Group Shift Supervisor Left Control Room W/O Replacement, Resulting in Lack of Operator in Control Room for 4 Minutes. Both Operators Returned to Control Room +
- ML19327A803 +
- IR 05000269/1976004 +
- 05000397/LER-1997-011, :on 971010,HPCS Battery Charger Failed.Caused by Failure of a Phase Firing Control Circuit Board Due to Aging During 7 Yrs of Use.Hpcs Sys Was Immediately Declared Inoperable +
- 05000397/LER-1989-020, :on 890527 & 0605,during Local Leak Rate Testing,Valve RHR-V-9 Automatically Isolated.Caused by Procedural Inadequacy & Inadequate Corrective Action Following Second Event.Procedure Modified +
- IR 05000275/1985029 +
- 05000259/LER-2009-001, Turbine Trip and Reactor Scram Due to Power Load Unbalance Signal on Main Generator +
- 05000219/LER-2003-004, Actuation of Reactor Protection System Due to Instrument Malfunction +