Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML15282A240 +
- ML15180A391 +
- ML11356A241 +
- NL-15-169, Browns Ferry, Units 1, 2, and 3, Startup Test Plan +
- 05000311/LER-1993-010, :on 930629 & 30,TS 3.0.3 Entered Due to More than One Inoperable Analog Rod Position Indicator Per Bank. Caused by Sys Design.Signal Conditioning Modules of Affected Rods Adjusted +
- SCH07-077, Discharge Confirmation Report +
- ML19209D095 +
- NRC-04-0057, July 2004 Monthly Operating Report for Fermi 2 +
- ML041970383 +
- ML033440414 +
- ML20084R723 +
- IR 05000317/1985009 +
- ML20203G159 +
- ML20211H069 +
- 05000461/LER-1987-009, :on 870306,exhaust Fan a of Fuel Bldg Ventilation Sys Tripped.Caused by Failure of Solenoid Valve on Fuel Bldg Supply Outboard Isolation Damper.Standby Gas Treatment Sys Started & Solenoid Replaced +
- 05000324/LER-1993-006-02, :on 930521,HCU 06-31 Declared Inoperable When CRD Accumulator Low Pressure/High Level Alarm Received in Cr.Hcu 02-23 Inoperable at Time.Hcu 02-23 Restored to Svc & Excess Water Drained from HCU 06-31 +
- 05000498/LER-1991-004, :on 910215,loss of Offsite Power Actuation Occurred During Routine Maint.Caused by Lack of Attention to Work Performance Methods.Training Conducted for Maintenance Personnel +
- 05000499/LER-1990-002-01, :on 900202,Train Reactor Trip Breaker Opened, Initiating Turbine & Reactor Trip & Feedwater Isolation on Low Average RCS Temp.Cause Unknown.Universal Logic Cards Replaced & Monitoring Instruments Installed +
- ML20028E558 +
- 05000311/LER-1993-010-01, :on 930629,reactor Shutdown Initiated Per TS 3.0.3 Due to Inoperability of More than One Control Rod Analog Rod Position Indication Per Control Bank.Signal Conditioning Modules of Affected Rods Adjusted +
- 05000397/LER-1992-037, :on 920815,reactor Manually Acrammed Due to Indications of Core Instability.Caused by Unanticipated Interaction of Operating Conditions & Components.Revised Operating Strategies & Related Procedures +
- ML13329A147 +
- 05000461/LER-2010-003-01, For Clinton Power Station, Unit 1, Regarding Unexpected Component Actuations Due to Self Test System Design Deficiencies +
- 05000219/LER-2003-004, Actuation of Reactor Protection System Due to Instrument Malfunction +
- ML042300433 +
- 05000219/LER-1987-010, :on 870223,during Automatic Electrical Bus Transfer,Primary & Secondary Containment Isolations & Standby Gas Treatment Sys Initiation Occurred.Caused by Transient Due to Heavy Snow Fall +