Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML13210A200 +
- ML18150A267 +
- ML20040H444 +
- 05000498/LER-1989-023-01, :on 891216,standby Diesel Generator 11 Failed Tech Spec Required Operability Test & Attempt to Secure Essential Chiller 12C Resulted in Trip.Caused by Failure of Voltage Regulator.Regulator Returned to Mfg +
- ML20004E713 +
- ML20053E375 +
- ML022670056 +
- ML20082R947 +
- ML20099F350 +
- ML20116K233 +
- ML20137Q050 +
- ML20134G771 +
- ML20132B375 +
- ML20133L655 +
- IR 05000277/1987024 +
- IA-85-208, Insp Rept 70-1113/84-16 on 841127-30 & 850114-16.Violation Noted:Failure to Investigate & Take Corrective Action When Control Stds Limits Exceeded +
- ML20154C274 +
- ML20138C399 +
- ML20207B429 +
- ML20203G189 +
- ML20203G181 +
- IR 05000289/1985097 +
- IR 05000309/1987003 +
- ML20245B308 +
- ML20237E620 +
- ML20217G782 +
- ML17309A427 +
- BVY-99-112, Monthly Operating Rept for Aug 1999 for Vermont Yankee.With +
- RS-22-014, Application to Adopt TSTF-246, RTS Instrumentation, 3.3.1 Condition F Completion Time +
- BVY-92-126, Monthly Operating Rept for Oct 1992 for Vermont Yankee Nuclear Power Station +
- 05000341/LER-1989-006, :on 890226,turbine Trip & Reactor Scram Occurred While Resetting Pushbutton for Main Turbine Mechanical Overspeed Test.Caused by Poor Design of Trip Linkage.Event Critique Discussed W/Personnel +
- 05000219/LER-1989-005, :on 890217,standby Gas Treatment Sys & Partial Primary Containment Isolation Initiated During Time Tests. Caused by Fact That Sys Not Designed to Facilitate Testing. Blown Fuse Replaced & Isolation Signal Reset +
- 05000334/LER-1989-007-01, :on 890518,electrical Supply Breaker to ATWS Mitigating Sys Actuation Circuitry Panel Accidentally Opened.Caused by Design Deficiency.Deficiency Corrected by Modifying Process Instrumentation Circuitry +
- 05000352/LER-1987-019, :on 870525,during Surveillance Test on Reactor Water Level Transmitter,Transmitter Vented Before Being Isolated Causing Pressure Oscillations.Caused by Personnel Error.Low Level Water Signal Reset +
- ML20206H128 +
- 05000265/LER-1997-001-07, :on 970227,instrument Maintenance Dept Was Performing Procedure to Test HPCI Initiation Logic.Caused by Deficient Procedure.Order Was Issued for All non-routine +
- 05000483/LER-1996-005, :on 961111,turbine Trip & Engineered Safety Features Actuations Occurred Due to Steam Generator a High Level Followed by Plant Shutdown Due to High Vibration on Reactor Coolant Pump B +
- 05000293/LER-1992-016, :on 921213,automatic Scram Resulting from Load Rejection Occurred While at 48 Percent Reactor Power.Caused by 345 Kv Switchyard Flashovers Due to Salt Deposited During Severe Coastal Storm +
- 05000352/LER-1996-016, :on 960725,core Thermal Power Exceeded Licensed Power Limit During Power Transient.Caused by Defective EHC Sys Component & Reactor Scram.Defective Primary Frequency/ Voltage Converter Replaced & Calibration Performed +
- 05000368/LER-1991-007, :on 910223,fire Occurred in 480-volt ESF Motor Control Ctr Following Start of Turing Gear Motor.Caused by Incomplete Contact Between Bus Bars & Circuit Breaker Power Stabs.Design Change Under Evaluation +
- BVY-93-071, Monthly Operating Rept for June 1993 for Vermont Yankee Nuclear Power Station +
- 05000293/LER-1993-004, :on 930313,automatic Scram Occurred Resulting from Load Rejection During Severe Coastal Storm While at 100% Power.Caused by Environ Effects of Storm.Trip Settings of Main Input Circuit Breakers Increased +
- 05000412/LER-1993-002, :on 930130,bistaples for Loop a Channel II Ms Pressure in Tripped Condition for Transmitter Replacement. Caused by Comparator Card Power Supply Failure.Associated Valves Actuated to Design Positions +
- IR 05000443/1989099 +
- 05000498/LER-1989-023, :on 891216,standby Diesel Generator 11 Failed Tech Spec Required Operability Test & Declared Inoperable. Caused by Contact Oxidation & Low Contact Pressure.Chiller Auxiliary Relay Cleaned & Adjusted +
- ML19341D051 +
- ML19261B307 +
- 05000280/LER-1993-005-01, :on 930325,main Control Room/Emergency Switchgear Room Chiller 1-VS-E-4C Declared Inoperable.Caused by Closed Backwash Strainer Valve in Svc Water Sys for Chiller.Chiller Replaced +
- 05000280/LER-1991-015-01, :on 910809,two Main Control Room/Emergency Switchgear Room Chillers Discovered Inoperable.Caused by Thermostat Failure & Inoperable Emergency Power Source. Thermostat Replaced & Chiller Returned to Svc +
- 05000280/LER-1995-010, :on 951006,four Component Cooling Heat Exchangers Determined to Be Inoperable.Caused by Tubesheet Blockage by Hydroids.Component Cooling Heat Exchangers Removed from Svc & Cleaned +