Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000325/LER-2008-006 +
- ENS 42963 +
- ML20043F408 +
- ML20055F673 +
- ML20063Q020 +
- NL-02-144, October 2002 Monthly Operating Report for Indian Point Unit No.2 +
- ML20101C347 +
- ML20128K650 +
- ML20149J341 +
- ML20199F522 +
- ML20195D000 +
- ML20206N406 +
- ML20246C909 +
- BECO-92-062, Monthly Operating Rept for May 1992 for Pilgrim Nuclear Power Station +
- BVY-97-098, Monthly Operating Rept for Jul 1997 for Vermont Yankee Nuclear Power Station +
- 05000412/LER-1989-010, :on 890424,high Alarm Received on Containment Purge & Exhaust Radiation Monitor Causing Isolation of Ventilation Sys.Caused by Mechanical Binding of Spent Fuel Pool Isolation Valve.Isolation Valve Closed +
- 05000311/LER-1989-008-02, :on 890411,reactor Trip on Steam Generator 24 lo-lo Level Occurred After Main Steam Line Isolation Valve 24MS167 Closed.Caused by Latching Relay Failure During Surveillance.Relay Replaced & Circuit Tested +
- 05000412/LER-1987-036, :on 871117,I&C Technician Working in Control Room Bumped & Tripped Power Supply Switch to Turbine Thrust Bearing Circuit Supervisory Instrument.Caused by Several Factors,Including No Seal on Trip Relay +
- 05000280/LER-1987-003, :on 870213 & 16,one of Three Control/Relay Room Chillers Operable.Second Chiller Out for Maint & Third Chiller Inoperable.Caused by Inadequate Heat Sinks.One Chiller Replaced,Two New Chillers Ordered +
- 05000293/LER-1996-002, :on 960205,loss of Valve Position Indication for MO-1301-16 Occurred.Caused by Loose Control Power Fuse in Breaker B1864.Investigation & Troubleshooting Plan Was Implemented +
- 05000289/LER-1992-003-01, :on 921019,discovered Reactor Building Atmospheric Radiation Monitor Inoperable Due to Personnel Error Which Caused Improper Valve Lineup.I&C Technician Has Been Counseled +
- 05000277/LER-1992-020, :on 921006,CR Ventilation Sys Transferred to Emergency Ventilation Mode Due to an Instrument Spike in B Main CR Radiator Monitor.Design Work in Progress for Mod.W/ +
- 05000302/LER-1996-004, :on 960112,potential Leakage Into Control Complex Habitability Envelope Was Above Design Limits Due to Worn & Missing Damper Components.Implemented Periodic Insp of Cche Isolation Dampers for Leakage +
- 05000334/LER-1994-004-01, :on 940504,water Found Leaking from Pipe Penetration in East Trench of Pab & on 940506,plant Shutdown Initiated Due to Status of Efforts to Determine Source of Leakage.Two Foot Section of Pipe Replaced +
- 05000416/LER-1982-056-03, /03L-0:on 820820,accumulator Trouble Annunciators Alarmed for Hydraulic Control Unit Accumulators 08-37 & 20-53 During Performance of Control Rod Drive Sys Open Vessel Test 1-C11-SU-05-0.Caused by Normal Sys Leakage +
- 05000213/LER-1990-010, :on 900727,actuation of Reactor Protection Sys Occurred Due to Test Procedure Used at Inappropriate Time. Caused by Failure to Identify Test Procedure Incompatibility W/New Tech Spec Requirements.Procedure Revised +
- 05000254/LER-1993-012-04, :on 930726,light Socket Shorted Out When Operator Reset HPCI Logic Power.Caused by Short Circuit in Light Socket.Light Socket & Blown Fuses Replaced +
- 05000267/LER-1980-012-01, /01T-0:on 800311,while Facility Was Operating at Less than 2% Power,Orifice Valves Not Set for Equal Flows & Temp Limit Was Exceeded.Caused by Inability to Close Orifice Valve to Equal Flow Position.Valve Freed Up +
- 05000400/LER-1987-041, :on 870804,restoration Alignment on Clearance for Placing Dryer 1B Back Into Svc Incorrect.Caused by Personnel Error.Valve Lineup for Instrument Air Dryer 1B Put Into Correct Configuration +
- 05000315/LER-1988-010, :on 881011,unit Shut Down After Determination That Electrical Cables Not Configured Per Design Drawings. Caused by Pressurizer & Reactor Head Vent Valves Not Being in Configuration.Design Change Initiated +
- 05000315/LER-1988-010-01, :on 881004,unit Electrical Cables of Reactor Head Vent Valves & Pressurizer Steam Space Vent Valves Determined Not Physically Configured Per Design Drawings. Configuration Discrepancies Corrected +
- 05000341/LER-2008-003, Control Center Pressure Boundary Door Blocked Open +
- 05000247/LER-2002-006, Two of Three Emergency Diesel Generators Inoperable Due to Component Failure; a Condition Prohibited by Tech Specs +
- 05000341/LER-2002-003, Title Breaching of Control Room Emergency Filtration (CREF) System Ductwork Integritiy +
- ML20036B205 +
- 05000413/LER-1987-033, :on 870406,operability of Diesel Generator 1B Not Verified within Time Limit Required by Tech Specs.Event Discovered on 870803.Caused by Personnel Error.Weekly Surveillances Begun Upon Discovery of Incident +