Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ENS 45073 +
- ML12320A004 +
- ML18141A274 +
- ML19332D859 +
- ML20039G855 +
- ML20062K302 +
- ML20082H545 +
- ML20137T144 +
- ML20204J348 +
- ML20207N624 +
- ML20210T778 +
- 0CAN079706, Monthly Operating Repts for June 1997 for Arkansas Nuclear One,Units 1 & 2 +
- 2CAN129608, Monthly Operating Rept for Nov 1996 for Arkansas Nuclear One-Unit 2 +
- 05000397/LER-1986-038, :on 861120,reactor Scram Occurred.Caused by Rapid Decrease in Reactor Water Level Upon Incorrect Alignment of Condensate Cleanup Block Valves & Feedwater Diversion to Empty Line.Operators Counseled +
- 05000334/LER-1997-020, :on 970724,identified Pressure Switch Contact, Installed in Control Circuit,Had Unqualified Level Category. Caused by Deficiency in Original Design of Ventilation Sys. Installed Qualified Replacement Switches +
- 05000412/LER-1996-004-01, :on 960830,bypass Feedwater Regulating Valve Leakage Leads to Manual Reactor Trip During Shutdown for Refueling.Procedures Revised +
- 05000254/LER-1991-014-02, :on 910208,discrepancy Discovered Between FSAR & Standby Gas Treatment Design Specs for Heater Logic Circuitry.Caused by Inadequate Review of Sar.Procedures to Test for Heater Operability Revised +
- 05000423/LER-1991-019-02, :on 910725,plant Shutdown Initiated After Train B of Svc Water Declared Inoperable & Train B Could Not Be Restored within 72 H.Caused by Design Deficiency.Piping Cleaned & Will Be Flushed +
- 05000334/LER-1995-001-01, :on 950116,observed That Containment Ventilation Flow Exhausting Through SLCRS Indicating 7800 Cfm.Procedure Change Incorporated to Increase Frequency of Monitoring Flow During Core Alterations +
- 05000313/LER-1989-042, :on 891209,inadvertent Actuation of Control Room Emergency Ventilation Sys Occurred.Caused by Keying of Hand Held Radio in Vicinity of Chlorine Monitors by Technician.Technician Counseled +
- IR 05000302/1981005 +
- 05000311/LER-1981-017-03, /03L-0:on 810515,Action Statement 3.4.9.3 Was Entered When Control Operator Noticed Higher than Normal Temp on Pressurizer Power Operated Relief Valve Outlet Line. Caused by Leakage of Valve 2PR1.Valve Will Be Repaired +
- 05000311/LER-1981-017, Forwards LER 81-017/03L-0.Detailed Event Analysis Encl +
- 05000272/LER-1980-016-03, /03L-0:on 800319,while Taking Voltage Readings in RMS Rack,Power Supply Inadvertently Grounded by Instrument Probe,Resulting in 115 Volts Ac Breaker Trip.Caused by Personnel Error.Instrument Reset +
- 05000272/LER-1980-016, Forwards LER 80-016/03L-0 +
- 05000346/LER-1979-102-03, /03L-0:on 791022,during Feedwater Sys Monthly Surveillance Test,No Oil Level Visible in Oil Sight Glass on Inboard Bearing of Auxiliary Feedpump Turbine 1-1.Caused by Loose Sight Glass.Glass Tightened & Oil Replaced +
- 05000255/LER-1997-004, :on 970221,trip of High Pressure Safety Injection Pump Occurred While Filling Safety Injection Tank Resulting in TS Violation.Caused by Particle Lodged Between Surface of Indication disk.Y-phase Relay Was OOS +
- 05000354/LER-2005-004, A Control Room Emergency Filtration (CREF) Train Inoperable with B CREF Out of Service +
- 05000346/LER-1983-002-03, /03L-0:on 830114 & 15,after Reactor Trips,Rcs Dose Equivalent I-131 Exceeded Tech Spec Limit.Caused by Slight Leakage of Fission Products Through Fuel Cladding.Caused by Temp & Pressure Changes.Situation Monitored +
- ML20058H981 +