Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ENS 42878 +
- ML17317A813 +
- ML100920063 +
- ML18075A083 +
- ML18039A624 +
- ML060030080 +
- ML050960041 +
- ML18066A484 +
- ML18058B258 +
- ENS 41539 +
- ML040580690 +
- NOC-AE-04001720, Radioactive Effluent Release Report for 2003 +
- ML041060609 +
- WO 02-0027, April 2002 Monthly Operating Report for Wolf Creek Generating Station +
- ML20082C049 +
- ML20100R429 +
- ML20140E923 +
- ML20129F643 +
- ML20125D915 +
- ML20150E058 +
- ML20149F844 +
- ML20237J016 +
- U-601309, Ro:On 881111,generator Trip W/Reactor Scram Occurred Due to Sudden Pressure Actuation on 1C Main Power Transformer & Fire on Insulator of 1C Main Power Transformer Discovered. Fire Extinguished +
- BECO-LTR-96-066, Monthly Operating Rept for June 1996 for Pilgrim Nuclear Power Station +
- 05000324/LER-1989-001-02, :on 890214,HPCI Initiation During Performance of Maint Surveillance Test on ECCS Trip Unit Occurred.Caused by Spurious Electrical Noise by Adjacent Trip Unit.Component Failures Tracked +
- 05000293/LER-1989-020, :on 890614,unplanned Reactor Protection Sys Scram Signal Occurred During Shutdown.Caused by Operator Error.Responsible Operator Verbally Reprimanded for Failing to Follow Approved Procedure +
- 05000499/LER-1989-017, :on 890713,internal Fault Occurred in Main step-up Transformer 2A.Caused by Failure of Phase a High Voltage Bushing in Transformer.Transformer Returned to Mfg for Repair & Further Failure Analysis +
- 05000324/LER-1989-001-03, :on 890214,momentary Initiation Signal Generated & HPCI Sys auto-started as Designed But Remained in Min Flow Mode & Did Not Inject Into Reactor Pressure Vessel.Caused by Spurious Closure Signal +
- 05000412/LER-1999-002-01, :on 990305,discovered Potential Damage to Charging HHSI Pumps Due to Inadequate pre-fire Plan Procedure Guidance.Caused by Inadequate Analysis in 1987. Procedures Revised Addressing Subj Issue.With +
- 05000266/LER-1997-039-01, :on 970615,RHR Loop Inoperable.Caused by Removal of CCW Pump from Svc.Ccw Pump Restored +
- 05000353/LER-1993-001-01, :on 930103,reactor Shut Down Automatically on High Pressure After Transient in EHC Sys Occurred Coincident w/balance-of-plant Battery Ground Alarm.Cause Indeterminate. Alarm Reset & Testing Currently Underway +
- 05000461/LER-1993-008, :on 931230,determined That TS SR for Setpoint Verification of APRMs flow-biased Simulated Thermal power- High RPS Trip Functions Not Completed within Specified Interval Due to Personnel Errors +
- IR 05000271/1981015 +
- 05000311/LER-1981-097, Forwards LER 81-097/03L-0.Detailed Event Analysis Encl +
- 05000311/LER-1981-097-03, /03L-0:on 810901,operator Found Individual Rod Position & Control Rod Bank Indicator for Rod 2D2 in Disagreement by Greater than 12 Steps.Caused by Calibr Drift of Position Indicator.Position Indicator Recalibr +
- 05000316/LER-2020-001, Failure of Source Range Nuclear Instrumentation Resulting in a Condition Prohibited by Technical Specifications +
- 05000280/LER-1988-034, :on 881203 & 14,main Control Room C & Emergency Switchgear Room Chiller Tripped.Caused by Insufficient Water Flow to Chiller C & Lack of Calibr on Chiller Condenser Pressure Control Valves.Valves Adjusted +
- 05000280/LER-2005-001, Regarding Manual Reactor Trip Initiated Due to Misaligned Control Rod +
- 05000440/LER-2003-005-01, 1 for Perry Nuclear Power Plant Regarding Technical Specification Violation/Loss of Safety Function Due to Air Bound Water-Leg Pump +
- 05000440/LER-2003-005, For Perry Technical Specification Violation/Loss of Safety Function Due to Air Bound Water-leg Pump +
- ML021420008 +
- ML20032D076 +
- L-99-140, Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with +