Monthly Operating Rept for Oct 1981
ML20032D076
Person / Time
Site: Beaver Valley
Issue date: 11/05/1981
From: Timko D
DUQUESNE LIGHT CO.
To:
Shared Package
ML20032D074 List:
References
NUDOCS 8111130362
Download: ML20032D076 (5)


Text

_- - _

UNIT SHUIDOWNS AND POWER REDUCTIONS DOCKET NO.

50-334 2"

UNIT NAME BVPS Unit #1

[r DATE 11/5/81 UUg REPORT MONTil October

  • 1961 COMPLETED BY D.

R. Timko TELEPilONE 412-643-1947 7;&

PJ OUHD O*

'* h L '#"*##

Id"S" A C""C'8 h C Du*

g"-

9J .

=

I cE 4

2 ; ac Even:

E?

9T A(lion tu C00 3.

E 5 5 :!

Report

  • NO S'

Prevent Recurrence 2*

e L

6 12 811002 0

B 4

Cleaned 'B' Section of Main g

Condenser 1.3 811009 S

0 B

4 Load Reduction Requested By System Operations 14 811012 F

8.62 A

3 RA CONROD Blown Fuse in circuit for stationary gripper for control rod F4 caused the rod to drop, resulting in a reactor trip from high neutron flux rate.

Replaccd fuse.

15 811016 S

0 B

4 Load reduction requested by System Operations l

I 3

4 F: Forced Reason:

Method:

Esinbit G Instructions S: Schedufed A Equipment failure (Explain) l-Manual for Pseparation of Data B-Maintenance ci Test 2 Manual Sesam.

Entry Sheets for Licensee C Refueling 3 Autonutic Scram.

Event Repost ill:RI Fde(NUREG D Regulatory Restriction 4 Other IExplain) 01611 110perato Trainingi License Exanunation I Admnustrative 5

G Operational I? son (11xplaml Estubit 1 Same'Sousee 07/77)

II Other (Esp!ainI 4

e a

AVERAGE DAll UNIT POWER LEVEL 50-334 DOCKET NO.

UNIT BVPS Unit #1 DATE 11/5/81 D. R. Mo COMPLETED BY TELEPHONE 412-643-1947 MONTH October. 1981 DAY AVERAGE DAl PO ER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

I 804 37 458 2

795 gg 3

38 19 696 367 4

20 721 721 5

21 750 796 730 6

22 816 738 7

23 742 8

757 9

467 l

721 10 26 11 462 27 71 3 I2 28 726 742 738 13 29 796 742 14 30 15 795 742 3,

746 16 l

l INSTRUCTIONS On this format. ltst the average daily unit power lesel in MWe-Net for each day in the reporting month. Compute tu the nearest whole megawatt.

(4/77) l

A o.

OPERATING DATA REPORT DOCKET NO. 50-334 DATE 11/5/81 COMPLETED BY D.

R.

Tinko TELEPHONE. 417-643-1.947 l

OPERATING _ STATUS

1. Unit Name: Beaver Valley Power Station Unit #1-Notes
2. Reporting Period:

October. 1481

3. Licensed Thennal Power (MWt):

WO

4. Nameplate Rating (Gross MWe):

923 852

5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe):

860

7. Maximum Dependable Capacity (Net MWe):

810__

8. If Changes Occur in Capacity Ratings (Irems Number 3 Through 7) Since Last Report. Give Reasons:

Item 6.

860MW more accurately reflects ditterence between MDC net and gross

9. Power Level To Which Restricted,if Any (Net MWe):

None

10. Reasons For Restrictions. If Any:

N/A This Month YrAo.Date Cumulative

11. Hours In Reporting Period 745 7296 48',240
12. Number Of Hours Reactor Was Critical 741.73 5.217.87 19,744 54
13. Reactor Reserve Shutdown Hours 0

0 4.'482.8

14. Hours Generator On-Line 736.38 5.133.06 18,840.31
15. Unit Reserve Shutdown Hours 0

0 0

^

16. Gross Thermal Energy Generated (MWH) 1,651,328.79 12,589,718.53 40,697,bil.68
17. Gross Electrical EnerEy Generated iMWH) 537,300 4,058,100 12,685,440
18. Net Electrical Ener;v Generated (MWH) 501.581 3,764,753 11,626,258
19. Unit Service Factor 98.8 70.4 40.9
20. Unit Availability Factor 98.8 70.4 4C.9
21. Unit Capacity Factor (Using MDC Net) 83.1 63.7 33.4
22. Unit Capacity Factor iUsing DER Net) 79.0 60.6 31./
23. Unit Forced Outage Rate 1.2 29.6 d./

l

24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Each):

Refueline Outage / January 2/20 Weeks

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A (9/77)

c DUQUESNE LIGHT COMPANY Beaver Valley Power Station MAJOR SAFETY-RELATED MAINTENANCE - OCTOBER 1981 1.

Replaced the fuse for control rod F4 stationary gripper coil

A 9.

DUQUESNE LIGHT COMPANY Beaver Valley Power Station NARRATIVE

SUMMARY

OF MONTHLY OPERATING EXPERIENCE - OCTOBER 1981 October 1 Station in Operational Mode 1 at nominti full power.

October 2 Station in Operational Mode 1 at neminal full power. At 2002 hours0.0232 days <br />0.556 hours <br />0.00331 weeks <br />7.61761e-4 months <br />, through commenced a load reduction to permit cleaning of the main condenser October 5 section B.

Load was stabilized at 45% power by 2144 hours0.0248 days <br />0.596 hours <br />0.00354 weeks <br />8.15792e-4 months <br />. The condenser was returned to service at approximately 2100 hours0.0243 days <br />0.583 hours <br />0.00347 weeks <br />7.9905e-4 months <br /> on October 4 and the station load was increased to 60% power by 2127 hours0.0246 days <br />0.591 hours <br />0.00352 weeks <br />8.093235e-4 months <br />.

The station followed system load requirements reaching nominal full power by 0650 hours0.00752 days <br />0.181 hours <br />0.00107 weeks <br />2.47325e-4 months <br />.

October 6 Station in Operational Mode 1 at nominal full power.

through October 8 October 9 Station in Operational Mode 1 at nominal full power.

Between 2040 through hours on October 9 and 0530 hours0.00613 days <br />0.147 hours <br />8.763227e-4 weeks <br />2.01665e-4 months <br /> on October 12 station load was reduced October 12 to 60% power because of low system load requirements and for fuel conservation. At 1217 hours0.0141 days <br />0.338 hours <br />0.00201 weeks <br />4.630685e-4 months <br /> on October 12 the Reactor tripped because of a dropped rod due to a blown stationary gripper coil fuse.

The Reactor was critical at 1533 hours0.0177 days <br />0.426 hours <br />0.00253 weeks <br />5.833065e-4 months <br /> and the unit was synchronized at 2054 hours0.0238 days <br />0.571 hours <br />0.0034 weeks <br />7.81547e-4 months <br />.

October 13 Station in Operational Mode 1 at 60% power.

Gradual increase of the station load was in progress, reaching nominal full power by 1600 hours0.0185 days <br />0.444 hours <br />0.00265 weeks <br />6.088e-4 months <br />.

October 14 Station in Operational Mode 1 at nominal full power.

through October 15 October 16 Station in Operational Mode 1 at nominal full power. Between 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br /> through of October 16 and 0900 hours0.0104 days <br />0.25 hours <br />0.00149 weeks <br />3.4245e-4 months <br /> of October 19, station load was reduced October 19 to 60% power due to low system requirements and for fuel conservation Station load was returned to 90% power.

October 20 Station in Operational Mode 1 at nominal 90% power for fuel conservation.

through October 31 e