Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000261/LER-2010-008 +
- ML18037A084 +
- ML17326A455 +
- ML20028D531 +
- ENS 40297 +
- ML20052G660 +
- ML20054K645 +
- ML20054F427 +
- 05000311/LER-1982-057, Forwards LER 82-057/03L-0.Detailed Event Analysis Encl +
- ML20058G556 +
- ML20078P409 +
- ML20090K053 +
- ML20125E406 +
- ML20153B136 +
- 05000266/LER-1998-019, :on 980615,discovered That Containment Hydrogen Monitors Lacked Environmentally Qualified Coating on Terminal Strips.Caused by Terminal Strips Being Disturbed W/O Subsequent Reapplication of Coating.Replaced Coating +
- 05000313/LER-1987-002-01, :on 870516,problems Encountered W/Main Turbine electro-hydraulic Control During Electrical Storm.Caused by Defective Analog Comparator Card.On 870517,turbine Tripped Upon Insertion of New Card.Plant Stabilized +
- 05000498/LER-1987-026, :on 871212,discovered That Degraded Undervoltage Coincident W/Safety Injection Not Tested.Caused by Personnel Misinterpretation of Trip Actuation Devise Operational Test Requirements +
- 05000498/LER-1988-036, :on 880607,unmonitored Release of 1,504 Gallons of Liquid Effluent Occurred.Caused by Personnel Error. Responsible Individual Counseled & Incident Reviewed W/ Others Involved W/Radioactive Effluents +
- 05000271/LER-1995-009, :on 940720,inadvertent Primary Containment Isolation Sys Actuation Occurred Due to Unexpected Transfer of 120/240 Volt Ac Bus to Alternate Power Source During Lightning Storm.Reset FW Valve Lockups +
- 05000353/LER-1991-002-03, :on 910324,inadvertent Actuation of Primary & Secondary Containments Occurred.Caused by Blown Fuse During Testing.Procedures for Divisional Safeguard Battery Testing & Preventative Maint Revised +
- 05000271/LER-1994-009, :on 940720,lightning Strike Resulted in a Transfer of 120/240V Vital AC Bus from Normal Power Source to Alternate Source.Caused by Lightning Strike to Plant. Feedwater Regulator Valve Lockups Were Reset +
- 05000278/LER-1991-002-01, :on 910121,hourly Fire Watch Patrol for RHR B Fire Damper Not Performed.Caused by Lead Protection Technician Closing Out Wrong Fire Watch Patrol.Effective Means of Communication Established +
- 05000271/LER-1993-018, :on 931217,Group 4 Primary Containment Isolation Signal Received While Attempting to Start RHR Pump Due to Pressure Spike.Signature Corrective Action Rept CAR 94-01 Completed +
- ML20054B325 +
- 05000328/LER-1981-152-01, /01T-0:on 811221,control Rod Withdrawal Limits Exceeded.Caused by Omission from Appropriate Startup Procedures.Withdrawal Limits Will Be Added to Appropriate Procedures Until Reliance on Action Statement Unnecessary +
- ML20032C296 +
- ML20024G699 +
- 05000311/LER-1988-003, :on 880208,Tech Spec Table 3.3-12 Action 27 Not Complied With.Caused by Personnel Error Associated W/ Inadequate Communications & Training.Operations Dept Mgt Reviewed Event & Procedures Will Be Modified +
- 05000271/LER-2003-004, Hearing - Entergy Exhibit 13, LER 2003-004-00, Brunswick, Unit 2, Loss of Generator Excitation Results in Reactor Protection System and Other Specified System Actuations +
- 05000341/LER-1998-007, :on 980908,inadvertent Deenergization of Safety Buses During Performance of Surveillance Testing Resulted in ESF Actuations.Caused by Faulty Static Underfrequency Relay. Relay Was Removed & Benched Tested +
- 05000311/LER-1982-057-03, /03L-0:on 820630,feedwater Pump 22 Tripped Causing Operator to Reduce Turbine Load & Commence Control Rod Insertion.Caused by Decrease in Suction Pressure Associated W/Placing Feedwater Heater 26 in Svc +