- ENS 46054 +
- ML17333A348 +
- ML102160389 +
- 05000272/LER-1994-014, :on 940825,five Planned TS 3.0.3 Entries Made to Correct Analog Rod Position Indication (Apri) Sys Drift Due to Design of Apri Sys.Modules & Span of Modules for Subj Rods Adjusted +
- ML19347A853 +
- 05000346/LER-1982-024, Forwards LER 82-024/03L-0.Detailed Event Analysis Encl +
- ML023240392 +
- IR 05000255/1985013 +
- PLA-2886, Monthly Operating Repts for June 1987 +
- 05000352/LER-1989-047, :on 890720,identified That Svc Water Sys Unavailable to Provide Cooling Water to ECCS & RCIC Sys Due to Valve Position.Caused by Inadequate Emergency Procedures. Valve Reopened & Procedure T-103 Revised +
- 05000414/LER-1989-015, :on 890609,operating Main Feedwater Pump Tripped on Low Suction Pressure Initiating Auxiliary Feedwater Pump Automatic Start & Turbine Trip.Caused by Equipment Malfunction +
- 05000313/LER-1987-004, :on 870815,reactor Trip & Emergency Feedwater Actuation Occurred During Power Ascension Due to Main Feedwater Pumps Control Sys Problems.Caused by Placing Pump in Automatic Control at Power Level Too Low +
- 05000324/LER-1986-022-01, :on 861003,reactor Shut Down Due to Unsuccessful Restart of Motor Generator Set.Caused by Opened Fuses.Fuse 7 Transformer Replaced,Motor Generator Restarted & Loop Returned to Svc +
- 05000352/LER-1986-046-01, :on 860923 & 26,main Control Room Ventilation Sys Isolated Due to High Chlorine Concentration Indications. Probably Caused by Rainwater Depositing on Chlorine Analyzer Probes.Related Correspondence +
- 05000352/LER-1986-046, :Between 860923-26,main Control Room Ventilation Sys Isolated Three Times.Caused by False High Chlorine Indications Due to Rainwater on Chlorine Analyzer Probes.Probe Relocation Being Evaluated +
- 05000374/LER-1988-002-07, :on 880303,Group 10 Isolation Occurred While Performing Instrument Surveillance Test.Caused by Failed Contact on Test Switch.Test Switch Replaced,Tested & Returned to Operation +
- 05000339/LER-1985-008-02, :on 850725,increased RCS Leakage Occurred. Caused by 2-inch Valve Packing Leak Off RCS Loop A.Maint Performed to Stop Leak +
- 05000499/LER-1991-010-01, :on 911224,pressurizer Spray Valve PCV-655C Failed Open,Resulting in Automatic Reactor Trip & SI Actuation on Low Pressure.Caused by Disengagement of Feedback Arm Linkage.Locking Nuts Added +
- 05000456/LER-1996-005-03, :on 960423,identified Operation of Safety Injection Accumulators Outside Design Basis.Caused by Mgt Deficiency.Operating Procedures Revised +
- 05000269/LER-1995-008, :on 951129,determined That Containment Isolation Valve Inoperable Due to Deficient Design Change. Valve 3RC-5 Disabled in Safety Position (Closed) Until Gear Ratio in Valve Corrected +
- 05000352/LER-1995-004-01, :on 950728,actuations of Units 1 & 2 PCRVICS Resulted from Blown Fuse When I&C Technician Inadvertently Grounded Starter Screwdriver.Performed Review of Appropriate I&C ST Procedures to Identify Physical Mods +
- 05000482/LER-1994-005, :on 940608,containment Spray Pump Was Declared Inoperable Due to Thermal Overload.Wcnoc Has Implemented Weekly Program of Manually Initiating Backwash for Each of ESW Pump Discharge Strainers +
- 05000324/LER-1993-001-02, :on 930205,reactor Bldg Roof Vent Radiation Monitor Declared Inoperable to Support Plant Mod Design Changes.Caused by Failure to Comply W/Procedural Requirements.Personnel Briefed +
- 05000254/LER-1990-002-05, :on 900204,determined That Only Reactor Bldg Differential Pressure of 0.24-inch Water Vacuum Could Be Obtained,In Violation of Tech Spec Required 0.25 Inch.Caused by Testing Deficiency.Leak Paths Sealed +
- 05000334/LER-1980-070-01, /01T-0:on 800922,unplanned Dilution of RCS Occurred.Caused by Boric Acid Blender Procedure Not Accounting for Manual Emergency Boration Flow Path Being in Svc.Procedure Has Been Changed +
- ML20057A344 +
- ML20080G313 +
- 05000315/LER-1997-026, :on 970925,potential for Overpressurization of Control Air Headers Was Determined to Be Unanalyzed Condition.Caused by Lack of Overpressurization Protection. Redundant SR Relief Valves Were Installed +
- 05000247/LER-2003-003, From Indian Point, Unit 2 Regarding Automatic Reactor Trip Initiated by a Main Turbine Trip on Auto Stop Oil +
- 05000341/LER-1995-006, :on 950602,main Turbine Trip Occurred Due to False Overspeed During Mechanical Overspeed Test.Revised Procedure 27.112.01 to Incorporate Holding Overspeed Reset Pushbutton Depressed at Least 15 Seconds +