Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000250/2008003 +
- ML17329A253 +
- ML18093A164 +
- ML19332G047 +
- ML042600282 +
- ML20148F097 +
- IR 05000250/2020002 +
- ML20153C710 +
- ML20151C112 +
- ML20197H825 +
- 05000354/LER-1999-009, :on 990820,license Condition Violation Re Min FW Temp Limits Were Noted.Caused by Lightning Strike. Recovered & Restored Plant Sys Affected by Electrical Transient +
- 05000277/LER-1988-010-01, :on 880506,primary Containment Isolation Sys Group II Isolation Signal Actuated.Caused by Fuse Being Pulled W/O Adequate Review of Permit & Applications to Sys. Fuse Replaced.Procedure Revised +
- 05000293/LER-1988-013, :on 880425,inadvertent Manual Start of Emergency Diesel Generator (EDG) B Occurred.Caused by Personnel Error.Improvements to Local Control Panel to EDG Identified & Tracked +
- 05000352/LER-1990-028-01, :on 901126,instrumentation & Controls Personnel Discovered That Facility Tech Specs Required Surveillance Requirements Not Met for Two Intermediate Range Monitors.W/ +
- ML20039D329 +
- 05000413/LER-1989-025, :on 890922,power Lost to Condenser Circulating Water Cooling Tower Fans Due to Deenergization of 13.8 Kv Auxiliary Switchgear.Caused by Weather Conditions.Reactor Power Reduced to Maintain Condenser Vacuum +
- ML20054K023 +
- 05000413/LER-1989-025-01, :on 890922,auxiliary Switchgear Deenergized, Resulting in Loss of Power to Condenser Circulating Water Cooling Tower Fans.Caused by Inoperable power-range Instrumentation Due to Hurricane Hugo +
- 05000413/LER-1989-025-02, :on 890922,13.8 Kv Auxiliary Switchgear Deenergized Resulting in Loss of Power to Condenser Circulating Water Cooling Tower Fans.Power Reduction Due to Hurricane Hugo +
- 05000272/LER-1980-020, Forwards LER 80-020/03L-0 +
- 05000260/LER-1999-005, :on 990617,ESF Actuation & HPCI Declared Inoperable.Caused by Personnel Error.Reset HPCI & Returned Sys to Operable Status with 25 Minutes.With +
- IR 05000400/1986085 +
- 05000397/LER-1989-029, :on 890703,RWCU & RCIC Sys Isolation Occurred When RWCU-V-1 Closed as Part of Group 7 Nuclear Steam Supply Shutoff Sys Isolation.Caused by Inadequate Preparation & Review of Surveillance Test Procedure +
- L-99-139, LER 99-S01-00:on 990813,uncompensated Loss of Ability to Detect within Single Intrusion Security Detection Zone Occurred.Caused by Procedure non-compliance.Involved Personnel Received Counseling Re Event.With +
- 05000266/LER-1998-002, :on 980108,failure of High Voltage Station Auxiliary Transformer Occurred Due to Ground in Low Voltage Side Bus Duct.Operability of 1X03 Was Restored & Verified to Be in Operation by Infrared Scan +
- 05000341/LER-1998-009, :on 980914,inadvertent Deenergization of Safety Bus 72F While Transferring from Alternate to Normal Power Resulted in ESF Actuations.Caused by Personnel Error. Operator Involved Was Counseled.With +
- 05000352/LER-1997-011, :on 971025,HPCI Sys Was Rendered Inoperable Due to Closing Turbine Exhaust Line Pciv.Caused by Valve failure.HV-055-1F072 Torque Switch Setting Was Increased within Analyzed Limits +