Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20046B256 +
- ML20045G525 +
- ENS 52334 +
- ML040760756 +
- ML20086G656 +
- ML20078K939 +
- ML20115D406 +
- ML20066D351 +
- ML20206H793 +
- 05000336/LER-2021-002, Failed Check Valve Resulting in Unnalyzed and Operation Prohibited by Technical Specifications +
- 05000213/LER-1998-002, :on 980421,determined That Visual Insp of Switchgear Cable Shaft Sprinkler Sys Was Not Being Performed Once Per 18 Months.Caused by Inadequate Implementation of License Amend.Fire Watch Patrol Established +
- 05000325/LER-1989-004-01, :on 890215,unplanned auto-isolation of RWCU Sys Inlet Outboard Isolation Valve G31-F004 Occurred Due to Spurious Actuation of Steam Leak Detection Instrumentation. Reactor Operator & Shift Foreman Counseled +
- 05000414/LER-1998-007-03, :on 981211,mispositioned Thumbwheel on Process CS Circuit Card Caused Inoperability of Overtemperature & Overpower Delta Temp Functions.Caused by Inadequate Program Design.Revised Procedures +
- 05000312/LER-1985-024, :on 851222,RCS Leakage Calculated to Be Between 15 & 20 Gallons Per Minute.Shutdown Initiated.Caused by Leaking Packing Gland SFV-70001.Gland Disassembled & Inspected.Twelve Rings of Packing Added +
- 05000341/LER-1996-014, :on 961004,Div 2 UHS cross-connect Valve de-energized.Caused by Loose Set Screw on Valve Operator Spline bushing.Cross-connect Path Established & Valves Will Also Be Modified W/Set Screw Recess +
- 05000267/LER-1985-004, :on 850317,unplanned Liquid Radwaste Release of Approx 900 Gallons Occurred While Recirculating from Monitor Tank.Caused by Isolation Valve V-6241 Failure.Valve Cleaned & Verified to Isolate.Procedures Under Review +
- 05000338/LER-1995-002-01, :on 950203,one Train of Ssps on Each Unit Declared Inoperable & Appropriate Action for TS 3.3.2.1 Entered.Caused by Original HELB Analysis Not Evaluating Potential Failure.Design Changes Implemented +
- 05000336/LER-1993-013, :on 930603,noted That Main Turbine Generator EHC Sys Caused an Increase in Pressurizer Pressure,Resulting in Reactor Trip,Due to Closing of Intercept & Cv.Operators Performed EOP & Sys Performed as Expected +
- 05000311/LER-1981-071, Forwards LER 81-071/03L-0.Detailed Event Analysis Encl +
- 05000311/LER-1981-071-03, /03X-1:on 810723,24 & 25,constant Speed Drive 22 Breaker Tripped from Unidentified Cause.Investigation Underway.Constant Speed Drive 21 Manually Closed +
- 05000397/LER-1991-013, :on 910507,non-compliances W/Tech Specs Identified as Part of Program of Surveillance Procedure Verification.Further Evaluation Performed.Quality Action Team to Be Chartered to Evaluate Program +
- ML25100A235 +
- 05000312/LER-1985-016-01, Corrected Pages of Rev 1 to LER 85-016-01 +
- L-99-073, Withdraws 990426 Request for Enforcement Discretion from Action Statement TS 3.7.13.1,as No Longer Needed +
- 05000272/LER-1980-004, Forwards LER 80-004/03X-1.Detailed Event Analysis Encl +