Retracts Four H Rept Made on 930624 Re 1H EDG Exhaust Muffler Bypass Valve,Required to Be Fully Open Being Discovered Partially Open.Based on Engineering Evaluation, EDG Ability to Perform Safety Function Not Affected
ML20046B256
Person / Time
Site: North Anna Dominion icon.png
Issue date: 07/28/1993
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
93-444, NUDOCS 9308030415
Download: ML20046B256 (2)


Text

,n

.- ~.

'I y

w Y1HUINIA Ex.ccruic Axp Pown:n CoMswxy RICIIMOND, VIRGINIA 00063 5

July 28, 1993 i

United States Nuclear Regulatory Commission Serial No.:

93-444 i

Attention: Document Control Desk NAPS /MPW/RMN Washington, D.C. 20555 Docket Nos.: 50-338 License Nos.: NPF-4 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT 1 CHANGE IN REPORTABILITY

+

On June 24,1993, a four hour report was made for having an inoperable Emergency Diesel Generator (EDG), pursuant to the requirements of 10CFR50.72(b)(2)(iii)(A).

i The 1H EDG exhaust muffler bypass valve, which is required to be fully open, was-discovered only partially open.

The EDG exhaust muffler bypass valve was

.l immediately restored to the full open position. Since diesel operability could not be verified with the bypass valve partially open, a four hour report was made.

I Based on an engineering evaluation, we have subsequently determined this event to be non-reportable. The ability of the EDG to perform its safety function was not l

affected. The use of the exhaust bypass valve, while a conservative measure, is not required to fully meet design basis requirements for operability of the EDG. Therefore, i

1H EDG was operable pursuant to Technica! Specification 3.8.1.1 and capable of achieving safe shut down.

Since the 1H EDG was operable and capable of performing its safety function, the four 1

hour report was not needed. Therefore, the four hour report made to the NRC on June 24,1993,is being retracted.

Due to the change in reportability, a thirty day written report pursuant to l

10CFR50.73(a)(2)(v)(A), is not required. This was discussed with the NRC Operation Center at 1624 hours0.0188 days <br />0.451 hours <br />0.00269 weeks <br />6.17932e-4 months <br /> on July 16,1993.

if you have any further questions, please contact us.

)

- Very truly yours, j SW

\\

,i L )dM a

W. L. Stewart

. Senior Vice President - Nuclear 024118-

/

0 930B030415 930728 U

gDR ADOCK0500g$

t J

cc:

U. S. Nuclear Regulatory Commission Region 11 101 Marietta Street, N. W.

Suite 2900 Atlanta, Georgia 30323 NRC Senior Resident inspector North Anna Power Station

.