Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ENS 52961 +
- ML18096B061 +
- RC-11-0050, 2010 Annual Operating Report +
- ML032380463 +
- ML20069K106 +
- ML20084U719 +
- ML20084H251 +
- ML20079M941 +
- ML20092F425 +
- ML20141E623 +
- 05000272/LER-1982-072, Forwards LER 82-072/03L-0.Detailed Event Analysis Encl +
- IR 05000254/1987019 +
- 05000318/LER-1989-006, :on 890417 & 19,discovered Tech Spec Requirement for Containment Closure During Core Alterations Not Satisfied.Caused by Inadequate Administrative Control. Corrective Actions Listed +
- 05000440/LER-1997-013, :on 971009,control Rod Drive Hydraulic Sys Maintenance Activities Resulted in Reactor Protection Sys Actuation.Caused by Personnel Error.Sro Responsible for Clearance of Tagout Was Counseled +
- 05000254/LER-1997-009-03, :on 970504,both Trains of Standby Gas Treatment Sys Were Inoperable.Caused by Cognitive Peersonnel Error. Blown Fuse Replaced,A Train of SBGTS Was Tested & Declared Operable & SRO Test Director Counseled +
- 05000374/LER-1985-033-02, :on 850701,Group IV Primary Containment Received During Work on RHR Sys High Flow Switches.Caused by Failure to Bypass Root Valves During Work on Sys Piping. Sys Change Initiated to Bypass Isolation Logic +
- 05000266/LER-1985-006, :on 850903,turbine Runback Occurred.Caused by Voltage Spike on Red Instrument Bus,Resulting in Momentary Downward Spike on Nuclear Instrumentation Sys.Red Inverter Inspected & Returned to Svc.All Sys Normal +
- 05000461/LER-1996-004, :on 960409,inadequate Job Preparation for Preventive Maint Task on Switchyard Breaker Caused MSIV Closure & Reactor Scram.Plant Procedures Revised +
- 05000334/LER-1984-012, :on 841018,offsite Power Temporarily Lost to 4 Kv Busses 1A & 1B.Caused by Faulty Current Transformer Switch & Location of Ground +
- 05000499/LER-1992-002, :on 920122,over Temp Delta Temp Trip Occurred. Caused by Personnel Error.Stp Setpoint Methodology Changed to Incorporate Current Changes to Safety Analyses +
- 05000368/LER-1994-003-03, :on 940824,discovered That Surveillance Testing of CEA Position Indication Not Performed as Required by TS Due to Personnel Error Associated W/Computer Software Change.Pms Software Revised +
- 05000266/LER-1993-007, :on 930726,inadvertent Emergency Diesel Start & Loss of Station Battery Charger Occurred Due to Blown Fuse During Calibr of 1A-06 Voltmeter.Blown Fuse Replaced & Instructions for Calibr Revised +
- ML20053B995 +
- ML20036A936 +
- IR 05000482/1989020 +
- 05000272/LER-2078-035-03, Loss of Power to No. 2 Station Power Transformer +
- 05000311/LER-1988-012-01, :on 880618,Tech Spec Action 3.5.2 Entered W/ Both Centrifugal Charging Pumps (CCP) Declared Inoperable. Caused by Individaul CCP Equipment Problems.Ccp Breaker Replaced +
- 05000272/LER-1978-035, Forwards LER 78-035/03L-0 +
- 05000397/LER-1994-018, :on 941115,util Failed to Comply W/Ts Action Requirement While Inoperable Control Rod Block Instrumentation Resulted in Exceeded Allowed Outage Time. Placed Channel a Trip Function in Tripped Condition +
- 05000305/LER-2005-001, Re Reactor Thermal Power Eight-Hour Average Limit Exceeded +
- 05000341/LER-2002-004, From Fermi 2 Regarding Reactor Scram Due to Loss of Condenser Vacuum on October 2, 2002 +