Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ENS 40902 +
- IR 05000272/2007002 +
- ML15141A151 +
- ML12234A251 +
- ML102500663 +
- ML18058B075 +
- ML18151A386 +
- LIC-16-0095, Transmittal of Revised Overall Integrated Plan for Fuel Permanently Removed from the Reactor Vessel to the Spent Fuel Pool in Response to Requirements for Mitigation Strategies for Beyond Design Basis External Events +
- BVY 11-040, Submittal of 2010 Annual Radiological Environmental Operating Report +
- L-2006-098, Annual Radiological Environmental Operating Report for Calendar Year 2005 +
- ML053060276 +
- ML052560269 +
- ML19329A807 +
- ML20038A769 +
- ML042660200 +
- ML040770606 +
- NOC-AE-03001656, Proposed Emergency Change to Technical Specification 3.8.1.1 to Support Diesel Generator Inspections +
- NOC-AE-03001653, Application for Amendment for Revision to Proposed Emergency Change to Technical Specification 3.8.1.1 +
- NOC-AE-03001647, Proposed Emergency Change to Technical Specification 3.8.1.1 Re Allowed Outage Time for Unit 2 Standby Diesel Generator 22 from 14 Days to 61 Days +
- L-03-096, May 2003 Monthly Operating Report for Beaver Valley, Units 1 & 2 +
- NL-02-159, November 2002 Monthly Operating Report for Indian Point Unit 2 +
- ML020510117 +
- ML20080Q261 +
- ML20116K233 +
- ML20115F387 +
- ML20138J833 +
- ML20134D139 +
- ML20127N448 +
- ML20149K771 +
- ML20206B993 +
- ML20155F130 +
- ML20205H896 +
- ML20065C584 +
- ML20210E426 +
- IP 71152, Problem Identification and Resolution (PI&R) +
- ML21067A645 +
- ML22067A210 +
- 05000286/LER-1985-004, :on 850320,during Plant Startup,Failure of Power Fuses for Nuclear Instrumentation intermediate-range Channel 36 Resulted in Three Reactor Trips.Caused by Intermittent Current Leak Across Test Switch +
- 05000286/LER-1985-004-01, :on 850320,control Power Fuses for Nuclear Instrumentation Range Channel 36 Failed,Resulting in Three Reactor Trips.Caused by Current Leakage Across Test Switch. Testing Performed.Investigation Continuing +
- IR 05000244/1982006 +
- 05000346/LER-1981-051-03, /03L-1:on 810820 & 29,borated Water Storage Tank Channel 3 Level Failed High.Caused by Faulty Preamplifier Board.Board Replaced +
- IR 05000219/1980019 +
- IR 05000334/1980001 +
- ML23194A015 +
- ML19003A475 +
- 05000255/LER-1992-038, :on 920825,reactor Tripped,Resulting from Loss of Preferred Ac Bus Y-20,coincident W/Blown Fuse in Second Channel of Rps.Caused by Failure of Inverter ED-07.All Fuses Checked & Plant Drawings/Vendor Manuals Updated +
- L-95-110, 1994 Annual Radiological Environ Operating Rept Turkey Point Plant Units 3 & 4 +
- IR 05000244/1986001 +
- ML17229A690 +
- LIC-16-0048, Request for Relaxation of March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events and Reliable Spent Fuel Pool Instrumentation (EA-12-049 +