Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- LIC-98-0106, Responds to GL 98-01, Yr 2000 Readiness of Computer Sys at Npps, Dtd 980511.Util Has Pursued & Continuing to Pursue Year 2000 Readiness Program Similar to That Outlined in Nei/Nusmg 97-07, Nuclear Util Year 2000 Readiness + (ML20236Y542)
- 05000302/LER-1986-001, :on 860101,failure of Reactor Coolant Pump a (RCP) Resulted in Reactor Trip and Emergency Feedwater Initiation.Caused by Failure of RCP Shaft.Rcp Shaft Replaced + (ML20236Y543)
- ML20236Y544 + (ML20236Y544)
- ML20236Y545 + (ML20236Y545)
- ML20236Y546 + (ML20236Y546)
- 05000483/LER-1987-032, :on 871108,reactor Trip Occurred on Low Steam Generator Level Oscillation Following Leaking MSIV Retest. Caused by Operator Retesting in Mode 2 Instead of Mode 3. Retest Will Be Performed in Mode 3 + (ML20236Y547)
- ML20236Y548 + (ML20236Y548)
- 05000424/LER-1987-065, :on 871109,containment Ventilation Isolation Occurred.Caused by Failure of Check Source Actuator to Fully Contract to Storage Position & Software Design Inadequacy. Personnel Counseled + (ML20236Y549)
- 05000254/LER-1987-022-04, :on 871109,intermediate Range Monitor (IRM) 14 Spiked hi-hi Resulting in Full Reactor Scram.Caused by Faulty IRM 14 Hardware.Irm 14 Will Be Investigated & Repaired + (ML20236Y550)
- NPL-98-0653, Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 2 + (ML20236Y551)
- LIC-98-0103, Responds to NRC Re Violations Noted in Insp Rept 50-285/98-11.Corrective Actions:Deluge Sys for TIA-3 Was Inspected & Repaired,Operators Involved Have Been Counseled & Memo Was Issued to Operators Re Proper Valve Operation + (ML20236Y554)
- ML20236Y556 + (ML20236Y556)
- 05000341/LER-1987-051, :on 870929,differential Pressure Actuation of Emergency Equipment Cooling Water Occurred.Caused by Design Deficiency in Reactor Bldg Closed Cooling Water Sys.Time Delay on Pressure Switches Lengthened + (ML20236Y557)
- 05000412/LER-1987-035, :on 871110,reactor Trip Occurred.Caused by lo-lo Level in Steam Generator C Due to Bent Disc & Stem on Valve 2CNM-DCV100.Valve Replaced by Masoneilan Valve W/Increased Differential Pressure Rating + (ML20236Y559)
- ML20236Y560 + (ML20236Y560)
- ML20236Y561 + (ML20236Y561)
- ML20236Y562 + (ML20236Y562)
- ML20236Y563 + (ML20236Y563)
- ML20236Y566 + (ML20236Y566)
- 05000338/LER-1987-023-01, :on 871124,Kaman Process Vent Normal Range Radiation monitor,RI-GW-178-1,declared Inoperable.Caused by Loose Connection Between Central Processing Unit Card & Sys. Central Processing Unit Card Replaced + (ML20236Y570)
- ML20236Y571 + (ML20236Y571)
- ML20236Y573 + (ML20236Y573)
- ML20236Y574 + (ML20236Y574)
- ML20236Y575 + (ML20236Y575)
- ML20236Y576 + (ML20236Y576)
- ML20236Y581 + (ML20236Y581)
- 05000461/LER-1998-024, :on 980708,failure to Perform Surveillance Testing on Div II Voltage Relays within Specified Frequency of TS Was Noted.Cause of Event Is Under Investigation.Util Expects to Issue Rev to Rept by 980907 + (ML20236Y583)
- ML20236Y586 + (ML20236Y586)
- ML20236Y588 + (ML20236Y588)
- ML20236Y589 + (ML20236Y589)
- L-98-204, Submits 90-day Response to GL 98-01, Yr 2000 Readiness of Sys at Nuclear Power Plants. Util Plans to Provide Required Confirmation or Status of Y2K Program No Later than 990701 + (ML20236Y590)
- 0CAN089801, Revises 961219 Submittal to Incorporate New Control Room Duct Radiation Monitor.Util Requests That Effective Date for Change Be within 30 Days of NRC Approval + (ML20236Y591)
- ML20236Y592 + (ML20236Y592)
- ML20236Y594 + (ML20236Y594)
- ML20236Y595 + (ML20236Y595)
- ML20236Y596 + (ML20236Y596)
- ML20236Y597 + (ML20236Y597)
- ML20236Y599 + (ML20236Y599)
- U-603059, Responds to Second RAI Re Proposed Amend to License NPF-62, Per 980727 Telcon + (ML20236Y601)
- ML20236Y602 + (ML20236Y602)
- ML20236Y603 + (ML20236Y603)
- ML20236Y607 + (ML20236Y607)
- ML20236Y608 + (ML20236Y608)
- ML20236Y611 + (ML20236Y611)
- U-603049, Submits 90-day Response to GL 98-01, Year 2000 Readiness of Computer Sys at Nuclear Power Plants. Util Has Pursued & Continuing to Pursue 2000 Readiness Program Similar to That Outlined in Nei/Nusmg 97-07 + (ML20236Y614)
- ML20236Y615 + (ML20236Y615)
- ML20236Y616 + (ML20236Y616)
- ML20236Y617 + (ML20236Y617)
- U-603058, Responds to Violations Noted in Insp Rept 50-461/98-09. Corrective Actions:Revised Plant Standing Order (PSO) 29, Emergency Security Notifications to Require That Security Activate ERDS Sys in Simulator + (ML20236Y619)
- ML20236Y620 + (ML20236Y620)
- ML20236Y621 + (ML20236Y621)