Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000334/LER-1999-011, :on 990909,inadequate Axial Flux Difference Monitor Alarm Surveillance Was Noted.Caused by Lack of Info in Operations Surveillance Test Procedures 1OST-5A.1 & 2OST-5A.1.Revised Procedures.With + (ML20217E873)
- 05000277/LER-1998-001-02, :on 960118,failure to Perform SR for First Recirculation Pump Start Was Noted.Caused by Inadequate Review of ITS Requirements.Revised Procedure to Include Appropriate SRs + (ML20217E874)
- IR 05000395/1997014 + (ML20217E875)
- ML20217E876 + (ML20217E876)
- ML20217E878 + (ML20217E878)
- ML20217E879 + (ML20217E879)
- ML20217E880 + (ML20217E880)
- ML20217E881 + (ML20217E881)
- ML20217E883 + (ML20217E883)
- ML20217E886 + (ML20217E886)
- ML20217E887 + (ML20217E887)
- ML20217E888 + (ML20217E888)
- ML20217E891 + (ML20217E891)
- ML20217E893 + (ML20217E893)
- ML20217E895 + (ML20217E895)
- ML20217E898 + (ML20217E898)
- 2CAN099706, Forwards Results of Pilot Plant Application Study Performed at Ano,Unit 2 for Review.Prompt Staff Review Is Requested. Formal Request for NRC Approval Will Be Made Following Submittal of Svc Water Sys Risk Evaluation in Dec 1997 + (ML20217E899)
- ML20217E900 + (ML20217E900)
- ML20217E901 + (ML20217E901)
- ML20217E902 + (ML20217E902)
- ML20217E903 + (ML20217E903)
- ML20217E905 + (ML20217E905)
- ML20217E906 + (ML20217E906)
- ML20217E907 + (ML20217E907)
- ML20217E909 + (ML20217E909)
- ML20217E910 + (ML20217E910)
- ML20217E911 + (ML20217E911)
- ML20217E914 + (ML20217E914)
- ML20217E915 + (ML20217E915)
- ML20217E916 + (ML20217E916)
- ML20217E918 + (ML20217E918)
- 05000498/LER-1999-008, :on 990912,unit Tripped During Performance of Main Turbine Emergency Trip Test Procedures.Caused by Failure in Turbine Trip Test Circuitry.Main Control Boards Were Cleaned & Other Panels Were Inspected + (ML20217E919)
- ML20217E920 + (ML20217E920)
- ML20217E921 + (ML20217E921)
- ML20217E922 + (ML20217E922)
- ML20217E923 + (ML20217E923)
- ML20217E925 + (ML20217E925)
- ML20217E926 + (ML20217E926)
- ML20217E927 + (ML20217E927)
- ML20217E928 + (ML20217E928)
- ML20217E929 + (ML20217E929)
- ML20217E930 + (ML20217E930)
- L-98-075, Submits Supplemental Response to Violations Noted in Insp Repts 50-334/97-08 & 50-412/97-08.Corrective actions:self- Assessments,External & Internal,Conducted That Evaluated Calibration Method & Practices Currently Employed + (ML20217E932)
- ML20217E933 + (ML20217E933)
- ML20217E934 + (ML20217E934)
- ML20217E935 + (ML20217E935)
- ML20217E937 + (ML20217E937)
- ML20217E938 + (ML20217E938)
- ML20217E939 + (ML20217E939)
- ML20217E943 + (ML20217E943)
- ML20217E944 + (ML20217E944)