Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000278/LER-1998-001, Forwards LER 98-001-00,re Failure of 3A Core Spray Pump to Meet TS 3.5.1 as Result of Foreign Matl Intrusion Into Pump Impeller Area + (ML20217E825)
- ML20217E826 + (ML20217E826)
- L-99-152, Submits Relief Request BV3-N-533-1,rev 0,requesting Use of ASME Approved Code Case N-553-1, Alternative Requirements for VT-2 Visual Examination of Class 1,2 & 3 Insulated Pressure Retaining Bolted Connections + (ML20217E827)
- ML20217E829 + (ML20217E829)
- ML20217E830 + (ML20217E830)
- ML20217E832 + (ML20217E832)
- 05000278/LER-1998-001-01, :on 971103,3A CS Pump Failed to Meet TS 3.5.1. Caused by Less than Adequate Focus on Foreign Matl Exclusion During 3R11 Suction Strainer replacement.3A CS Pump Was Disassembled,Matl Was Removed & Pump Was Reassembled + (ML20217E834)
- ML20217E837 + (ML20217E837)
- ML20217E838 + (ML20217E838)
- ML20217E839 + (ML20217E839)
- L-99-143, Informs That Subsequent Review of Approval Ltrs & SE for Relief Requests 1TYP-2-B5.40-1 (Rev 0),BV1-RV-AUG (Rev 1), BV2-RV-AUG (Rev 1),BV3-IWA-1 (Rev 1) & BV3-IWA-2 (Rev 1) Identified Erroneous Statements Which Dl Wishes to Correct + (ML20217E840)
- ML20217E841 + (ML20217E841)
- ML20217E842 + (ML20217E842)
- ML20217E844 + (ML20217E844)
- ML20217E845 + (ML20217E845)
- ML20217E846 + (ML20217E846)
- ML20217E847 + (ML20217E847)
- ML20217E850 + (ML20217E850)
- ML20217E852 + (ML20217E852)
- 05000277/LER-1998-001, Forwards LER 98-001-00,re Failure to Perform SR for RCS Temp Limits When Starting First Recirculation Pump + (ML20217E853)
- NOC-AE-000118, Forwards Proposed Response to 980305 RA Re Proposed Conversion to Improved Std Ts.Util Would Like to Use Proposed Response as Basis for Telcon to Be Conducted Wk of 980330 + (ML20217E854)
- ML20217E858 + (ML20217E858)
- ML20217E859 + (ML20217E859)
- ML20217E860 + (ML20217E860)
- ML20217E861 + (ML20217E861)
- ML20217E862 + (ML20217E862)
- 3F0398-11, Provides Table of Corrections/Revs to Thermo-Lag Exemptions Issued by NRC + (ML20217E864)
- ML20217E865 + (ML20217E865)
- ML20217E866 + (ML20217E866)
- ML20217E867 + (ML20217E867)
- ML20217E868 + (ML20217E868)
- ML20217E871 + (ML20217E871)
- ML20217E872 + (ML20217E872)
- 05000334/LER-1999-011, :on 990909,inadequate Axial Flux Difference Monitor Alarm Surveillance Was Noted.Caused by Lack of Info in Operations Surveillance Test Procedures 1OST-5A.1 & 2OST-5A.1.Revised Procedures.With + (ML20217E873)
- 05000277/LER-1998-001-02, :on 960118,failure to Perform SR for First Recirculation Pump Start Was Noted.Caused by Inadequate Review of ITS Requirements.Revised Procedure to Include Appropriate SRs + (ML20217E874)
- IR 05000395/1997014 + (ML20217E875)
- ML20217E876 + (ML20217E876)
- ML20217E878 + (ML20217E878)
- ML20217E879 + (ML20217E879)
- ML20217E880 + (ML20217E880)
- ML20217E881 + (ML20217E881)
- ML20217E883 + (ML20217E883)
- ML20217E886 + (ML20217E886)
- ML20217E887 + (ML20217E887)
- ML20217E888 + (ML20217E888)
- ML20217E891 + (ML20217E891)
- ML20217E893 + (ML20217E893)
- ML20217E895 + (ML20217E895)
- ML20217E898 + (ML20217E898)
- 2CAN099706, Forwards Results of Pilot Plant Application Study Performed at Ano,Unit 2 for Review.Prompt Staff Review Is Requested. Formal Request for NRC Approval Will Be Made Following Submittal of Svc Water Sys Risk Evaluation in Dec 1997 + (ML20217E899)
- ML20217E900 + (ML20217E900)